【SAKURA Law Office | Legal Update by Managing Partner Kenshiro Michishita】Publication of “Japan’s 2026 Unit Ownership Reforms and Condominium Regeneration”

SAKURA Law Office | Legal Update by Managing Partner Kenshiro Michishita | No. 52

Meeting Resolutions, Rebuilding, Adjustment of Rights and Real Estate Transactions (2026 Edition)

Analysis cut-off: 3 November 2026 | Pre-publication review and revision: 14 November 2026

SAKURA Law Office | Managing Partner Kenshiro Michishita

The future of an ageing condominium cannot be decided simply by choosing whether to retain or replace the building. Funding for continuing repairs, authority to undertake work inside individual units, the value of space allocated after rebuilding, consideration payable to owners who leave, tenants’ homes and businesses, and existing housing loans all intersect within a single plan. Even substantial majority support will not turn a resolution into an executable project if ownership cannot be transferred, possession cannot be obtained or financing conditions remain unsatisfied. Conversely, postponing necessary repairs until a regeneration plan is finalised can allow losses to accumulate during the very period devoted to considering the building’s future.

The amendments enacted by Act No. 47 of 2025, promulgated on 30 May 2025, respond to such obstacles to management and regeneration by restructuring meeting procedures, the treatment of unit owners whose identity or whereabouts cannot be established, alternatives to rebuilding, termination of leases and project implementation. The principal amendments to the unit ownership regime and the condominium regeneration framework took effect on 1 April 2026. The legislative package, however, amends several statutes and has more than one commencement date. Provisions including applications by developers for approval of management plans at the new-construction stage take effect on 1 April 2027. The entire package cannot be presented as a single set of mechanisms already available for use. [2, 4, 19, 20]

It would be wrong to characterise the reform as permitting a small group of owners to disregard absentees and rebuild at will. Attendance-based thresholds for management resolutions differ from the thresholds calculated by reference to the whole relevant ownership and voting constituency for rebuilding and other regeneration decisions. Excluding unidentified or untraceable owners from the voting denominator requires a court decision; it does not extinguish dissenters’ rights or tenants’ entitlement to compensation. The legal task is not to simplify the arithmetic of consent, but to identify which decision binds whom and which matters continue to require a separate agreement or procedure. [1, 2]

With an analysis cut-off of 3 November 2026, this Update examines the promulgated amending legislation, the Ministry of Land, Infrastructure, Transport and Tourism’s (MLIT) March 2026 regeneration manuals, its April 2026 revision of the guidelines on external managers, and court procedural materials. A pre-publication review and revision was completed on 14 November 2026. The Update is directed to management associations and unit owners, as well as corporate purchasers, investors, developers, financial institutions and their legal advisers. Its principal focus is a single building under unit ownership, following the process from collective decision-making to transaction execution and dispute prevention. Housing complexes, disaster-damaged buildings and buildings on leasehold land are subject to particular rules; the numerical thresholds discussed here should not simply be transposed to those cases. [4, 8, 9, 10, 11, 12, 13, 16]

Executive Summary

For each proposed resolution under the amended regime, the association must establish whether an ordinary or special resolution is required, the applicable quorum, whether the denominator is attendance or the whole relevant constituency, and whether both owner headcount and voting rights must be counted. For amendments to the bylaws, for example, the general rule requires attendance representing a majority of the relevant unit owners and a majority of voting rights, followed by approval by at least three-quarters of the owners present and at least three-quarters of their voting rights. Rebuilding, by contrast, generally requires at least four-fifths of all relevant unit owners and of all voting rights, reduced to at least three-quarters of each where a statutory objective condition is met. The treatment of persons without voting rights, the scope for adjustment through the bylaws and any individual-consent requirements must also be checked. [1, 2, 5, 6]

The reform also establishes resolution mechanisms for building renewal, a combined sale of the building and its site, demolition followed by sale of the site, and demolition alone. Statutory building renewal is not ordinary major repair work. For a combined building-and-site sale and certain other decisions, the value of shares in site-use rights is an additional voting criterion alongside owner headcount and voting rights. Nor is an unknown owner the same as an owner who disagrees. Judicial exclusion from voting, management of an exclusively owned unit with an unknown owner, remedies for deficient management, and appointment of a Japan-based administrator for an overseas owner each serve different purposes. [1, 2, 7, 8, 9, 10, 11]

Execution after the resolution is what determines whether the project succeeds. The initial plan and contracts must accommodate notices to non-participating owners and deadlines for statutory demands for sale, lease-termination demands and tenant compensation, arrangements with mortgagees, project authorisations, fluctuating construction costs, temporary accommodation and funding shortfalls. Conflicts of interest where a management company also acts as the statutory manager, and management-fee arrears that may be recoverable from a purchaser, directly affect feasibility. The starting point for using the reforms is a consistent set of assumptions linking the building’s technical assessment, the ownership and security structure, collective agreement and funding. [5, 9, 10, 13, 16, 17]

1. The Legal Structure: Management, Regeneration and Project Implementation

A regeneration review should begin with the existing rights, not the developer’s visualisation of the completed building. Without identifying ownership of each unit, shares in common areas, site-use rights, parking and other use arrangements, retail and office units, tenants and secured creditors, it is impossible to establish who may vote, whose consent is needed or to whom money must be paid. Where one person owns several units, a unit is co-owned or an inheritance has not been settled, the number of units cannot safely be treated as the number of unit owners. Voting rights likewise do not invariably follow a one-unit, one-vote model: the legislation must be read alongside the actual bylaws. [1, 5, 9]

The Act on Building Unit Ownership, etc. (Act No. 69 of 1962), referred to here as the Unit Ownership Act, governs the fundamental management relationships, decision-making at owners’ meetings and the legal consequences of rebuilding and related resolutions. The separate Act on Facilitation of Condominium Regeneration, etc. (the Condominium Regeneration Act), as amended and renamed from the former legislation on facilitating rebuilding, governs project procedures such as establishing regeneration associations, preparing project plans, converting existing rights into new rights and extinguishing rights. A valid resolution under the Unit Ownership Act, use of the corresponding statutory project procedure, and the required building or town-planning permissions are distinct conditions that must each be satisfied. [1, 2, 3, 4, 16]

The organisations involved are also distinct. The management association composed of unit owners, an incorporated management association, a committee exploring regeneration, an authorised regeneration association and a participating developer occupy different legal positions. A committee’s selection of a preferred participant does not itself confer authority to dispose of every owner’s property. At each stage—selecting a project partner, commissioning investigations, entering a framework agreement, adopting a regeneration resolution and approving a project plan—the decision-maker, the representative’s authority and the limits of commitments to third parties must be established. [9, 10, 16]

