【SAKURA Law Office | Legal Update by Managing Partner Kenshiro Michishita】Publication of “When a Buyer Finds Defective Parts After Acceptance”

SAKURA Law Office | Legal Update No. 61 by Managing Partner Kenshiro Michishita

Inspection, notice and remedies for non-conformity in commercial sales under Japanese law

2026 edition | Law as at 9 November 2026 | Reviewed and revised on 15 November 2026

SAKURA Law Office | Managing Partner Kenshiro Michishita

A customer reports a slight leak even when a valve on its equipment is closed. The quality assurance team takes two solenoid valves of the same model from the warehouse and tests them. In both cases the measured leakage exceeds the limit in the specification. The delivery note bears an inspection stamp dated three months earlier. The invoice has been paid in full. The head of purchasing can work out the amount of any refund later. What does the buyer know today, and when should it tell the supplier?

Under a sales contract concluded in 2026, A, an equipment manufacturer in Japan, buys 200 solenoid valves from stock held by B, a parts distributor, at ¥20,000 each. The total is ¥4 million. All amounts in this example exclude tax. A takes delivery of model V60, lot K83, on 3 August 2026. On receipt, A counts the valves, confirms their model, inspects them visually and checks that a sample opens and closes at room temperature. It records a pass and pays B on 31 August. By the time the customer reports the leak on 2 November, 140 valves remain unused, 20 are in equipment awaiting shipment and 40 are in equipment already delivered to customers. This is a hypothetical sale of standard goods governed by Japanese law. Unless otherwise stated, the parties have made no agreement varying the statutory periods for inspection or notice.

Executive Summary

On 2 November, A knows enough to tell B that two valves failed the specified test and to give B the readings. Under Article 526 of the Commercial Code, a buyer in a sale between merchants must, as a rule, inspect the goods without delay after receipt and, on discovering a non-conformity, immediately send notice to the seller. Where a non-conformity in kind or quality could not be discovered immediately on inspection at receipt, the buyer must still send notice immediately upon discovering it within six months of receipt. Whether A’s November notice is in time therefore turns on whether an appropriate inspection in August could have revealed this defect. Establishing that the notice was sent within six months answers only part of the question. [1]

Both valves exceeded the limit. A does not yet know whether any of the other 198 are defective. It should suspend use of the lot, trace the equipment in which the valves have been installed and agree test conditions with B to establish how far the problem extends. The incoming inspection record is the starting point for deciding what to say in the first notice, which valves to replace, who should bear the cost of screening the stock and how to deal with units already on customers’ premises.

Chapter 1 What the inspection stamp actually records

The model number alone cannot establish the performance B promised. The edition of the specification identified in A’s purchase order sets the maximum leakage through a closed valve at 1.0 mL/min, with the fluid at 60°C and a pressure differential of 0.5 MPa across the valve. A placed its order on those terms, and B confirmed it. It establishes the performance B undertook to provide, irrespective of the temperature A’s equipment happens to tolerate. A printout from a web catalogue revised after delivery cannot, by itself, establish what the parties agreed when the order was placed. [2]

The inspection record shows what A signed off on 3 August. The model matched the note, the count was 200 and the valves sampled opened and closed at room temperature. If the record has no entry for leakage at 60°C, it cannot establish that a closed valve met the leakage limit at that temperature. The absence of a field on A’s own form does not establish that it performed an adequate inspection either. Relevant evidence includes the acceptance criteria agreed with B, the test equipment A could have made available and any history of the same problem. [1, 2]

Article 526 of the Commercial Code applies because A and B are both merchants acting in the course of business. In a judgment of 2 December 1960, the Supreme Court applied the provision to a sale of coal that had not been individually identified at the time of sale. A buyer who orders goods by model number therefore has no basis for postponing inspection merely because the individual serial numbers had yet to be determined when the contract was made. In a judgment of 26 February 1970 involving a car sold by a merchant, the Supreme Court declined to apply Article 526 because there was no evidence that the buyer was also a merchant. Where the buyer is not a merchant, Article 526 does not impose these inspection and notice requirements. [1, 17, 4, 16]

A bought the valves from B, the distributor that supplied them from stock. The manufacturer’s engineer may be able to explain the test method and help establish the cause of the leak. A technical enquiry to the manufacturer ordinarily leaves A with a separate obligation to notify B. The position may differ if the manufacturer is authorised to receive notice on B’s behalf. By checking the addressee on the purchase order, the issuer of the order confirmation and the notice address in the framework agreement, purchasing can open discussions with the seller while the factory investigates the cause. [1]

Chapter 2 Could the buyer have found the leak on receipt?

