SAKURA Law Office | Legal Update No. 54 by Managing Partner Kenshiro Michishita
Densai, the Toriteki Act, payment terms and the recovery of trade debts (2026 edition)
Law stated as at 4 November 2026 | Revised 14 November 2026
SAKURA Law Office | Managing Partner Kenshiro Michishita
In November 2026, the accounts department of Company A, a manufacturer of industrial pumps, has a note to collect and a supplier to pay. In its safe is a promissory note issued in September by its customer, Company C, and payable on 27 November. Company B, which machines metal components to A’s drawings, must be paid on time for new orders. A’s sales team has heard that C intends to pay for future deliveries using densai, a form of electronically recorded monetary claim. It proposes offering B the same terms. Even if both counterparties agree, collecting the note already in the safe and choosing a lawful means of paying for the next order are distinct questions.
The Japanese Bankers Association has set 31 March 2027 as the final clearing date for paper bills of exchange, promissory notes and cheques at its Electronic Clearing House, subject to the limited exception for instruments already accepted for collection discussed below. Many of the financial institutions that announced their own deadlines had already set 30 September 2026 as the last day on which their customers could issue these instruments. The national timetable alone says little about what a particular instrument in hand is worth. The practical question is when its holder can collect the money. That depends on the bank at which the instrument is payable from the customer’s current account, the date of issue, who now holds the original, the available routes for collection and the deadlines the banks set for using them. [1] [2]
According to the Bank of Japan’s September payment and settlement statistics, released on 30 October, the Electronic Clearing House processed around 29,000 instruments per business day on average, down 64.9% year on year. Yet a single outstanding note matters to A if it is relying on the proceeds to pay B. Where a manufacturing order falls under the Act on Preventing Delay in Payment to Small and Medium-Sized Entrusted Business Operators in Relation to Manufacturing Consignment (the Toriteki Act), a customer makes a late payment if it hands over a densai claim that its supplier must discount to receive the full amount in cash on the agreed payment date. In September, the Japan Fair Trade Commission (JFTC) issued a recommendation against a business for late payment through the use of electronically recorded monetary claims on just such terms. [3] [4] [5]
A, B and C are fictional Japanese companies. Their transactions illustrate how to collect an outstanding note, arrange payment for a new order and verify receipt of the funds. Whether a company can retain the invoice cut-off dates and payment terms it has used for years with the same counterparty depends on the bank’s terms, the statutory deadlines and the contract between the parties. In preparing terms for orders in the coming financial year, companies must also consider how the Payment Notification under the Antimonopoly Act, effective from 1 April 2027, differs from the Toriteki Act already in force. [4] [6] [7]
Executive summary
A company with outstanding notes receivable should establish where the originals are and who holds the rights before requesting a switch to bank transfer. If a note has already been discounted with a bank or transferred by endorsement to a supplier, an agreement to change the payment method between the maker and the original payee alone may leave the maker facing two demands in respect of the same transaction. Before maturity, the parties should decide whether to proceed with collection or agree a bank transfer with the lawful holder against surrender of the instrument. [1] [2] [8]
For the company placing an order, a different decision arises. For a transaction within the Toriteki Act, it must generally specify a payment date that allows as short an interval as possible from receipt of the goods, subject to a maximum of 60 days. If payment is agreed for 30 days after receipt, it falls due on that date. Where payment is to be made through densai, the date on which the claim is recorded is only part of the enquiry. The supplier must be able to receive the entire amount in cash on the agreed date. If A expects its customer to pay later, it must decide how to fund the shortfall itself. [4] [5] [7]
A switch to bank transfer brings its own risk. A payment instruction may arrive by email under a familiar company name, the change of account may be entered in the supplier records and the bank may carry out the transfer, yet the debt to the genuine supplier may still be outstanding. Completing the change in payment arrangements requires a process that connects the terms of the contract, verification of the account holder’s identity and reconciliation of the bank’s transaction record to the invoice. [9] [10] [11]
Chapter 1 The note still outstanding after the September deadline
The notes receivable register at A shows a maturity date of 27 November. Before entering the same amount against that date in the cash forecast, the accounts team should take C’s note out of the safe, identify the designated place of payment and establish which bank will take it for collection. A stamp acknowledging receipt by the collecting bank does not establish that payment has been made from C’s current account. Until A knows how this particular note will be collected, it cannot count on the proceeds to pay B for machining the components. [1] [2] [12]