Comparing regeneration options requires a technical assessment of whether repairs can preserve safety and utility, followed by a comparison of the economics of rebuilding, building renewal, sale and demolition. Construction prices alone do not determine the owners’ choice where temporary accommodation, business interruption, relocation, tax, borrowing costs and post-return management charges differ. An identical overall project budget does not impose an identical economic burden on an owner who stays and one who leaves for cash, or on a residential owner and a shop owner. MLIT’s comparative manual likewise addresses the selection of an approach by reference to the building’s condition and owners’ intentions. [8, 9]

Expected development gains must not be mistaken for existing legal entitlements. Where the plan relies on selling additional floor space to fund the project, its viability depends on the achievable floor area, sale price, sales period and terms on which a developer will commit to the project. The existence of a mechanism for relaxing floor-area-ratio or height restrictions does not ensure that permission will be granted for a particular property; nor does the law guarantee that the additional space will sell at the assumed price. The maximum scale legally possible, the scale realistically anticipated after discussions with the authorities, and the scale used in the financing model should be presented separately. [11, 18]

Commencement dates require the same discipline. The supplementary provisions of the amending Act contain transitional rules for meetings whose convening procedures began before 1 April 2026. A resolution adopted during 2026 is therefore not necessarily governed by the amended requirements. The extension of management-plan approval to the new-construction stage, and the scheme for displaying approved condominium status, take effect on 1 April 2027. They are not identical to the existing mechanisms for assessing management of an older property or authorising a regeneration project. A purchaser should inspect the certificate and its statutory basis to identify precisely what approval was obtained, by whom and when. [2, 6, 19, 20]

These distinctions also explain the focus on a single building. Within an estate described commercially as one housing complex, co-ownership of land, the ownership form of each building and rights in ancillary facilities may require decisions at both complex and building level. Approval to rebuild one building does not automatically authorise disposal of the complex’s land or facilities. In a mixed-use building, a residential majority may likewise be insufficient to resolve the rights associated with retail occupation. The larger the project, the more important it is to identify the relevant legal unit at the outset and organise investigations, resolutions and project plans accordingly. [1, 8, 9, 10]

2. Valid Meeting Resolutions: Attendance, Quorum and the Bylaws

The central question under the revised voting rules is the denominator, before the number voting in favour is considered. Under Article 39 of the Unit Ownership Act, the default rule, unless the Act or the bylaws provide otherwise, is approval by a majority of the unit owners present and a majority of their voting rights. Article 31, governing the establishment, amendment or repeal of bylaws, instead requires attendance by a majority of the unit owners entitled to vote and representing a majority of all voting rights, followed by approval by at least three-quarters of the owners present and at least three-quarters of their voting rights. Any higher quorum prescribed in the bylaws must also be checked. This special-resolution structure cannot be applied indiscriminately to every ordinary resolution. [1, 2, 5, 6]

Owner headcount and voting rights are separate measures reflecting different interests. One owner with a large proportion of the floor area may hold substantial voting rights without thereby satisfying the headcount requirement. Conversely, many owners of small units may support a proposal without reaching the necessary voting-rights threshold. For a co-owned unit, Article 40 requires one person to be designated to exercise the vote by a majority measured by the value of the co-owners’ shares, not a majority of the co-owners by number. The designation must be verified. For a corporate owner, authority to vote or grant a proxy must be established. Maintaining the register should not be treated as a purely clerical function: the basis of both the owner count and the voting-rights calculation must be capable of reconstruction. [1, 2, 5]

Assume, for example, that 100 owners entitled to vote each hold equal voting rights, that the bylaws do not raise the quorum, and that no separate individual-consent issue arises. If 60 attend to consider a bylaw amendment, the statutory quorum is met. Approval by 45 of those 60 owners, holding three-quarters of the voting rights present, may satisfy the statutory majority requirements. The same 45 votes cannot, however, authorise rebuilding. The ordinary rebuilding threshold is four-fifths of the relevant total, and even the reduced threshold based on statutory objective conditions remains three-quarters of that total. This hypothetical illustrates the calculation; it does not suggest that headcount alone establishes the validity of an actual resolution. [1, 2, 6]

Attendance is not confined to physical presence in the room. Article 39(2) counts owners who exercise voting rights in writing or through a proxy, and their voting rights, in the attendance totals. Corresponding rules address electronic voting carried out by the statutory means. Procedures for written votes and proxies should therefore identify the relevant resolutions, submission deadlines, amendments or withdrawals, proxy authority and duplicate submissions. It is inappropriate to add a person to the attendance denominator without establishing how the vote was exercised, or automatically to treat a blank document as approval of every proposal. [1, 2, 5]

Changes to common areas require a further distinction. For changes significantly affecting form or utility, Article 17(1) generally requires attendance representing a majority of the relevant owners and voting rights, with approval by at least three-quarters of the owners present and their voting rights. The bylaws may raise the quorum and may lower the approval proportion, but any reduced proportion must remain greater than one-half. Article 17(5) substitutes two-thirds for three-quarters for specified changes needed to remove defects that infringe, or threaten to infringe, others’ rights or protected interests, or to improve accessibility as prescribed. The quorum rules still apply: the default approval test is at least two-thirds of the owners present and at least two-thirds of their voting rights. Neither the label ‘major repairs’ nor a high project price determines which rule applies. [1, 2]

The reach of majority management powers must be distinguished from consent required from particular owners. Consent where a common-area alteration specially affects the use of an exclusively owned unit, or where a bylaw amendment specially affects certain owners’ rights, does not disappear simply because majority thresholds have changed. Work inside units presents the same issue. Amended Article 17(3) and Article 18(4) address preservation and related work on exclusively owned units in conjunction with common-area work where the bylaws contain special provisions. They do not give the management association unrestricted authority to remodel every private unit. The necessity and scope of the work, cost allocation and fairness to owners who have already undertaken their own improvements must also be explained. [1, 2, 5]

Article 35 generally requires a convening notice to be dispatched at least one week before the meeting, specifying the matters to be considered and the substance of the proposed resolutions. The bylaws may extend that period, but a pre-existing clause allowing shorter notice cannot justify falling below the statutory period. The two-week period adopted in the Model Management Bylaws must not be confused with the statutory one-week default. Rebuilding and related resolutions are subject to special rules generally requiring at least two months’ advance notice and an explanatory meeting no later than one month before the resolution meeting; the ordinary meeting notice cannot simply be reused. Dispensing with convening formalities by unanimous consent, or relying on another exception, requires a separate examination of its own conditions. [1, 5, 6, 9]