B’s first question will be why the leak went undetected in August. Article 526(1) requires inspection without delay after receipt. Article 526(2) requires the buyer to send notice immediately upon discovery. The statute specifies no fixed number of days or minimum sample size. If the buyer could choose a test for its own convenience, the seller could face a much later claim for a defect that an adequate inspection would have revealed. But an adequate inspection does not invariably require the buyer to dismantle every component and test it under every operating condition. [1]

Suppose the specification set out a test at 60°C, A could have taken the measurements quickly using its own incoming inspection equipment, and the same leak in an earlier delivery had led the parties to agree on additional checks. With those facts on record, A would have difficulty maintaining that the defect could not have been discovered on receipt. Its staff checked only that the valves opened and closed at room temperature. Sending notice on the day of discovery three months later would not in itself remedy a failure to inspect in August. [1]

Suppose instead that the parties had expressly agreed to check quantity, appearance and room-temperature operation on receipt and to use B’s pre-shipment test report to verify high-temperature performance. A’s position would be stronger if the report gave no reason for concern and a special test fixture was needed to stabilise temperature and pressure at levels representative of actual operation. Even then, A should check whether the report covered the correct lot and whether its readings approached the permitted limit. The availability of test equipment in November does not settle what A could reasonably have done in August. Nor does describing the defect internally as latent bring it within the six-month rule. [1]

A should record the operating conditions at the customer’s premises separately from the conditions under which it tested the unused valves. The leak at the customer’s site might be attributable to a pipe fitting, the direction in which the valve was installed or the use of a fluid outside the specification. A should identify each specimen and preserve the raw data with the instrument calibration records, fluid temperature, pressure differential and duration of each measurement. B should establish which individual valves it tested before shipment and what readings it obtained. Once both sides can reproduce the reported behaviour under agreed conditions, they will be better placed to identify the valves that need replacement.

Chapter 3 What the six-month and one-year periods govern

The duty to send notice immediately upon discovery covers non-conformity in kind, quality or quantity. The second sentence of Article 526(2) makes provision for discovery within six months only in respect of kind or quality where the non-conformity could not be discovered immediately on receipt. Recounting the valves some time after recording a count of 200 against the delivery note on 3 August is a different exercise from investigating a leak that occurs only at high temperature. If only 198 valves had actually arrived and a count on receipt would have revealed the shortage, A could not rely on the six-month provision to justify giving notice of the shortfall later. [1]

The tests on 2 November took place within six months of receipt on 3 August. If even an appropriate incoming inspection could not have revealed the quality defect immediately, A can preserve its ability to seek a remedy for that defect by sending notice immediately upon discovery on 2 November. First discovery the following March would fall outside this statutory rule. The same period can serve quite a different purpose under a contract. If the parties stipulate that the seller must receive written notice within six months of delivery, it is receipt of that notice that must take place within the period. [1, 6]

Article 566 of the Civil Code generally requires a buyer to notify the seller within one year of learning of a non-conformity in kind or quality. That general rule on sales does not give A a year to send the immediate notice required under the Commercial Code. Conversely, if B receives notice on 2 November, A need not quantify its damages or file suit that day. The former Civil Code required the buyer to exercise its rights. The current provision requires notice of the non-conformity. Even after giving notice, the buyer must keep track of the limitation period for each claim. [1, 2, 3, 5, 15]

Failure to give notice can also determine whether the price remains payable. In a judgment of 25 January 1972, more than a year had elapsed since the buyer took delivery of a heater. Having lost its right to terminate the contract or claim damages under the former Article 526, the buyer could not withhold payment on the ground that it was still entitled to full performance. Article 526(2) now expressly bars a buyer who fails to give the required notice from demanding cure, seeking a price reduction, claiming damages or terminating the contract on the basis of that non-conformity. If A misses that first notice, it risks losing the right to require B to replace even the valves it can prove were defective. [8, 1, 14]