At the Electronic Clearing House operated by the Japanese Bankers Association, the financial institution instructed by the payee to collect a paper instrument creates an image of it. The financial institutions exchange the image data to effect settlement. The word ‘electronic’ describes the means of interbank clearing. Scanning C’s note into A’s records does not convert it into a densai claim. The Association has set 31 March 2027 as the general cut-off for clearing bills, notes and cheques. Article 13(2) of the Electronic Clearing House Rules nevertheless allows an instrument to be cleared by 29 June 2029 if a participating bank accepted the instruction to collect it through clearing by 30 April 2026. C’s note, issued in September, does not qualify for that limited exception. The separate date of 29 June 2029 marks the end of all clearing at the institution, including this exception and the remaining arrangements for instruments such as fixed-denomination postal money orders and dividend warrants. Existing instruments nevertheless retain whatever legal effect they otherwise have on 1 April 2027. Interbank settlement of an instrument that can no longer use the clearing house will require bilateral arrangements, for example by post, and each financial institution will decide whether to offer them. [1] [2]
Individual financial institutions have set earlier deadlines for issue. According to the Japanese Bankers Association’s list as at 30 October 2026, many of the institutions that had announced a deadline chose 30 September 2026. As a rule, those institutions will not make payment from a current account against a bill, note or cheque issued on or after 1 October. A’s note was issued in September. Instructing a bank to collect it in November does not itself breach the issue deadline. Timely issue, however, gives A no assurance that it can pay the note into an account at any bank branch. From the accounts department’s perspective, both operations may look like taking the note to the bank. A should establish separately the issue conditions of the bank designated as the place of payment and the terms on which its own bank will accept the note for collection. [2] [12]
MUFG Bank’s guidance as at 1 October illustrates the distinction. On 31 March 2026, it stopped accepting for deposit bills, notes and cheques payable at other banks. Its guidance updated in October confirms that it can still accept such instruments for collection if all the prescribed conditions are met. For a promissory note, the maturity date must be no later than 31 March 2027. The note must be accepted for collection at least four business days before maturity, or at least six business days before maturity at certain branches. The date of issue must appear on the note, and the customer must check the issue deadline, if any, set by the bank designated as the place of payment. Some banks have set no deadline. MUFG also makes clear that its acceptance of an instrument for collection does not guarantee settlement by the paying bank. If A banks with MUFG, lodging C’s note in early November for collection at maturity leaves it an option that would no longer be available if it waited until 27 November to visit the branch. [12]
If MUFG is itself the bank designated as the place of payment for a note or the drawee bank for a cheque, its own final issue date was 30 September. Instruments issued after that date will not be paid from a current account. The bank’s guidance addresses post-dated cheques and similar instruments bearing a date in October or later. MUFG will pay where it is clear that the instrument was in fact issued by 30 September, for example because it had already been lodged with the bank by that date. This is a particular bank’s policy. A payee cannot bring an instrument received today within the deadline by altering the date on its face. Keeping the date shown on the instrument, the circumstances of its receipt and the collection receipt separately identifiable allows the parties to establish which date is in issue. [12]
A company that uses several banks cannot assume that an exception made last month will be available at another branch or for an instrument maturing next month. A should include proceeds in its cash forecast only once it has confirmed which institution will accept the note for collection and by when it must be lodged. If those conditions cannot be met, it must arrange other funds for its payment to B while discussing settlement with C. A further question arises if the parties agree to substitute a bank transfer for a note that has yet to be lodged for collection. Who will return the instrument already delivered to A, when, and in exchange for what? [1] [12]
Chapter 2 Surrender of the note and discharge of the underlying debt
The promissory note in A’s possession is C’s promise to pay a specified sum at maturity. If the note was validly issued, C’s obligation as maker to pay the amount of the note is distinct from its obligation as buyer to pay the price of the pumps. Before posting the transaction, A should check whether the document in its safe is the original or a copy. It should match the maker, payee, any endorsements, maturity date and place of payment to the invoice number in the sales ledger. A claim against C as maker of a note delivered directly to A rests on a different footing from a claim against C as endorser of a note made by another company. [13]
Under Articles 38(1) and 77 of the Bills and Notes Act, a promissory note payable on a fixed date must be presented for payment on the day it falls due or on one of the next two business days. In this example, 27 November 2026 is a Friday. On the ordinary banking calendar, the three dates are 27 November, 30 November and 1 December. Presentation at a clearing house has the effect of presentment for payment. A telephone enquiry to A’s bank or the posting of the note from A’s office does not of itself constitute presentment within the statutory period. A should lodge the note in time for collection and, if payment is refused, obtain a record of the time and place of presentment and the reason for return. A bank’s refusal to accept a collection instruction is a different event from a refusal to pay a note that has actually been presented at the place of payment. [2] [12] [13]