MLIT’s Model Management Bylaws, revised in October 2025, are a model for preparing each condominium’s own bylaws, not a wholesale replacement taking effect without a resolution adopting them. Conversely, the amending Act’s supplementary provisions render existing bylaw provisions that conflict with the new law ineffective after commencement. Confusing those propositions may lead either to continued use of old-law calculations pending a bylaw amendment or to an unwarranted suspension of management on the assumption that all existing provisions are invalid. The association should distinguish provisions that conflict with the legislation, provisions that remain effective and provisions that should be added, and amend them through a lawful procedure. Retaining the proposed changes, dispatch records, vote calculations and minutes together provides the evidential basis for a defensible resolution. [2, 5, 6]

3. Missing Owners, Overseas Residence and Deficient Management: Voting and Property Administration

An owner’s failure to respond does not establish that the owner cannot be located. An owner at a known address who opposes the proposal, one who avoids communications, one in arrears, and a unit whose registered ownership no longer reflects an inheritance present different legal issues. Before invoking the new mechanisms, the association should examine registry entries, owner notifications, postal outcomes and inheritance or corporate changes to the extent lawfully ascertainable. Treating an unwilling owner as untraceable for convenience undermines the foundation of the resolution. [1, 2, 7]

Article 38-2 provides for a judicial decision allowing resolutions by the remaining unit owners where an owner’s identity or whereabouts cannot be established, on an application by another unit owner or the manager. Corresponding provisions apply where an incorporated management association exists. The board cannot simply delete the person from its register. The applicant must identify the relevant person or interest, explain the search undertaken and the need for exclusion, and complete the judicial procedure. Tokyo District Court publishes information on standing and jurisdiction by reference to the building’s location, among other procedural matters. [1, 2, 7]

The Article 86 procedure involves public notice by the court and a period of at least one month for the relevant person to come forward. The exclusion decision takes effect only when it becomes final and binding. The denominator cannot be changed merely because an application has been filed or someone reports that a decision has been obtained. Where the decision was obtained on an application by a remaining unit owner, Article 38-2(3) also requires that applicant to notify the manager without delay or, if there is no manager, post notice in a conspicuous place within the building. There is a mechanism for revocation when the owner and their whereabouts become known. Working back from a proposed regeneration date requires investigation, filing, public notice, finality and the subsequent notification steps to be reconciled with convening notices and meeting dates. The public-notice period alone is not the duration of the entire process. [1, 2, 7]

Exclusion concerns voting in the resolution process. It does not transfer the missing owner’s unit to the management association or distribute that owner’s sale proceeds among the others. Implementation still requires separate consideration of disposal of rights, entitlement to consideration, necessary notices and property-management arrangements. The procedure for establishing the requisite voting majority should not be described as the same application as the procedure for acquiring real estate or obtaining possession. [1, 2, 9, 10]

A different mechanism is the management order for an exclusively owned unit with an unknown owner under Article 46-2 and following provisions. On an interested party’s application, the court may, where it finds the necessary grounds, appoint an administrator for a particular unit or co-ownership share. The administrator’s authority is statutory; acts beyond preservation, or use and improvement that do not change the property’s character, require court permission. A commercial desire to sell the unit does not confer freedom to select any price or terms. The management purpose, property concerned, necessity of disposal and interests of the owner must be assessed separately from those of the prospective acquirer. [1, 2]

Even where the owner is known, Article 46-8 and following provisions may apply to a unit whose deficient management infringes, or threatens to infringe, another person’s rights or legally protected interests. The legislation expressly prevents the administrator from exercising meeting votes and requires the owner’s consent before the court may authorise disposal of the unit. A deficient-management procedure must not become an indirect means of casting a dissenter’s vote or compelling a sale. Measures needed to address leakage or another hazard and the owner’s position on future regeneration belong in their respective legal frameworks. [1, 2: Article 46-9]

For owners living overseas, the Japan-based administrator under Article 6-2 is practically important. The statutory criterion is not nationality but the absence, or prospective absence, of an address, residence or equivalent establishment in Japan. The administrator has specified powers concerning preservation and related acts, receipt of notices, exercise of voting rights and discharge of obligations; appointment must be notified to the manager or incorporated management association. The Act itself does not impose a universal appointment duty on all foreign owners, and any duty under the actual management bylaws must be examined separately. Appointment is also not equivalent to granting a general power to sell the unit. [1, 2, 5]

In practice, bylaws and procedures should allow contacts and authority to be updated upon acquisition, inheritance, relocation, corporate restructuring or a move overseas, rather than waiting for a problem. Identity information, the person authorised to vote for co-owners, service addresses, and the scope and termination of a Japan-based administrator’s authority should be maintained in a coherent record for each unit. That does not justify unrestricted disclosure of personal information to canvass support for regeneration or broad circulation of contact details. Distinguishing information needed for management and statutory procedures from voluntary disclosure to commercial participants helps preserve both procedural effectiveness and owners’ trust.

4. Repair, Rebuilding, Renewal and Sale: Different Routes, Different Requirements

The regeneration route should be selected by reference to the work proposed and the rights each person will lose or acquire, not the label most likely to attract consent. Repairs to exterior walls or pipes, functional improvements to common areas, renewal retaining the structural frame, demolition and rebuilding, and sale of the existing building with its site have different resolution requirements and implementation structures. Work that can be authorised as ordinary management or alteration of common areas should not be forced into an unnecessarily onerous regeneration process. Equally, a project altering rights across all exclusively owned units cannot proceed merely on a repair resolution. [1, 8, 9, 10]

Article 62 generally requires approval for rebuilding by at least four-fifths of the unit owners, excluding those without voting rights, and at least four-fifths of the voting rights. Paragraph 2 reduces each threshold to at least three-quarters where specified objective conditions exist. These concern inadequate earthquake or fire safety, danger from falling exterior walls or similar components, serious sanitary risks arising from deterioration of prescribed pipework, and failure to meet accessibility criteria. The precise tests are those prescribed by Ministry of Justice ordinance and notification. For pipework, there is also a condition limiting the category to facilities for which remedial construction is exceptionally difficult. Age alone, or rising repair costs, does not establish a basis for the lower threshold. [1, 2, 9, 10, 11, 12]

Establishing an objective condition requires technical investigation using appropriate qualifications and methods. Site photographs and a commercial explanation cannot alone change the majority requirement. MLIT’s regeneration and sale manuals distinguish formal certification of a need for demolition or related measures from a determination that the Unit Ownership Act’s objective conditions are met. Formal certification is not invariably a prerequisite to the reduced voting threshold. With or without it, however, the evidence must be connected to the applicable criteria. Because certification can have other legal effects, its necessity and consequences should be examined rather than pursuing it solely to reduce the required level of support. [9, 10, 11, 12]

A rebuilding resolution must specify matters including the outline design of the replacement building, estimated costs, allocation of those costs and allocation of ownership in the new units. What matters in explaining the proposal is not merely a low overall budget, but what each owner will contribute, what space or consideration each will receive, and when each will lose access to a home or business premises. Equal floor areas do not necessarily produce a reasonable allocation where floor level, orientation, use, rental income or the value of exclusive-use rights differ. Explaining the assumptions underlying comparative valuations and the reasons for allocating burdens and rights supports both the fairness required by law and informed agreement in practice. [1, 9]