Article 526(3) disapplies paragraph (2) where the seller knew of the non-conformity. Bad faith in this context means knowledge of the defect. There is no requirement that the seller intended to harm the buyer. The proviso to Article 566 of the Civil Code expressly covers both knowledge at delivery and gross negligence in failing to know. The Commercial Code refers only to knowledge. In a judgment of 8 December 2022 under the former law, the Tokyo High Court nevertheless treated the seller’s gross negligence on the facts of that case as equivalent to knowledge. A would need more than a general allegation that B’s inspection was lax. It matters which abnormal readings or incidents were reported to B, when, and in relation to which units or lot. A should send its initial notice without waiting to see whether it can prove what B knew. [1, 2, 7]

Chapter 4 Giving notice before the cause is known

On 2 November, a customer reports that fluid continues to leak after a valve is closed. A’s quality assurance team tests two unused valves from the same lot under the conditions specified in the contract. Both exceed the agreed limit. The team cannot yet say whether a valve caused the leak in the customer’s equipment. For the two valves it tested, however, it can identify the order, the specification and the measured leak rates. If A keeps the results to itself until it can dismantle the valves and establish the cause, B may lose the chance to test its own stock from the lot and have less time to secure conforming replacements. Article 526(2) of the Commercial Code requires the buyer to dispatch notice to the seller immediately upon discovering the non-conformity. [1]

A could send the following email that day to B’s designated contact for notices under the framework agreement.

We are writing about the 200 model V60 valves from lot K83 that we received on 3 August. A customer reported today that fluid continued to leak after a valve was closed. We tested two unused valves from the same lot at 60°C and a differential pressure of 0.5 MPa. Their leak rates were 3.2 and 3.6 mL/min respectively, against the agreed maximum of 1.0 mL/min. We give you notice that these two valves do not meet the contractual specification.

Of the 200 valves, 140 remain uninstalled, including the two tested. A further 20 are installed in equipment awaiting shipment and 40 in equipment already delivered to customers. We are investigating whether other valves are affected and what caused the leak at the customer’s premises.

We will retain both test specimens and the measurement records. Please preserve your remaining stock from the same lot and the pre-shipment inspection records. Please confirm receipt of this notice, propose dates for joint testing and let us know when replacement valves could be available.

The notice distinguishes the two valves for which A has measurements from the 198 that still require investigation. Results for two valves do not establish a defect throughout the lot. An email mentioning only the two specimens, however, would leave B unaware that 40 valves were already in equipment at customers’ premises. As further units are confirmed to be affected, A should identify them to B, even if they belong to the same lot. If A finds a problem with a different model or observes a new symptom, it should send a further notice describing what it has found. A keeps B’s acknowledgement together with the email as sent, its recipients and the attached test records. The next day, it can show B’s technical staff precisely which results were shared and when.

A Tokyo District Court judgment of 27 September 2002 illustrates how much detail a notice may need. The buyer had acquired land for a residential development. Shortly before a six-month contractual period expired, it informed the seller through an officer of the bank that had brokered the sale that underground obstructions had been found during construction and that it would take time to establish their full extent. The court held that the notice satisfied the particular clause. It identified the nature and approximate extent of the obstructions sufficiently for the seller to consider its response. Describing what has been found and putting a final figure on the resulting expense are separate tasks. The Supreme Court’s judgment of 20 October 1992 distinguished notification of a defect from an expression of intent to claim damages in the context of the former Civil Code’s time limit for exercising a right. A buyer giving its first notice under current law can identify the defect now and quantify the loss later. [6, 5, 2, 1]

Chapter 5 What the buyer can claim when eight valves fail

By the end of joint testing, eight of the 140 valves in stock have failed to meet the specification. A paid the full ¥4 million on 31 August. At ¥20,000 per valve, its accounts department might reasonably start with a claim for ¥160,000. The remedy will depend, however, on whether the eight can be replaced in time or whether they retain value for a limited use despite their impaired performance. The other 60 valves are still under investigation, including the 20 installed in equipment awaiting shipment and the 40 in equipment already delivered. A’s written claim should distinguish confirmed failures from units still under investigation. [2]