Recourse against an endorser requires the holder to take the prescribed steps to preserve that right, including, as a rule, establishing non-payment by a formal protest. A ‘without protest’ clause dispenses with the protest but leaves the duties of timely presentment and notice intact. The holder’s claim against an endorser becomes time-barred one year from the date of a protest drawn up in time or, where the note carries a ‘without expenses’ clause, one year from maturity. C, as maker of its own note, is the principal debtor. Expiry of the presentment period alone does not deprive A of its claim against C on the note. The limitation period for that claim runs for three years from maturity. Waiting to instruct a collecting bank may nevertheless cost A its recourse against an endorser or its ability to turn the note into cash when expected, well before those three years have elapsed. [13]
A cheque carries no future maturity date for which the holder has to wait. A cheque drawn and payable in Japan is payable at sight and must be presented within ten days, excluding the date stated as the date of issue. Holidays within the period count towards the ten days. If the last day is a statutory holiday, the period extends to the next business day. Even a post-dated cheque presented before its stated date is, by law, payable on the day of presentment. Timely presentment and proof of refusal by one of the statutory means are important to preserve recourse against the drawer and other liable parties. The holder’s right of recourse becomes time-barred six months after the presentment period expires. Article 32(2) of the Checks Act permits the drawee bank to pay after that period if the payment mandate has not been revoked. The possibility of such payment does not preserve rights for a holder that has missed the deadline. [14]
Suppose C offers to pay by bank transfer against return of the note before it has been presented. The parties should first establish what they agreed when A received the instrument. If the note was delivered as a means of paying the price, its delivery alone did not discharge the debt for the pumps. That debt and C’s liability on the note coexist. If A instead agreed to accept delivery of the note itself in satisfaction of the price, delivery discharged the original debt. The National Tax Agency draws this distinction in its Basic Circular on the National Tax Collection Act when addressing which assets may be attached. It cites a judgment of Japan’s pre-war highest court to the effect that, in the absence of a specific expression of intent to accept substitute performance, the instrument is presumed to have been issued as a means of payment. Reclassifying a trade receivable as a note receivable in the accounts does not settle what the parties agreed. The relevant evidence includes the order acknowledgement, the wording of the receipt and the correspondence at the time of delivery. If the price remains due, A must also monitor the limitation period for that claim independently of the three years from maturity of the note. Under Article 166(1) of the Civil Code, the applicable period is the earlier to expire of five years from when the creditor knew it could enforce its right and ten years from when the right became exercisable. Any postponement of expiry or renewal of the period must also be assessed for that claim. [9] [13] [15]
Two rights of action do not entitle a creditor to recover the same price twice. If A has already discounted the note with a bank and transferred it to the bank by endorsement, the note may remain in circulation even after A and C record between themselves that the account has been settled by bank transfer. In its judgment of 24 August 1965, the Supreme Court considered notes issued to secure payment of a debt under an agreement to treat an existing debt as a loan for consumption. To protect the debtor against paying twice, the Court upheld an order requiring payment against surrender of the notes. It distinguished that protection from the defence of simultaneous performance of reciprocal obligations under a bilateral contract within Article 533 of the Civil Code. Where the underlying debt had fallen due, the debtor did not escape liability for delay merely because the notes had yet to be returned. C therefore cannot assume that it may postpone payment indefinitely while the arrangements for surrender remain open. [8] [9] [13] [15]
If A still holds the original, the parties should identify the invoice and note number, agree the amount to be transferred, establish how receipt of the funds will be confirmed and settle when and to whom the original will be returned. Both companies should record the settlement in their books. If the original is already with a bank, A should establish whether the bank holds it under a collection mandate or took it by transfer on discounting. In the first case, it should check whether collection can still be stopped. In the second, it must establish on what terms the current holder will return the note. A copy bearing A’s receipt stamp says nothing about the whereabouts of the original. Replacing an outstanding note with a bank transfer requires arrangements that get the price to the person entitled to receive it, once, without leaving the same amount open to collection on the note. [8] [13] [15]
Chapter 3 When must A pay for the components, and how much must B receive?