Building renewal under Article 64-5 is a new statutory mechanism associated with whole-building renovation. Its legal definition is more specific: alteration of the form of common areas to maintain or restore the utility of the building’s principal structural parts, including securing their ordinarily expected utility, accompanied by changes to the form, area or relative positioning of every exclusively owned unit. It is not the same as owners independently refurbishing their interiors or simply replacing equipment. The general resolution threshold is at least four-fifths of the relevant total owner headcount and voting rights; the reduction to three-quarters for statutory objective conditions and related provisions apply with the necessary modifications. Retaining the frame should not be assumed always to cost less. Deterioration discovered through further investigation, construction constraints and maintenance after reoccupation must also be compared. [1, 2, 8, 9]

A combined building-and-site sale under Article 64-6 presupposes site-use rights held by more than one person and provides for the integrated disposal of the building and rights in its site. At least four-fifths is required not only by owner headcount and voting rights, but also by the value of shares in the site-use rights. The reduction for statutory objective conditions applies with the necessary modifications. Counting only owners and votes under the management bylaws is insufficient. The resolution must identify matters including the buyer, anticipated consideration and the method for calculating the money each owner may receive. Allocation of the price and the treatment of encumbrances should not be deferred until later contract negotiations. [1, 2, 10]

Demolition followed by sale of the site under Article 64-7 differs from a sale with the existing building intact because it incorporates prior demolition and its costs. Its majority must likewise be assessed against three criteria. A demolition resolution under Article 64-8, by contrast, generally requires at least four-fifths of the relevant unit owners and voting rights and does not itself authorise a subsequent sale of the land. Each route includes a prescribed reduction for objective conditions, but receipt of sale proceeds after demolition cannot be assumed. The allocation of cost and risk must be established at each stage, including vacant-site management, demolition accidents, items left behind, underground structures and additional work. [1, 2, 8, 10]

Administrative requirements remain separate from majority approval. The relaxation of floor-area-ratio or height restrictions under Article 163-59 of the Condominium Regeneration Act is a permission-based mechanism for rebuilding or renewing condominiums certified as requiring demolition or related measures, taking account of site size and improvement of the urban environment. Certification or an owners’ resolution does not automatically confer a fixed increase in permitted floor space. Matters requiring consultation with the designated administrative authority, local plans and ordinances, building confirmation and construction safety should be analysed separately. Drawings and sales assumptions prepared before permission is obtained are not vested development rights. [11, 18]

Every route needs a clear connection between the initial resolution and later decisions when project conditions change. An increase in construction costs, a replacement buyer or a reduction in allocated floor space cannot safely be implemented solely by amending a framework agreement without examining whether the original resolution encompasses the change. The need for a further decision or administrative authorisation depends on which elements of the resolution, project plan, rights conversion or sale terms are affected. Rather than consigning all future uncertainty to a vague discretion clause, the documents should establish the permissible limits of change and the point at which further consultation is required. [9, 10, 16]

5. Rights After the Resolution: Sale Demands, Tenant Compensation and Mortgages

An owner who opposes a regeneration resolution or does not attend does not lose ownership when the vote is taken. Under Article 63, the person who convened the meeting must, without delay, give written notice to owners who did not vote in favour, requiring them to state whether they will participate on the terms of the resolution. The response period is two months from receipt of that notice. A refusal to participate, or no response within that period, may allow the persons entitled under the Act to demand a sale at market value. The period for exercising that right is two months from expiry of the response period, not a uniform two months from the resolution date. [1, 9]

The identity of the person making the demand matters. The Unit Ownership Act procedure available to those who voted in favour, those who subsequently elected to participate and the statutorily designated buyer differs in legal basis and timing from a sale demand made by the project implementing entity under the Condominium Regeneration Act after public notice of authorisation to establish the association. Under Article 15 of that Act, the interaction between the period of two months from public notice and the limit of one year from the resolution must be checked. Separate procedures also address association members who do not support the rights conversion plan. The project timetable should record, for each statutory route, the respondent, entitled claimant, starting date, evidence of receipt and required funding. [9, 16]

Valuation at market value and obtaining possession are separate tasks. The valuation date, potential use of the site, relationship with the regeneration proposal and value of the existing building and land must be established as valuation assumptions. A dissenter’s rejection of the offered price does not permit self-help through changing locks or disconnecting essential services to force departure. The programme and funding should allow for disputes over the effectiveness of the demand, price, registration and delivery of possession, including necessary judicial proceedings. A statutory sale demand does not confer unlimited coercive authority in place of a process for securing agreement. [1, 9, 10]

For tenants, owner approval must be distinguished from termination of the lease. New Article 64-2 permits a demand to terminate a lease of an exclusively owned unit following a rebuilding resolution. The persons entitled include owners who supported the resolution, those who subsequently elected to participate, a person unanimously designated by those owners, and the owner of the leased unit. The lease ends when six months have elapsed from the date of the demand, not automatically six months after the resolution. The provisions also apply, with the necessary modifications, to building renewal and specified sale and demolition resolutions. The type of resolution and the person entitled to make the demand must therefore be identified. [1, 2, 9, 10]

Compensation is integral to that termination mechanism. The owner of the leased unit must compensate the tenant, including a subtenant, for losses ordinarily arising from termination. If a person other than the owner makes the demand under Article 64-2(1), that person is jointly and severally liable with the owner for the compensation obligation in paragraph 3. Even after six months have elapsed, the tenant may refuse to surrender possession until compensation has been tendered. A project that budgets payments to tenants only as voluntary cooperation incentives and fixes a construction start date while leaving statutory compensation for later negotiation is therefore exposed to substantial risk. [1, 2]

Nor can compensation be presumed to equal a uniform number of months’ rent. The parties must examine the need to relocate, availability of alternative premises, fixtures and equipment, actual use, and the causal relationship with termination, then discuss the categories of loss and supporting calculations. The relevant circumstances differ between a dwelling and an operating shop or office. A settlement should coordinate the amount, payment or tender, relocation, delivery of possession, remaining property, reconciliation of deposits and other sums, and the scope of claims resolved. This special mechanism must not be extended to an ordinary lease termination without a regeneration resolution, nor should an owner’s objection to regeneration be conflated with a tenant’s rights. [1, 2, 9, 10]