If A needs conforming valves to restart production, it can identify the eight failed units by serial number or another identifier and ask B to deliver replacements. Article 562 of the Civil Code allows a buyer to seek cure, including repair or replacement. The seller may choose a different means of cure if it imposes no unreasonable burden on the buyer. If B offers to repair the valves, A should consider whether retesting will establish compliance with the specification and when production can resume. If its process or schedule makes replacement the only workable option, A should explain why. A claim for cure does not depend on negligence by the seller, but it is unavailable where the non-conformity is attributable to the buyer. The power supply and installation conditions should therefore also be recorded. [2]

As a rule, before claiming a price reduction A must demand cure, allow B a reasonable period to provide it and establish that the period expired without cure. The Code dispenses with a prior demand in specified cases, including where cure is impossible or B unequivocally refuses to provide it. The reduction must reflect the degree of non-conformity. A refund of ¥160,000 does not follow automatically. As with cure, A cannot claim a reduction for non-conformity attributable to it. If A considers termination after a demand, it should examine the breach that remains when the period expires. A minor breach, assessed in light of the contract and generally accepted standards applicable to the transaction, will not justify termination on that ground. Termination of the whole contract without a prior demand requires a statutory ground, for example where part of the performance is impossible and the remainder alone cannot achieve the contract’s purpose. A looming internal shipping date would not, by itself, entitle A to terminate the entire sale immediately. Termination does not require fault on the seller’s part, but Articles 541 and 542 do not permit the buyer to terminate for non-performance attributable to the buyer. [2]

The ¥120,000 spent screening the lot is a separate expense from any fall in the valves’ value. To recover it as damages, A must show why the non-conformity made screening necessary and substantiate the loss, for example with the number of units screened, the hours worked and any external testing invoices. It must consider whether the loss would ordinarily arise from the breach and, if it arose from special circumstances, whether B ought to have foreseen those circumstances. Unlike cure, damages are unavailable if the non-performance arose from a cause that cannot be attributed to B in light of the contract and generally accepted standards applicable to the transaction. If stopping installation when the problem came to light would have avoided further expense, A’s own negligence in causing or aggravating the loss also bears on recovery. In negotiations, the parties should distinguish the value restored by replacing eight valves, any loss in value addressed by reducing the price and the separate outlay on screening. That distinction prevents double recovery. [2]

Chapter 6 When the buyer may return defective goods

A selected the solenoid valves by model number from B’s stock of standard, ready-made products. Neither the quantity ordered nor A’s intention to install them in equipment establishes that it commissioned their manufacture. The immediate questions are whether the valves met the specification when delivered and what A told B once it discovered the fault. [12]

Suppose instead that, in 2026, A specifies its own pressure rating and seal material and commissions a component manufacturer to make valves to that specification for equipment A sells. If the transaction falls within Japan’s SME Transactions Act (Toriteki Act), taking into account the applicable thresholds for capital or employee numbers, Article 5(1)(iv) governs any requirement that the manufacturer take back components already delivered. Describing the order as a sale does not alter what A commissioned. The agreed specification and the inspection criteria stated when the order was placed determine whether there is a reason for return for which the SME supplier is responsible. A cannot tighten its acceptance criteria after a customer complains and require the manufacturer to take goods back for failing the new test. [10, 11, 12]

The Japan Fair Trade Commission (JFTC), in its questions and answers on the Act, distinguishes prompt return of items that fail inspection on receipt from return of items that have already passed inspection. In the latter case, where the non-conformity could not be discovered immediately, the general rule is that the return itself must take place within six months of receipt. If the commissioning business gives consumers a warranty of more than six months on its own product incorporating the component, the period for return may correspond to that warranty, up to one year. There is no basis for assuming such a consumer warranty where the valves are installed in industrial equipment. The JFTC’s operating guidelines give an example of a prohibited return in which a business required its supplier to take back machine parts ten months after receipt because they differed from what it had ordered. Even if the buyer discovers the defect in time and immediately notifies the seller under Article 526, it must still establish whether the proposed return is in time under the SME Transactions Act. [11, 12]

Where an ongoing trading relationship uses lot-based sampling, a supplier may in some circumstances be required to take back an item with a readily detectable defect from a lot that passed inspection, up to the time of the first payment for that delivery. The parties must have agreed the conditions for return in writing or equivalent form before the order and linked those conditions to the terms disclosed when placing the order. They must also discuss a unit price that takes the burden of returns into account. In either case, purchasing and quality assurance should agree whether the supplier is receiving the specimens temporarily for investigation or being asked to take them back permanently at its expense. Legal Update No. 36 discusses the types of commissioned transactions and business size criteria that bring a transaction within the Act. [11, 12]