A supplies its drawings to B and commissions B to manufacture and machine metal components for the industrial pumps A sells. Article 2(1) of the Toriteki Act treats an order for another business to manufacture components for goods the ordering business sells as a manufacturing consignment. If A has stated capital of ¥200 million and B has stated capital of ¥10 million, they also satisfy the size criteria in Article 2(8)(ii) and (9)(ii). Where the capital test is not met, a manufacturing consignment may still be covered if the business placing the order regularly employs more than 300 workers and the business carrying it out regularly employs 300 or fewer. If C simply selects and buys one of A’s standard pumps from a catalogue, there is no reason to treat that sale as part of the manufacturing consignment from A to B. [16] [17]
The date of each individual manufacturing order determines whether it falls within the prohibition on payment by bill of exchange or promissory note that took effect on 1 January 2026. A framework agreement signed in 2025 may specify payment by promissory note. If A places a fresh order in 2026, specifying the components and the quantity to be machined, the amended Act applies to that order. For work already commissioned in 2025, the earlier rules on payment methods and related matters continue to apply even if payment falls due in 2026. Two invoices entered in the accounts on the same day may therefore be governed by different rules. Linking each purchase order to its framework agreement, and each invoice line to its individual order number, allows A to establish later which order first required a change in payment method. [16] [17] [18]
Under Article 3, the period for setting the payment date runs from the day A receives the components. The date on which A completes its quality inspection, the date its accounts department receives the invoice and the date C pays for the pumps have no bearing on when that period begins. A must set the payment date as early as possible within 60 days of receipt. Immediately after placing the order, it must give B the price, due date, payment method and other required particulars in the manner prescribed by Article 4. If no due date is set, payment is deemed due on the day of receipt. If the date set falls outside the statutory limit, payment is deemed due on the sixtieth day, counting the day of receipt as day one. Suppose A receives the components on 16 November and has agreed to pay on 15 December. If its accounts department schedules payment for 25 December, the fact that this is still within 60 days of receipt does not excuse the failure to pay on 15 December. [4] [16] [17]
For an order payable by densai, A must also specify the amount of the electronically recorded monetary claim, or the proportion of the price it represents, the first day on which B can obtain payment and the maturity date of the densai. A copy of the purchase order will not show when A subsequently received the components or how it actually paid. Article 7 and the JFTC Rules on the Preparation and Preservation of Records require A to document the course of the transaction on paper or electronically and to retain the records for two years from the date on which all required particulars have been entered. Including the order number in the settlement record allows A to compare what it promised when placing the order with what it actually paid. [4] [16] [19]
In this example, if A delivers a bill or note on 15 December in payment of the price, that constitutes late payment under Article 5(1)(ii). The result is the same even if the instrument matures shortly afterwards or B would prefer to be paid as before. A can use densai in appropriate circumstances. It cannot have a densai claim recorded on 15 December with a maturity date of 25 December and require B to discount it with a bank if it needs cash on 15 December. Even if A pays the discount charge separately, B must still apply for discounting and obtain the funds. The test in Question 80 of the JFTC’s Q&A is whether B is assured of receiving the equivalent of the full price in cash on the due date without having to discount the claim or take a similar step. For an ordinary densai payment, A should set the date of the record of accrual and the maturity date so that the full amount can be settled through the parties’ accounts by 15 December. [4] [16] [17]
Even if the maturity date coincides with the contractual due date, making B bear a receipt fee or system charge arising on settlement constitutes late payment, whether or not B has agreed. Question 82 of the JFTC Q&A addresses a consolidated settlement arrangement under which the supplier initially bears a receipt fee or similar charge. The parties must agree the arrangement in advance in writing or in an electronic record. The customer must ensure the supplier receives the full amount, for example by paying it a separate sum equal to the fee by the due date, and must document the arrangement in its Article 7 records. If A instead makes an ordinary bank transfer but deducts the transfer charge from the price, the issue falls under the prohibition on reducing the price in Article 5(1)(iii). In its recommendation to PURPOSE CO., LTD. on 9 October, the JFTC made separate findings under the amended Act. Delivering bills or notes constituted late payment, while deducting amounts from the price as bank transfer charges constituted a reduction in the price. [4] [16] [17] [18]
In its recommendation of 29 September to Fuji Manufacturing Co., Ltd., which had commissioned the manufacture of components for air-blasting equipment and the transport of such equipment, the JFTC’s findings included two categories particularly relevant here. Five suppliers received bills or notes. Forty received electronically recorded monetary claims that were difficult to convert into the full amount in cash by the due date. The employee test applied to 20 of the latter group. Screening suppliers solely by stated capital and marking their payment methods collectively as ‘electronic’ would leave A unable to identify both suppliers covered by the Act and payment terms that breach it. Where payment is already overdue, A must also check the statutory interest under Article 6(1) on the unpaid balance at 14.6% per annum, from day 61, counting the day of receipt as day one, until the day of payment. Where a bill or note was delivered, its maturity date counts as the payment date for this calculation whether or not the supplier discounted it. [4] [5] [16]
Where neither the capital nor the employee test is met, a further distinction applies to orders placed on or after 1 April 2027. The Payment Notification under the Antimonopoly Act takes effect on that date and covers manufacturing and other specified consignments regardless of capital or employee numbers. It excludes suppliers whose bargaining position is found to be no weaker than that of the customer. For transactions within its scope, the customer must have a justifiable reason for leaving the price unpaid once 60 days have elapsed from receipt of the goods or services. The JFTC explains that, where only the Payment Notification governs and the customer uses an electronically recorded monetary claim or a comparable instrument, the customer must arrange for the supplier to be able to obtain payment from a financial institution within 60 days, for example by having the claim recorded. The supplier need not have received the full price in cash within that period. Requiring it to bear ordinary discount charges or similar costs of obtaining cash does not in itself contravene the Notification. A customer that uses a claim which is difficult to discount with an ordinary financial institution and makes its supplier bear an unusually high discount charge may, however, be abusing a superior bargaining position. The terms of A’s payments to B remain subject to the Toriteki Act and must be assessed under that Act. [6] [16] [20]
Chapter 4 What rights does the recipient of a densai acquire?