Mortgages securing housing loans and other debts do not disappear by majority vote either. For a rights conversion plan, the starting point is consent from the relevant rights holders under Article 57(2) of the Condominium Regeneration Act. Where consent cannot be obtained from a mortgagee or another holder within the limited category of rights covered by Article 57(3), the required documents and the authorisation criteria in Article 65 must establish justified reasons for the absence of consent and appropriate measures to prevent prejudice. That exception’s category does not include building leasehold rights. Consent from a tenant whose lease continues through rights conversion must therefore be considered separately from termination under Article 64-2 of the Unit Ownership Act or another applicable termination provision. It is inaccurate both to attribute an absolute veto to every mortgagee and to assume that establishing the association removes all consent requirements. Registered rights and underlying claims must be reconciled with the statutory criteria, taking account of replacement collateral and the risk that the project may not be completed. [3, 9, 16, 17]

For example, where a secured creditor’s interest extends to compensation payable to an owner leaving the project, remitting the entire amount to the owner may be insufficient; statutory deposit and other procedures must be checked. Even where security transfers to the unit allocated through rights conversion, repayment of existing borrowing, financing of additional contributions and funding during construction remain separate issues. Difficulty obtaining further credit because of the borrower’s age, income or outstanding loan balance does not oblige a financial institution to lend following a rebuilding resolution. Proposed allocations among owners and bank financing conditions should be tested in parallel to avoid discovering a shortfall immediately before execution. [9, 17]

Treating these arrangements merely as causes of delay overstates the economics of regeneration. Acquiring non-participants’ rights, compensating tenants, dealing with security, funding temporary accommodation and maintaining the property during litigation are indispensable costs, even though they are not construction expenses. The plan should identify when the money is needed and how it will be raised, and test whether the project remains viable without unfairly reducing the consideration due to affected persons. Minority protection and project predictability are not necessarily opposing objectives: proper treatment of rights can strengthen both.

6. Executable Transactions: Development Agreements,
Funding and Acquisition Due Diligence

A developer or investor entering a regeneration project must first establish what it will acquire and how it will earn a return. Sequential purchases of existing units, acquisition of floor space through participation in the regeneration project, purchase of the entire building and site, and provision of construction or project-support services have different voting positions, cash requirements, liabilities and exit routes. Accumulating a small number of units should not be assumed to confer control over the whole project. Owner headcount, voting rights, site-share criteria and the counterparty’s authority must be examined concretely. [1, 9, 10, 16]

A framework agreement should distinguish roles during the feasibility stage from binding obligations to complete the ultimate transaction. If a project partner advances investigation or design costs, the agreement should identify who formally commissions the work, who bears the expense if the plan fails, and whether the resulting materials may be transferred to a replacement participant. A lengthy exclusive-negotiation commitment without price parameters, deadlines or termination conditions may deprive owners of alternatives. Equally, a counterparty expected to invest in investigations needs provisions for information, consultation and reasonable cost settlement. The drafting should support stable negotiations without binding the owners to an unapproved project.

Conditions to acquisition or project participation require more than a copy of the resolution. The necessary votes, identification of the rights acquired, administrative authorisations, tenant arrangements, treatment of existing security, financing and construction appointments must form a workable sequence. A seller’s undertaking to obtain consent does not mean it controls a third party’s willingness to consent. Provisions addressing extensions, termination, return of deposits, costs already incurred and units already acquired if conditions fail can reduce the risk of isolated acquisitions proceeding while the overall project remains stalled. [9, 10, 16]

The funding plan must test peak cash requirements during implementation, not merely the balance at completion. If non-participants must be paid or compensated before proceeds from the sale of reserved floor space are received after construction, an overall profitable project can still run out of cash. Interest-rate increases, conditions discovered after demolition, material prices, delayed sales and prolonged discussions with the authorities should be assessed together to determine contingency and bridging finance. Restrictive drawdown conditions in the facility agreement must not be left inconsistent with payment obligations falling due earlier under the construction contract.

Existing repair reserves are not investment funds that owners may withdraw at will. Permitted uses and transfer arrangements must be checked against the actual bylaws, resolutions and project framework, while preserving funds for immediate safety and day-to-day management. MLIT’s long-term repair planning and reserve-fund guidelines assist assessment of future work and contributions, but their benchmarks are neither the actual amount required by every building nor statutory minimum balances. Unless unit construction costs, repair cycles, income, arrears and the actual reserve balance are reconciled, the existence of a plan alone will not disclose a purchaser’s exposure to additional contributions. [5, 14, 15]

These issues also matter to a purchaser of a single unit. Article 8 of the Unit Ownership Act permits the claims specified in Article 7(1) to be enforced against a successor acquiring the particular interest, so unpaid management charges and similar sums may be recoverable from the purchaser. Allocating those debts to the seller in the sale agreement does not automatically defeat the management association’s claim. Completion statements, arrears, special-assessment resolutions, borrowings and scheduled work should be reviewed, with effective provision for repayment by completion, a price holdback or an indemnity. Where regeneration is already being considered, the review should also cover minutes, consents already submitted, framework agreements and the status of proposed resolutions. [1, 5]

A purchaser in a combined building-and-site sale should not rely solely on a general representation that the sale resolution is lawful. The voting denominator, site shares, convening procedures, evidence for the technical conditions, relevant court decisions and treatment of rights all require review. A dispute need not automatically halt the entire transaction, but its potential effects on the resolution, transfer of ownership, possession or financing must be analysed. Acquisition with the existing building retained and acquisition of a cleared site require different provisions on delivery condition, accident liability, remaining property, leases and insurance. [10, 16]

Where overseas investors or foreign corporations participate, Japanese procedures must also be accurately conveyed in English investment materials. Management bylaws, development agreements, judicial orders and administrative authorisations are not interchangeable forms of ‘approval’. Identity and representative authority of the acquiring entity, receipt of service or notices, management in Japan, fund transfers, tax and applicable investment regulation require separate examination; a local representative’s signature is not a substitute for that work. Neither restricting rights solely by reference to foreign nationality nor assuming that an overseas investment agreement can alter Japanese voting requirements or transfers of proprietary rights is a sound approach. [1, 2]

The final investment assessment should consider the rights and liabilities remaining if implementation fails, not only the spread between acquisition cost and completed value. Exit arrangements should address design materials, investigation results, guarantees, temporary relocation costs, terminated construction contracts and maintenance of units already acquired if a developer withdraws. The purpose of legal due diligence is not to lengthen an issue list, but to identify which uncertainties belong in the price, which should become conditions to completion and which justify declining the transaction. Translating regeneration expectations into achievable rights and identifiable burdens is what makes a prudent investment decision possible.