Chapter 7 Replacing eight valves while sixty await testing

On 4 November A and B record the test temperature, differential pressure, measuring instruments and pass criteria in a single protocol and jointly examine all 140 unused valves. Eight, including the original two, exceed the limit. The remaining 132 pass under the same conditions. A shows B the six further failures as they are identified. That day it sends the measurement results and a list identifying all eight valves to the contact designated in the contract. The complaint arose at a customer’s premises, but the condition of the valve installed there remains unknown. The results for the unused valves alone establish neither that the 40 in equipment already delivered are sound nor that all need replacing. [1, 2]

Suppose that on 6 November A and B agree that B will replace the eight failed valves with conforming units at its expense and bear the ¥120,000 cost of the joint screening. A has already paid ¥4 million. It pays nothing further for the replacements. It does not also recover the ¥160,000 it paid for those eight valves. Their written agreement should specify the replacement delivery date and inspection conditions, when B will pay the screening costs, and the identifiers and handover arrangements for the eight units being returned. The ¥120,000 is a figure the parties agreed after reviewing the records. Eight failed tests do not in themselves give rise to a statutory claim for that sum. The 132 other valves passed under the stated conditions. Passing that test does not itself amount to a fresh warranty of their performance in other respects.

The harder drafting question concerns the 60 valves that have yet to be examined. A holds back shipment of the equipment containing 20 of them. For the 40 installed in equipment already delivered, it matches the equipment serial numbers to the valve lot and agrees an inspection plan with the customer in light of operating conditions. A closing sentence stating that “neither party has any further claim against the other in connection with this matter” could itself give rise to the next dispute. The agreement should specify whether unexamined valves, costs of work at customers’ premises and further non-conformities are included in the settlement, and what further findings will trigger renewed discussions, taking account of when they emerge. Reserving outstanding issues does not of itself extend notice periods or postpone expiry of the applicable limitation period. A should continue to report new results as they emerge. Any agreement to change a contractual notice deadline should be express. For limitation purposes, the parties should check whether they have agreed in writing or by electronic record to hold discussions and, if so, for how long that agreement postpones expiry of the limitation period. [1, 2]

For the eight valves to be exchanged by agreement, the parties can decide who will collect them, when collection will take place and which specimens should be retained for examination. If a buyer terminates a sale between merchants, Article 527 of the Commercial Code generally requires it to retain the goods or place them on statutory deposit, in either case at the seller’s expense. If they are at risk of loss or damage, the buyer must obtain permission from the district court with jurisdiction over the place where the goods are located, sell them by auction, and retain the proceeds or place them on deposit. It must dispatch notice to the seller without delay after the auction. Article 527 does not apply if both parties’ places of business, or their addresses if they have none, are within the same municipality. For this purpose a municipality includes a special ward. In a designated city the relevant area is a ward or an administratively consolidated ward. Article 528 applies these rules, with the necessary modifications, to goods of the wrong description and to quantities delivered in excess of the order. Whatever procedure applies, discarding the failed specimens now would foreclose a later examination of whether the cause lay in the valves or the operating conditions. [1]

For their next order, A and B could specify which characteristics A will check on receipt and which it will test later. The acceptance record would then show exactly what signing it confirms. The published terms for the purchase of goods used by Narita International Airport Corporation generally allow one year from discovery to give notice for a claim for cure by the method the purchaser designates or for damages. They expressly exclude Article 526 of the Commercial Code and the proviso to Article 562(1) of the Civil Code. A goods purchase contract published by the Japan Coast Guard’s 11th Regional Coast Guard Headquarters addresses equipment to be fitted to a vessel under construction. It provides a period for discovering a non-conformity running from delivery of the equipment to one year after the purchaser takes delivery of the vessel. Each provision forms part of a particular procurement. Neither governs A’s purchase from B. [9, 13]

Before placing its next order, A can agree with B when A will check quantities and appearance on receipt, when B will provide high-temperature test results for each lot, and how to test characteristics that can be assessed only after installation. The contract can then specify what acceptance means for payment, the deadline for notifying B of quality failures discovered later, and whether the notice must be sent or received by that deadline. The practical test comes the next time a single valve leaks. The people on the shop floor should know when to halt shipment or installation, whom to contact at the other company and what information that person needs.