Even if A and B sign an agreement to settle the price of the components by densai, their signatures alone do not create a densai claim in B’s favour. A densai is an electronically recorded monetary claim recorded on Densai-Net, the service operated by densai.net Co., Ltd. Under Articles 3, 15 and 16 of the Electronically Recorded Monetary Claims Act, the claim for the specified amount arises only when the recording institution enters the amount, the payment date, the creditor, the debtor and the other required particulars in its registry. The payment schedule in A’s purchasing system shows when A plans to pay for the components. The record of accrual identifies the separate right to payment that will be used to settle that price. The counterparty and the amount may appear identical in both records, but each establishes a different fact. [21] [22] [23]
To begin using the system, the parties check their respective user agreements and settlement accounts and request the appropriate record through their participating financial institutions. Where A makes the request as debtor, it submits B’s request together with its own under the operating rules. An employee may enter a future recording date, obtain a manager’s approval and transmit the request to the bank. The date on which Densai-Net accepts the request may still differ from the specified date on which the claim is entered in the registry. A should reconcile the acknowledgement of its request with the resulting record. B should check the record number, debtor, amount and due date shown in its notification against the purchase order. An error should be reported promptly to the participating financial institution. Whether the consent of the counterparty or another interested party is needed to amend or cancel an incorrect entry depends on when the request is made and whether an assignment or other subsequent event has already been recorded. [21] [23]
What then becomes of B’s underlying claim for the price of the components? The Financial Services Agency and the Ministry of Justice explain that creating an electronically recorded monetary claim as a means of paying the price does not in itself extinguish the underlying claim. What B can recover if the densai goes unpaid depends on the arrangement. The parties may agree that the creation or assignment of the densai will itself discharge the price debt as substitute performance under Article 482 of the Civil Code and then have that creation or assignment recorded. Alternatively, B may simply take the densai as a means of obtaining payment. A provision in the purchasing department’s contract may conflict with a standard notice from the accounts department stating that payment is complete on receipt of the densai. Wording that neither party had questioned may become decisive on the very day the funds prove insufficient. The order terms should specify what will count towards payment of the price, taking account of the payment obligations under the Toriteki Act. [9] [16] [21] [22]
Suppose instead that C has created a densai to pay for the pumps and A wishes to assign to B part of that claim equal to the price of the components. If A were assigning the pump receivable itself and relying on Article 467 of the Civil Code to give the assignment effect against others, A would have to notify C of the assignment or obtain C’s consent to invoke the assignment against C. To invoke it against third parties other than C under the same Article, the notice or consent must be given by an instrument bearing a certified date. For an electronically recorded monetary claim, Article 17 of the Electronically Recorded Monetary Claims Act makes a record of assignment a condition for the assignment itself to take effect. Even if A sends B an assignment agreement and C acknowledges receipt, B does not acquire the densai without that record. [9] [21] [22]
To assign part of a densai, A divides the amount in the registry and has the assignment of the newly separated claim recorded. If A assigns B ¥6 million out of a ¥9 million claim against C, the records allow each party to trace B’s ¥6 million claim and A’s remaining ¥3 million. Under Article 31(2) of Densai-Net’s operating rules, an assignor requesting a record of assignment must, as a rule, also request that its guarantee of the assigned claim be recorded. A then becomes an electronically recorded guarantor for the assigned amount. If C fails to pay, B may call on A to honour the guarantee even though A has assigned the claim. A further question arises if the claim against C matures after A has promised to pay B. An exact match between its face value and the price of the components does not resolve the late-payment issue discussed in Chapter 3. Both the guarantee and the timing must be considered before A assumes in its cash forecast that a single assignment will both collect its receivable and settle its payable. Even if the dates coincide, A has not met its payment obligation under the Toriteki Act if C’s default prevents B from receiving the full amount by the agreed date. [4] [16] [17] [21] [23]
At maturity, settlement normally takes place by transfer between accounts through Densai-Net. If A created the densai as debtor, it must fund its settlement account by the applicable cut-off time. Its financial institution then debits A’s account and transfers the amount to the account of the person who holds the claim at that time. The creditor does not normally need to submit the claim for collection. Once notified of settlement, Densai-Net enters the record of payment when three bank business days have elapsed, counted from the due date. The absence of a record of payment from the registry on the due date does not, on its own, mean the money has failed to arrive. Equally, a transfer scheduled for automatic settlement can fail if the account has insufficient funds. B should check the credits to its settlement account to establish what it can use that day. [21] [23]
Timing also matters if the parties switch to an ordinary bank transfer. Under Article 477 of the Civil Code, a transfer discharges the debt when the creditor acquires the right to withdraw the amount from its deposit account. The date on a transfer booking or on a notice that a densai has been created does not, by itself, prove that the recipient’s account was credited. Article 40 of the operating rules provides for payment on the due date ordinarily to be made by transfer between accounts and prohibits partial payment of a densai before maturity. If A needs to make a separate bank transfer for components for which a densai already exists, it should first establish with B and the participating financial institution whether B still holds the claim, whether the scheduled settlement can be stopped and how to arrange the requisite record of payment. If the claim has been assigned, A risks paying the wrong party. If the necessary steps cannot be completed in time, A’s account may also be debited a second time for the same transaction. Reconciling each order number with the corresponding claim record and bank transfer entry establishes which debt A actually settled. [9] [21] [23]