7. Governance and Dispute Prevention:
Conflicts, Records and Continuing Responsibilities

As regeneration planning advances, oversight of routine management and significant transactions becomes increasingly important. Engaging an external specialist or management company as manager can be beneficial where few owners are willing to serve. But where the party placing orders is closely connected with the supplier of works or services, price and counterparty selection need independent scrutiny. Appointing an external manager does not remove the need for arrangements through which owners receive decision-useful information, conduct audits and replace that manager where necessary. [13]

Article 77-2 of the amended Act on Advancement of Proper Condominium Management, effective from April 2026, introduces advance-explanation requirements for a condominium management business acting as manager or in a corresponding capacity for an association that has entrusted management services to it, in relation to transactions with itself or closely related persons specified by ministerial ordinance. For transactions within scope, the general rule requires an explanatory meeting in advance and an explanation of material facts. Article 89-3 of the Enforcement Regulations also requires written materials stating the meeting’s date and place and the prescribed material facts to be delivered to all relevant unit owners at least one week before the explanatory meeting. Posting the date and place is separately regulated: a resolution dispensing with posting does not itself dispense with delivery of the written materials. Entering the management-services agreement or the manager-appointment agreement is excluded from Article 77-2 itself, and the separate material-matters explanation rules must be checked. The provision does not govern every transaction involving every external professional. [2, 13]

Giving an advance explanation and possessing authority to approve the transaction are separate questions. MLIT’s guidelines revised in April 2026 describe a two-stage approach: first identify the statutory explanation requirement, then examine conflicts and approval under the bylaws. Where the manager’s interests substantively conflict with those of the association, the analysis should not end merely because the counterparty falls outside the provision’s listed relationships. The actual bylaws and Civil Code rules on agency, among other applicable provisions, determine who must scrutinise the terms and who may decide. [13]

If the manager proposes to appoint a contractor in the same corporate group and Article 77-2 applies, Article 89-4 of the Enforcement Regulations makes specified matters part of the required explanation. These include the relationship with the counterparty, the nature and amount of the transaction with its breakdown and calculation basis, the reasons for the transaction, and other suppliers’ quotations or the reasons why no such quotations were obtained. A general recommendation to obtain comparative quotations is distinct from the statutory duty to explain the quotations actually obtained or why none were sought. Several quotations do not provide a meaningful price comparison if the work or warranties differ. Independent scrutiny of specifications and economic relationships, and a recorded assessment of necessity, quality, performance capacity and ongoing maintenance rather than simply the lowest price, remain advisable. Additional review practices should be designed separately from the acts required by legislation and the actual bylaws. [2, 13, 14, 15]

Emergency dispensation is not a matter of unlimited managerial discretion. Article 89-5 of the Enforcement Regulations specifies damage to common areas caused by disaster or another unavoidable event that is considered likely to disrupt residents’ daily lives, together with a meeting resolution to that effect. The guidelines explain the need to adopt in advance a resolution permitting the explanatory meeting to be dispensed with for specified emergency transactions. Mere time pressure or reporting an appointment afterwards does not itself satisfy those conditions. The exception must also be distinguished from minimum emergency measures authorised by an existing management-services agreement or the authority to preserve property. Permission to dispense with the explanatory meeting does not necessarily remove contractual authority limits or approval requirements under the actual bylaws. Emergency authority, expenditure, supplier selection, reporting and subsequent review should therefore be organised separately. [2, 13]

Meeting minutes alone are not an adequate evidential record. Materials distributed with the notice, changes to proposals, written votes and proxies, technical-assessment assumptions, versions of cost estimates, answers to individual questions, finality of court decisions, receipt of notices and payments should be traceable along one chronology. If a resolution is challenged, the fact that many owners ultimately supported it cannot by itself cure procedural defects. Recording objections is important not to intimidate dissenters but to show which disadvantages were considered and why particular concerns were accepted or rejected.

Claims concerning building defects must not be lost in the regeneration process. Amended Article 26 addresses the manager’s representative and litigation position in claiming and receiving insurance proceeds, damages and restitution of unjust enrichment relating to common areas and other relevant property, including certain rights of former owners. It does not assign every underlying claim to the association. Contrary indications by former owners, provisions in the bylaws or a resolution, notices and other requirements must be considered. The existence of the claim, applicable time limits, policy conditions, settlement authority and use of recoveries require separate review, and historic evidence should not disappear on sale or departure. [1, 2, 5]

Management continues after regeneration. Additional equipment changes maintenance costs, while changes in unit numbers or the mix of retail premises require reconsideration of voting rights, cost sharing and use rules. Understating future reserve contributions to support an attractive initial sales price merely passes a funding deficit to the next generation. Acceptance of completed works, handover of drawings and equipment information, defect response, management bylaws and the long-term repair plan should be connected as conditions to project completion. Completion of regeneration is not the end of management responsibility. [5, 9, 14, 15]

The amended Unit Ownership Act expands the means of choosing a building’s future while reconciling rights; it does not confer freedom to proceed in disregard of those rights. Management associations need structures capable of explaining the basis and burdens of decisions. Developers need the capacity to carry the project from resolution through contractual performance. Lenders and investors need to recognise rights that remain unresolved. Whether the choice is preservation, rebuilding or sale, it becomes meaningful only when its legal, technical and financial conditions have been tested. Legal work on condominium regeneration turns that choice into a transaction for which the participants can remain accountable after execution.

Frequently Asked Questions: Unit Ownership Reform and Condominium Regeneration

Q1. When did the amended Unit Ownership Act take effect?

The principal amendments took effect on 1 April 2026, subject to transitional rules for meetings whose convening procedures began before commencement. Provisions including management-plan approval applications by developers at the new-construction stage take effect on 1 April 2027. The entire legislative package should not be treated as becoming available on one date. [2, 4, 6, 19, 20]

Q2. Can an association continue using the old meeting rules until it amends its bylaws?

Not as a general rule. Existing provisions that conflict with the new law lose effect after commencement, while non-conflicting provisions still need to be examined. The Model Management Bylaws do not automatically apply in their entirety either. The start of the convening procedure, the proposed resolution and the actual bylaws must be checked together. [2, 5, 6]

Q3. Can three-quarters of those attending also approve rebuilding?

No. Attendance-based thresholds for bylaw amendments and similar matters differ from the rebuilding threshold. Rebuilding generally requires at least four-fifths of all relevant unit owners and of all voting rights, taking account of persons without voting rights. Even where statutory objective conditions permit a reduction, at least three-quarters of the relevant total is required under both criteria. [1, 2, 6, 9]

Q4. Do owners voting in writing or by proxy count as attending?

Under Article 39(2), owners exercising voting rights in writing or by proxy, and their voting rights, count towards attendance and the voting rights present. Corresponding provisions address lawful electronic voting. The resolutions covered, proxy authority, submission procedures and duplicate submissions must be checked. [1, 2, 5]

Q5. May an association exclude a non-responsive owner from the denominator itself?