Frequently Asked Questions

Q1. We signed off on the goods and paid for them. Can we still ask the supplier to replace them?

Check what the acceptance record covers and what the contract says happens on acceptance. A record of the quantity received and a functional test at room temperature does not establish how the parts performed at the specified higher temperature. Payment alone does not extinguish the right to require cure. If the buyer overlooked a non-conformity that an inspection on receipt would have revealed, however, Article 526 of the Commercial Code may bar the claim. Establish when notice was given and whether the goods have a defect that warrants replacement. [1, 2]

Q2. How soon must we inspect incoming components, and how extensive must the inspection be?

Article 526(1) of the Commercial Code requires the buyer to inspect the goods without delay on receipt. It sets no fixed period of three days or one week. Consider the inspection period agreed in the contract, the performance specified, the number of units, the difficulty of testing, the parties’ previous practice and any reason to suspect a fault. Agree the equipment and test conditions before delivery and record any characteristic that could not be checked on receipt. The record will then show exactly what the inspection established. [1]

Q3. If fewer than six months have passed since receipt, can we wait before reporting a defect we have found?

For a non-conformity in kind or quality that could not be discovered immediately on receipt, the six months under the Commercial Code concern the time of discovery. Once the buyer discovers the non-conformity, it must immediately send notice to the seller. There is no general six-month window for reporting every discrepancy, including a shortfall in quantity. If the contract requires notice to reach the seller within six months of receipt of the goods, the buyer must also comply with that requirement. [1, 6]

Q4. Can our complaints procedure use the Civil Code’s deadline of one year from discovery?

If Article 526 of the Commercial Code applies to the sale between merchants, waiting that long may cost the buyer its remedies. Record the discovery date and the date and time of dispatch. For a non-conformity in kind or quality covered by Article 566 of the Civil Code, also retain the communication that reached the seller and evidence of its receipt. Read the framework agreement and the individual order together. The parties may have excluded the Commercial Code rule and agreed their own notice period. [1, 2, 9]

Q5. We phoned the manufacturer’s engineer and asked for an investigation. Does that count as notice?

Article 526 of the Commercial Code does not prescribe a particular form. If a distributor sold the goods, establish on whose behalf the engineer took the call and what information reached the seller. Follow any contractual requirement for written notice or a designated address. After the call, send the seller’s designated contact the order and lot details, a description of the fault and the date and time of discovery. Obtain confirmation of receipt. [1, 6]

Q6. What should we tell the seller before we know the cause of the fault or the cost of a recall?

Identify the affected units and the specification they failed to meet. Give the test conditions and readings, and say which units remain to be examined. The seller can then inspect the parts and, if necessary, stop shipments. In this case, the notice should distinguish the leakage measured in two unused valves from the problem reported at the customer’s site. It need not await a final loss figure. Send the results as each of the six further failures is confirmed and describe any newly discovered fault that differs from the first. [1, 6]

Q7. What if we suspect the supplier already knew about the fault before shipment?

Article 526(3) of the Commercial Code makes an exception to paragraph (2) where the seller knew of the non-conformity. Establish what shipment-release records and test results for the same lot the seller held, and when any requests for corrective action or returns occurred. Preserve your own inspection and notice records. A manufacturer’s knowledge does not necessarily establish what the distributor that sold the goods knew. The Tokyo High Court decision under the former law treating gross negligence as equivalent to knowledge turned on the evidence in that case. [1, 2, 7]

Q8. Can we dismantle the faulty parts ourselves and send them straight back?

Make the equipment safe first. Record the condition of each part, its identifying number and the readings before dismantling it. If a test will destroy the specimen, give the seller an opportunity to attend and retain untested specimens. Sending a part for examination, returning it for replacement and holding goods after termination each have a different legal basis. Where Article 527 of the Commercial Code applies after termination, notifying the seller alone does not discharge the buyer’s duty to safeguard the goods. [1]

Q9. If eight of the 200 parts fail, can we recover the ¥160,000 paid for those eight?