Chapter 5 Funding the interval between paying for components and collecting the sale price
The paper promissory note that A received from its customer C for the earlier batch in our opening example remains a separate item for collection. For the next delivery of pumps to the same customer, assume that A agrees from the outset to accept densai. There is no change to the earlier note. The following dates, amounts and interest rates are hypothetical, viewed as at 4 November 2026. On 16 November, A takes delivery of components that it commissioned B to machine to A’s drawings. The transaction falls within the Toriteki Act, and A is to pay B the ¥6 million machining fee by bank transfer on 15 December. C is buying the finished standard-specification pumps for ¥9 million. A holds a densai claim against C for that amount, payable on 25 December. Payment for the components and collection of the price of the pumps fall on different dates. [4] [24]
Suppose A has ¥2.5 million in available cash at its bank immediately before the transfer on 15 December, with no other receipts or payments before 25 December apart from those in the example. A can borrow the ¥3.5 million shortfall on the 15th, pay B ¥6 million and bridge the gap until it receives ¥9 million from C on the 25th. At 3.65% per annum, with simple interest on a 365-day basis for ten days and no fees, interest is ¥3,500. After repaying principal and interest on the 25th, A has ¥5,496,500 left. Across the month, the sale proceeds exceed the machining fee by ¥3 million. A month-end cash surplus tells the treasurer little about whether the bank can execute the transfer on the 15th. [24]
Suppose instead that on the 15th A splits off ¥6 million of the densai claim against C and assigns it to B. The creditor changes, but the claim remains payable in cash on the 25th. To obtain the money on the 15th on those terms, B would have to apply for discounting and undergo the bank’s credit assessment. The JFTC takes the view that, in a transaction covered by the Toriteki Act, payment is late if the small or medium-sized entrusted business operator must discount the claim or take a comparable step to receive money on the agreed payment date. That remains so even if the entrusting business operator adds the discount charge to the price or pays it separately. Saving A the trouble of a loan application is no reason to make B arrange the finance. [4] [24]
A can itself have a financial institution discount the claim against C and use the proceeds to pay B by bank transfer. Suppose the bank discounts ¥3.6 million of the claim on the 15th. At the same annual rate of 3.65% for ten days on a 365-day basis, the discount charge is ¥3,600. With no other charges, the bank credits ¥3,596,400 to A. Together with its existing ¥2.5 million, that leaves A with ¥96,400 after paying B ¥6 million. On the 25th, A receives the unassigned ¥5.4 million of the original ¥9 million claim. Had A discounted exactly ¥3.5 million, the net proceeds would have fallen short by the amount of the discount charge. Before entering the expected credit in its cash forecast, A needs confirmation of the bank’s approval, the rate and fees, and the time at which the funds will be available. [24] [25]
Discounting does not necessarily end A’s exposure to C. Under Densai-Net’s rules, an assignment normally carries a record of guarantee and the assignor becomes the guarantor. The position resembles that of an endorser of a paper promissory note, but the legal basis for A’s liability here is the electronic guarantee. A separate obligation may arise under the discount agreement. If it contains a repurchase provision, the bank may be entitled to require A to repurchase the claim if C fails to pay. A should establish whether a guarantee has been recorded and, separately, which events trigger repurchase under its agreement with the bank and how much it would then have to pay. Even after A removes the discounted ¥3.6 million from its schedule of expected receipts from C, it may still face a claim for that sum. [21] [23] [24] [26]
For a bank considering an application against A’s ‘¥9 million due from C’, the amount available for discounting depends on how much A has already assigned and how much it still holds. A should give the bank the material needed to reconcile the purchase order and evidence of dispatch with the densai record number, maturity date and assignment history. It should also explain how much it could meet from its own resources if collection from C were delayed. The bank can then judge whether proceeds from the same delivery have already been counted elsewhere as a source of repayment and whether too much is falling due from C alone. Under Gunma Bank’s discount terms, for example, discounting takes effect once the bank has approved the transaction and the assignment has been recorded. The bank may set the date for paying the discount proceeds within a reasonable period after its decision. A cannot simply enter the application date as the date of receipt in its cash forecast. [24] [25] [26]
If receipt from C slips to 8 January of the following year, the interval from 15 December extends to 24 days. On the borrowing assumption, if A can keep the ¥3.5 million in place at the same rate until then, interest rises to ¥8,400. The increase is only ¥4,900. But if repayment is due on 25 December, A must either find ¥3.5 million to repay the principal or agree an extension with the bank. Nor will an overdue densai claim automatically be presented for settlement again on 8 January. When revising the expected date of receipt from C, A’s cash forecast should still show that it paid B on time, alongside the separate amount and period for which A itself now needs funding. [23] [27]
Chapter 6 Duplicate densai claims and how to stop settlement
A invoices C ¥9 million for the pumps, but its list of incoming densai claims shows two entries with the same amount and due date and different record numbers. An instruction may have been resubmitted after a connection failure, or two batches may happen to have the same price. A should set both entries aside for the time being when selecting claims to discount or assign. It should check the order numbers, delivery dates, invoice amounts and times at which the claims were recorded against C’s records. C retrieves the instructions it submitted and the bank’s acknowledgements. A preserves the register details disclosed for both entries. Removing one entry from the sales ledger leaves both in the register and does nothing to settle which claim should be paid. Once the duplication is confirmed, the companies should agree on the record number to retain and the one to cancel. [21] [23] [24]