No. Exclusion of an unidentified or untraceable owner requires judicial proceedings and a final and binding decision under Articles 38-2 and 86. Silence, opposition or arrears alone does not establish that the owner cannot be located. Exclusion does not automatically extinguish ownership or entitlement to consideration. [1, 2, 7]

Q6. Must every overseas owner appoint a Japan-based administrator?

Article 6-2 itself provides an optional appointment mechanism, not a universal duty based on nationality. The statutory condition concerning the absence of an address or equivalent establishment in Japan must be distinguished from obligations in the actual bylaws. Notification of appointment, statutory powers including voting, and any separate disposal authority also require attention. [1, 2, 5]

Q7. Does every old building qualify for the three-quarters rebuilding threshold?

No. The building must satisfy a statutory objective condition concerning earthquake safety, fire safety, exterior components, prescribed pipework or accessibility, together with the criteria in the relevant notifications and other rules. Age or project profitability alone does not decide the matter. Technical findings must be matched to the legal requirements. [1, 2, 9, 10, 11, 12]

Q8. Can whole-building renovation and major repairs use the same resolution?

The name of the work is not decisive. Building renewal under Article 64-5 involves altering the form of common areas to maintain or restore the utility of the principal structural parts, including securing their ordinarily expected utility, and accompanying changes to the form, area or relative positioning of every exclusively owned unit. Repairs amounting to ordinary management or alteration must be distinguished from statutory building renewal. [1, 2, 8, 9]

Q9. Are owner headcount and voting rights the only measures for a building-and-site sale?

No. A combined building-and-site sale under Article 64-6, and demolition followed by site sale under Article 64-7, also use the value of shares in site-use rights as a majority criterion. The form of those rights, treatment of persons without voting rights, any reduction for objective conditions and the method for allocating monetary proceeds must be checked. [1, 2, 10]

Q10. Must tenants leave unconditionally six months after the rebuilding resolution?

No. The six-month period in Article 64-2 runs from the termination demand made by an entitled person. Compensation for losses ordinarily arising from termination is required, and the tenant may refuse to surrender possession even after termination until compensation is tendered. If the person making the demand under paragraph 1 is not the owner of the leased unit, that person is jointly and severally liable with the owner for the compensation obligation under paragraph 3. [1, 2, 9]

Q11. Does a valid resolution eliminate mortgagee-consent issues or repayment obligations?

No. Consent to the rights conversion plan must be addressed. Where a mortgagee or another holder within the statutory category does not consent, justified reasons and appropriate measures preventing prejudice must be established within that exception’s scope. The exception must not simply be applied to a tenant’s consent. Collateral value and deposit of compensation also require review. The resolution neither obliges a lender to advance funds nor releases existing debt. [3, 9, 16, 17]

Q12. What should a purchaser check when regeneration is being considered?

In addition to title records and bylaws, review convening notices, resolutions and vote counts, technical assessments, developer agreements, special contributions, repair reserves, arrears, leases and financing conditions. A purchaser may face claims for a seller’s unpaid management charges. The contract should therefore provide for effective completion adjustments and payment protection, not merely state that the seller bears the debt. [1, 5, 9, 10]

About the Legal Update Series by Managing Partner Kenshiro Michishita

Through the Legal Update series by Managing Partner Kenshiro Michishita, SAKURA Law Office publishes analysis of corporate law, cross-border transactions, M&A, real estate, finance and disputes. This edition examines condominium management and regeneration not merely as collective decision-making among owners, but as legal issues connected with corporate acquisitions, development, financing and preservation of rights. It distinguishes legislation, model bylaws, administrative materials and practical recommendations, enabling readers to trace the analysis to the underlying sources.

Firm and author information: SAKURA Law Office — Official Website
Managing Partner Kenshiro Michishita — Profile

How SAKURA Law Office Can Assist

Condominium management and regeneration matters require purpose-specific assessment of bylaws and meeting procedures, identification of rights holders, responses to unknown ownership or deficient management, rebuilding and sale agreements, negotiations with tenants and lenders, acquisition due diligence, conflicts involving commercial participants, litigation and protective relief. SAKURA Law Office accepts instructions concerning these legal relationships, contracts, negotiations and disputes.

Building safety, technical assessment of objective conditions, valuation, design, registration, taxation, credit underwriting and administrative permissions require, as appropriate, verification by professionals with the relevant qualifications and expertise and by the competent bodies. Legal advisers do not guarantee passage of resolutions, permissions, financing or investment returns. The necessary review and allocation of responsibilities should be settled after identifying the client’s position and assessing conflicts of interest.

Contact

SAKURA Law Office
Ark Hills South Tower 4F, 1-4-5 Roppongi,
Minato-ku, Tokyo 106-0032, Japan
Managing Partner Kenshiro Michishita

Contact SAKURA Law Office

Principal References

The reference numbers in the text and FAQs, and the source titles below, link to the corresponding publications. Unless otherwise stated, article references are to the amended Unit Ownership Act. The amending Act sets out amendments rather than a consolidated text and should be read with the legislation and related materials. Manuals, model bylaws, guidelines and technical advice do not replace the actual bylaws, contracts or judicial decisions. The analytical cut-off is 3 November 2026; the pre-publication review was conducted on 14 November 2026. Continuously updated procedural guidance is cited in the version available at review and should be checked again when filing. English titles are descriptive translations of the Japanese sources, not assertions that official English texts of the amended instruments are available.

1. e-Gov Laws — Act on Building Unit Ownership (Act No. 69 of 1962)

Reference to the legislation reflecting the amendments effective on 1 April 2026. Relevant provisions include Articles 6-2, 8, 17, 26, 31, 35, 38-2, 39–40, 46-2 and following, 62 and following, and 86. The enacted amending legislation at Reference 2 and related official materials also identify the amended provisions.

2. House of Representatives — Act Partially Amending the Act on Building Unit Ownership and Other Acts to Facilitate the Management and Regeneration of Ageing Condominiums and Related Matters (Act No. 47 of 2025)

Enacted legislation promulgated on 30 May 2025, including amendments concerning unit ownership, regeneration projects and management businesses, and supplementary provisions. This is the promulgated amending Act, not a bill.

3. e-Gov Laws — Act on Facilitation of Condominium Regeneration, etc. (Act No. 78 of 2002)

Reference to the Act as amended and renamed with effect from 1 April 2026. Covers associations, statutory demands for sale, rights conversion, consent and authorisations. Read with the enacted legislation at Reference 2 and the official manuals at References 9, 10 and 16.

4. MLIT — Legislation Relating to Condominiums

Official portal for the amending legislation, Cabinet Orders, ministerial ordinances, commencement dates and transitional provisions. Attachments originating at bill stage, provisions already in force and provisions commencing in 2027 must be distinguished.