If the seller supplies conforming replacements as a cure, the buyer has no automatic entitlement to a refund as well. A buyer seeking a price reduction must generally first demand cure and allow a reasonable period for it. The amount of the reduction depends on the extent of the non-conformity. Assess any refund of part of the price separately from a claim for the cost of screening the lot. For the latter, show why screening was necessary, how the expense arose and how much it cost. Damages are unavailable if the non-performance arose from a cause that cannot be attributed to the seller in light of the contract and generally accepted standards applicable to the transaction. [2]

Q10. Can the restrictions on returns under the SME Transactions Act apply to purchases of the same parts?

Much depends on what the buyer commissioned. Buying standard finished parts from stock differs from commissioning another business to manufacture them to the buyer’s specification. In the latter case, check when the order was placed, the nature of the work, the category of transaction and the size criteria for the businesses involved. Where the Act applies, discovering a fault and notifying the supplier do not give the buyer an open-ended right to require it to take the goods back. Consult the Japan Fair Trade Commission’s guidance on the inspection method and the timing of the return itself. [10, 11, 12]

Q11. Our framework agreement includes a one-year warranty. Does that displace Article 526 of the Commercial Code?

Read the warranty in the context of the whole agreement. A promise to provide repairs for a year, a warranty covering specified performance and an agreement to vary the statutory inspection and notice rules serve different purposes. Identify when the year begins, what must happen within it, whether Article 526 applies and which obligations survive acceptance. If a characteristic can be tested only after installation, the contract should tell both parties when the test can be carried out and how long the seller remains responsible. [1, 9, 13]

Q12. We have given notice and are still negotiating. How should we manage the limitation period?

Keep a separate timetable for notice under the Commercial Code and for the limitation period governing each claim (extinctive prescription under Japanese law). As a general rule, Article 166(1) of the Civil Code allows five years from the time the creditor knows it can exercise the right or ten years from the time the right can be exercised, whichever expires first. An email that merely reports a fault cannot be treated as a demand for performance on every claim or as the seller’s acknowledgement of a debt. Identify each claim and record the relevant dates. Any demand for performance, agreement to hold discussions or claim brought in court must satisfy its own statutory requirements to affect the running of time. [2]

About the Legal Update Series by Kenshiro Michishita

In this series, Kenshiro Michishita, Managing Partner of SAKURA Law Office, examines the law governing commercial transactions and business decisions through legislation, judgments and published materials. This issue follows a component buyer from its incoming inspection records and the customer’s first report of a fault through to an agreement with the seller. Legal Update No. 36 examines the terms and payment rules for orders that qualify as commissioned manufacture under the SME Transactions Act.

Legal Update No. 36 | Japan’s Toriteki Act and Supply-Chain Reform

SAKURA Law Office | Kenshiro Michishita, Managing Partner

How SAKURA Law Office Can Assist

When a fault emerges in goods supplied, we compare the specification agreed at the time of the order with the records of pre-shipment and incoming inspection, the affected goods and the parties’ correspondence. We advise on notice, demands for cure, adjustments to the price and compensation for customers. For ongoing supply relationships, we review the quality assurance agreement alongside the framework sales agreement so that the agreed tests, notices to the seller and allocation of costs reflect how the components are actually made, received and used.

Contact SAKURA Law Office

Principal References

The reference numbers in the text and FAQs link to the Japanese sources. The analysis date remains 9 November 2026; the sources and text were reviewed on 15 November 2026. Legislation is cited as in force on the analysis date, and decisions under the former law are identified in the text. English translations are reference materials; the Japanese statutory text governs.

01 Commercial Code. Act No. 48 of 1899, Arts. 4, 16 and 526–528. Inspection and notice in sales between merchants. Custody or deposit after termination, and the treatment of goods different from those ordered or delivered in excess. English translation, Article 526 (through Act No. 29 of 2018).

02 Civil Code. Act No. 89 of 1896, Arts. 147, 150–152, 166, 415, 416, 418, 541–543 and 562–566. Limitation periods, cure, price reduction, damages, termination and notice of non-conformity. English translation, Article 562 (through Act No. 37 of 2021).

03 House of Representatives, Committee on Judicial Affairs, 192nd Diet, meeting No. 13. 6 December 2016, statement 12 by government representative Ogawa. The buyer’s remedies and the reasons for replacing the former requirement to exercise a right within one year with a duty to give notice.