Where C, as debtor, requested the record creating the claim, A, as the creditor receiving notice, has a limited period in which to request cancellation. In formal terms, A requests a record of amendment deleting the original entry. The usual period is five bank business days, counting the date the claim arose. If that date is a bank holiday, the count starts on the following bank business day. Where the payment date is close, the deadline is brought forward to the third bank business day before payment is due. The window can be as short as one bank business day. Once an assignment or another relevant entry has been recorded, this simplified procedure is no longer available. If the claim has yet to arise and C has merely scheduled the request for a future date, the first questions are whether that request can still be cancelled and what cut-off the bank applies. A subsequent assignment already scheduled against the claim may have to be cancelled first. [23] [24] [28] [29]
If the only error is the amount of one claim, the parties can amend that amount while retaining the original entry. In the ordinary case, where the original record creating the claim is the only electronic entry and no further request has been scheduled, A or C can apply for an amendment through online banking or a similar channel. The request must generally be made by the seventh bank business day before the due date. The other party must consent within five bank business days, counting the date on which Densai-Net issued its request for consent, and in any event by the third bank business day before the due date. If time is short, the applicant should establish when the other party can give its approval. Where an assignment or guarantee has already been recorded, all interested parties must participate in the written procedure. As a rule, the documents must reach Densai-Net by the third bank business day before the due date. The bank handling the application may set an earlier deadline for receiving the papers. Creating a replacement claim before the original has been dealt with leaves two claims on the register if the original cannot be amended. [23] [24] [28] [29]
If C’s instruction and the bank’s acknowledgement both show ¥9 million and only the register differs, the discrepancy should be reported immediately to the bank for investigation. ‘Correction’ under Densai-Net’s operating rules is a procedure for cases such as an entry that differs from the information supplied. If a third party has a legal interest in the electronic record, its consent is required. A later objection by C to the performance of the pumps is a different matter if the entry accurately reflected the sale agreement when made. If A has already assigned the claim to its bank, Article 20 of the Electronically Recorded Monetary Claims Act, including its exceptions, determines whether C can invoke against the bank a defence it has against A under the sale agreement. [21] [23] [28]
A dispute may arise just before settlement. Emptying the settlement account does not satisfy the requirements for stopping settlement by inter-account transfer. A debtor may request a stop only in the circumstances permitted by the detailed operating rules, for example where the creditor has consented or the debtor has a defence enforceable against the current creditor. The request is due no later than the bank business day before the payment date. If C also lodges an objection based on a Category 2 ground for non-payment, such as non-performance of the underlying contract, it must submit the prescribed papers to its bank by that same bank business day. As a rule, it must deposit an amount equal to the claim by the deadline set by the bank, which can be no later than the payment date. Once the objection takes effect, the notice of non-payment to participating financial institutions and any suspension of transactions on that ground are held in abeyance for the duration of the procedure. The parties to the transaction are nevertheless informed of the reason for non-payment and related particulars through their respective banks. The procedure does not adjudicate liability under the sale or determine whether the densai claim is payable. Nor is the deposit immediately released to A. [23] [27] [28]
A simple shortage of settlement funds may constitute a Category 1 ground for non-payment. Subject to the exceptions in its rules, Densai-Net notifies participating financial institutions of the non-payment. If several densai claims against the same debtor go unpaid on the same day, they count as a single incident. A second qualifying incident involving another claim due within six months of the first claim’s due date generally results in a suspension. Ordinarily, the suspension runs from the date notice is sent to participating financial institutions until two years have elapsed from the due date of the second unpaid claim. During that period, the debtor’s ability to use densai in that capacity and to borrow from participating financial institutions is restricted. There is an exception for lending to protect a financial institution’s existing claims. If A sees no credit on the morning payment is due, its first step is to ask its bank where settlement stands. If the claim goes unpaid, the identity of the party entitled to pursue payment and the steps to recover it differ between the portion A retained and the portion assigned to the bank. [23] [27] [28] [30]
For the portion it still holds, A should preserve the details disclosed from the register, its bank’s notice giving the reason for non-payment and the underlying transaction documents, then seek payment from C. A valid payment discharges the obligation without a separate record of payment. If, however, A pays under its electronic guarantee of the assigned portion, recording that payment is a condition of acquiring the special right of recourse under Article 35 of the Electronically Recorded Monetary Claims Act. This is the guarantor’s statutory right to reimbursement after payment. If the bank instead requires A to repurchase the claim under the discount agreement, A should confirm the repurchase price and how the claim will be reassigned to it. The steps appropriate to payment under the guarantee cannot simply be carried across to a repurchase. If C later pays by bank transfer, A should identify the amount applied to each record number and reconcile the recorded payment with the money actually received. A receipt in the cash forecast and the release of A from liability to its bank may fall on different dates. [21] [23] [26] [27]
Chapter 7 Who has been paid when the money goes to the wrong account?