5. MLIT — Model Condominium Management Bylaws (Single-Building Type) and Commentary

Revised on 17 October 2025. Model provisions concerning claims against successors for management charges and related amounts, convening procedures, meetings, works and Japan-based administrators. The model does not automatically replace each condominium’s actual bylaws.

6. MLIT — Procedural Considerations When Amending Management Bylaws in Light of the 2025 Revised Model Condominium Management Bylaws

Official explanation accompanying the 2025 changes. Distinguishes convening procedures before and after 1 April 2026, conflicting existing provisions, quorum, approval thresholds and notice periods.

7. Tokyo District Court, Civil Division 22 — Judicial Exclusion of Unit Owners Whose Identity or Whereabouts Is Unknown and Related Procedures

Corrected version linked from the official guidance of Tokyo District Court, Civil Division 22. Addresses standing, jurisdiction by reference to the property’s location and application documents. It is procedural guidance, not a judgment; the statutory conditions should be checked against Articles 38-2 and 86 and related provisions of the Unit Ownership Act. Check the competent court’s current instructions when filing.

8. MLIT — Manual for Comparing Condominium Regeneration and Related Options

March 2026 edition. Addresses building condition, owners’ intentions, repairs and comparison of regeneration routes. It does not establish or guarantee project costs or future value for a particular property.

9. MLIT — Practical Manual for Condominium Regeneration

March 2026 edition. Covers feasibility review, rebuilding and building renewal, resolutions, implementation and adjustment of rights. Particular reference is made to Chapter 5 on non-participants, statutory demands for sale, mortgagees and tenants.

10. MLIT — Practical Manual for Sales of Condominiums and Related Property

March 2026 edition. Covers planning, resolutions, sale projects and adjustment of rights for combined building-and-site sales and related transactions. Addresses the three voting criteria, objective conditions and their relationship with certification of the need for demolition or related measures.

11. MLIT — Practical Manual on Certification of the Need for Demolition or Related Measures

Revised in March 2026. Explains the scope, criteria, investigations and procedures for certification. Chapter 8(6), printed pages 129–134, reproduces Ministry of Justice Notification No. 21 of 2026. Formal certification must be distinguished from assessment of objective conditions governing majority thresholds.

12. Ministry of Justice / e-Gov Public Comment — Results of Public Consultation on the Draft Notification Establishing the Criteria to Be Prescribed by the Minister of Justice in Consultation with the Minister of Land, Infrastructure, Transport and Tourism under Each Item of Article 62(2) of the Unit Ownership Act, and the Matters to Be Prescribed by the Minister of Justice under Article 8 of Its Enforcement Regulations

Consultation results published and notification promulgated on 25 March 2026. Official record establishing the promulgation timing and consultation outcome for Ministry of Justice Notification No. 21 of 2026. The adopted notification was checked in the related-legislation section of Reference 11 and distinguished from the draft.

13. MLIT — Guidelines on External-Manager and Related Arrangements in Condominiums

Revised in April 2026. Covers management companies acting as managers, conflicts, contracts, auditing and emergencies. See printed pages 93–99 on conflicts, and the legislation reproduced on printed pages 125–128, including Article 77-2 of the Proper Management Act and Articles 89-2 to 89-5 of its Enforcement Regulations. Distinguish statutory duties, model clauses requiring adoption and recommended practice.

14. MLIT — Standard Format for Long-Term Repair Plans, Guidelines for Preparing Long-Term Repair Plans and Commentary

The posted edition revised in June 2024. Consulted for building investigations, work items, costs, income and expenditure, and plan review. References to former legislation or bylaws must be distinguished from current law and References 5 and 6.

15. MLIT — Guidelines on Condominium Repair Reserve Funds

The posted edition revised in June 2024. Provides principles for repair reserves and material for funding assessments. Indicative amounts are not statutory minimum reserves for an individual condominium.

16. MLIT — Manual on Authorisations and Related Procedures for Condominium Regeneration Projects

Issued in March 2026. Covers authorisation of association establishment, project plans, rights conversion plans and related procedures. Resolutions under the Unit Ownership Act are distinguished from authorisations under the project legislation.

17. MLIT — Application of Articles 57(3) and 65 of the Act on Facilitation of Condominium Rebuilding (Technical Advice)

31 March 2008, Kokuju-Ma No. 43. An earlier notice also listed on the official regeneration materials page in 2026. Addresses measures to prevent prejudice to mortgagees and other rights holders. Its former statutory title and terminology must be read against current legislation.

18. MLIT — Application of Article 163-59 of the Act on Facilitation of Condominium Regeneration, etc. (Technical Advice)

26 December 2025, Kokuju-Gai No. 125. Notice concerning relaxation of floor-area-ratio and height restrictions in preparation for commencement in April 2026. Permission from the designated administrative authority and satisfaction of individual conditions are required; the notice does not confer automatic additional floor space.

19. MLIT — Cabinet Decision on Orders Specifying Partial Commencement of the Condominium Management and Regeneration Amendments

Published on 15 May 2026. Confirms commencement on 1 April 2027 of provisions concerning developer applications for management-plan approval at the new-construction stage and display of approved condominium status. Distinguished from the framework commencing in April 2026.

20. MLIT — Cabinet Order Specifying the Commencement Date of Certain Provisions of the Act Partially Amending the Act on Building Unit Ownership and Other Acts to Facilitate the Management and Regeneration of Ageing Condominiums and Related Matters (Cabinet Order No. 167)

The text listed in Reference 4 as promulgated on 20 May 2026. Specifies 1 April 2027 as the commencement date for the provisions identified in Article 1, item (iii) of the amending Act’s supplementary provisions. Checked separately from the Cabinet-decision announcement in Reference 19.

Disclaimer

This Update provides general legal information based on publicly available primary materials reviewed as of 3 November 2026. It is not a legal opinion, technical assessment, valuation, tax opinion or investment recommendation concerning a particular building, management association, resolution, rights holder, regeneration project or real estate transaction. Its principal focus is a single building under unit ownership; it does not comprehensively address housing complexes, disaster-damaged buildings, leasehold-site structures or other special arrangements.

Resolution requirements, the effectiveness of bylaws, convening procedures, management orders, statutory demands for sale, termination of leases, compensation, rights conversion, security and project authorisations depend on the actual rights, bylaws, resolution, applicable date and individual circumstances. Provisions already in force must be distinguished from future provisions; legislation from administrative materials; model bylaws from the bylaws actually adopted; and those sources from this Update’s practical recommendations. Court procedural guidance and administrative manuals are not presented as binding judicial precedents under the new regime.

Legislation, notifications, administrative practice and publication locations may change. Before implementation, the latest authoritative legislation and notifications, actual management bylaws, registrations, agreements, technical records and competent authorities’ instructions should be checked with the necessary professionals. This analysis alone cannot guarantee the validity of a resolution, recovery of possession, permissions, financing or any level of return.