04 Supreme Court of Japan, Second Petty Bench, 2 December 1960. 1958 (O) No. 409, Minshū, vol. 14, no. 13, p. 2893. Claim for the price of coal. Application of Article 526 to a sale of goods not individually identified. See p. 1 of the judgment.

05 Supreme Court of Japan, Third Petty Bench, 20 October 1992. 1988 (O) No. 1543, Minshū, vol. 46, no. 7, p. 1129. Notice under the Commercial Code and the separate requirement under the former Civil Code to exercise a remedy for a defect. See pp. 2–3.

06 Tokyo District Court, 27 September 2002. 2001 (Wa) No. 19581. The contractual period for notifying the seller of buried obstructions on a development site and the information needed to give effective notice under that clause. See pp. 5 and 7.

07 Tokyo High Court, 8 December 2022. 2022 (Ne) No. 1694, Hanrei Taimuzu, no. 1521, p. 131. Under the former law, the court treated the seller’s gross negligence as equivalent to knowledge on the facts. The link opens the publisher’s public summary of the holding. The full judgment appears in the cited issue.

08 Supreme Court of Japan, Third Petty Bench, 25 January 1972. 1971 (O) No. 533, Saibanshū Minji, no. 105, p. 19. A claim for the price of heating equipment and the buyer’s ability to demand conforming performance under the former Article 526. See pp. 1–2.

09 Narita International Airport Corporation, Terms and Conditions for the Sale of Goods. Article 8(2), (3) and (6). Notice for claims for cure by the method specified by the buyer or for damages. Express exclusion of Commercial Code Article 526 and the proviso to Civil Code Article 562(1). See PDF pp. 1–2.

10 Act on Preventing Delay in Payment to Small and Medium-Sized Entrusted Business Operators in Relation to Manufacturing Consignment. Act No. 120 of 1956, known as the SME Transactions Act (Toriteki Act). Article 2 defines the transactions and parties covered, Article 4 requires disclosure of terms, and Article 5(1)(iv) restricts returns. Article 2(2) of the Supplementary Provisions to Act No. 41 of 2025 addresses orders placed before or after commencement. JFTC English translation of the Act.

11 Japan Fair Trade Commission, Guidelines on the Application of the SME Transactions Act. Part IV, section 4, on returns. Timing of inspection and collection. Example 4-4 concerns machine parts returned ten months after receipt.

12 Japan Fair Trade Commission, Questions and Answers on the SME Transactions Act. Q17 concerns purchases of standard goods. Q106 and Q107 cover returns of defective goods, including units from a lot that passed inspection. References in the text link to the individual questions.

13 Japan Coast Guard, 11th Regional Coast Guard Headquarters, Contract for the Sale of Goods. Article 19(1). The period for discovering a non-conformity after title passes and the separate provision for goods to be installed on a vessel under construction. See PDF pp. 7–8.

14 Act on the Revision of Related Laws in Connection with the Enforcement of the Act Partially Amending the Civil Code. Act No. 45 of 2017. Article 3 amended Article 526 of the Commercial Code; Article 4(8) contains transitional provisions. Text as enacted, published by the House of Representatives.

15 Act Partially Amending the Civil Code. Act No. 44 of 2017. Revised Articles 562–566 set out the remedies for non-conformity and the notice required of a buyer. See also Article 34(1) of the Supplementary Provisions on contracts concluded before commencement. Text as enacted, published by the House of Representatives.

16 Supreme Court of Japan, First Petty Bench, 26 February 1970. 1969 (O) No. 1198, Saibanshū Minji, no. 98, p. 291. Article 526 did not apply to a car sale where there was no evidence that the buyer was a merchant. See p. 1.

17 Companies Act. Act No. 86 of 2005, Art. 5. Acts a company carries out as its business or for the purposes of its business are commercial transactions. English translation, Article 5 (through Act No. 90 of 2014).

Disclaimer

This article provides general information based on Japanese law and published materials as at 9 November 2026 and was reviewed and revised on 15 November 2026. The companies, product, amounts, dates and test results in the solenoid valve example are hypothetical. Liability and the scope of any claim depend on the date and terms of the contract, the inspection method, the contents of the notice, the evidence available to the parties and the other circumstances of the transaction.