Suppose A and B agree in November that A will pay for the parts by bank transfer. They can dispense with the arrangements for collecting a paper note on those orders. They must now establish which account belongs to B. A message announcing a new accounts contact and giving fresh payment instructions might ordinarily attract attention. If it arrives with notice of the switch to bank transfers, it may look like the very instruction A was expecting. Even two people approving every subsequent payment may miss an error in the original entry if both rely on the same supplier record.
A case documented by Japan’s Innovation Platform Agency (IPA) shows how an impostor exploited a switch from cheques to bank transfers. An overseas affiliate of a Japanese organisation had been paying a US supplier by cheque each month. Someone posing as the supplier’s representative asked the affiliate to change the payment method. In February 2021 it paid into the fraudulent account. In March it received different account details and sent the March and April payments as instructed. The fraud came to light in May, when the real supplier asked why it had received nothing. The events took place abroad. The reason the loss recurred, however, is familiar to any business that makes monthly payments from a standing supplier record. [11]
Under Article 477 of the Civil Code, payment by bank transfer takes effect when the creditor acquires the right to withdraw the corresponding amount from the financial institution that holds its account. The time at which A schedules a transfer, or even a debit appearing on A’s own statement, does not establish that A has paid B. For an order within the Toriteki Act, A must allow for year-end bank holidays and submission cut-offs so that B can receive the full amount on the agreed date. An accounts system that marks a scheduled transfer, a transfer returned for incorrect details and a confirmed credit to B’s account alike as ‘paid’ can conceal a missed payment until after the due date. [4] [7] [9]
The Supreme Court’s judgment of 26 April 1996 illustrates what happens in the unintended recipient’s account. A company paying rent and related charges mistakenly specified an ordinary deposit account belonging to a former trading partner. A creditor of the account holder attached the deposit claim, and the company that had sent the money sought to prevent enforcement. The Supreme Court dismissed its claim. Under the ordinary deposit arrangements in question, the account holder acquired a claim against the bank for the amount credited, although no underlying legal relationship between the sender and the account holder justified the transfer. The sender could seek restitution from the recipient for unjust enrichment. That personal claim gave the sender no right to treat the deposit as its own property and remove it from the reach of the attaching creditor. [10]
The judgment decided who owned the deposit claim. Whether A still owes B after acting on fraudulent instructions calls for a separate inquiry. Did B authorise the recipient to collect the price, or did B itself approve the new account? If neither occurred, Article 478 of the Civil Code asks whether, by ordinary commercial standards, the recipient had the appearance of a person entitled to receive payment, and whether A relied on that appearance in good faith and without negligence. Where Article 478 does not apply, payment to an unauthorised recipient is effective under Article 479 only to the extent that the true creditor benefited. A plausible sender address or a report to the police cannot, on its own, establish those conditions. [9] [10] [31]
A and B can agree at the outset how they will authenticate a change. Their purchase order might require A to arrange for the full ¥6 million machining charge to reach an account designated by and held in B’s own name on 15 December, with A bearing the transfer fee. The parties can also agree to verify new details through named contacts using information already on file, and to apply the change to specified invoices once A confirms verification. A clause allowing a delay in A’s internal approval to postpone the due date would put a date fixed for B’s benefit under A’s control. If verification is unlikely to finish in time, A should establish with B whether the existing account remains available or whether the parties can independently verify another means of payment. [4] [9] [31]
The employee handling the request can call B on a number held independently of the incoming email and confirm the account name, the effective date and the invoices concerned. The employee who approves the change to the supplier record should leave authorisation of the first transfer to a second person. A should obtain confirmation from B that the first payment arrived. Calling the number in the change request offers little protection if the same impostor controls both the email and the telephone. A business card or an earlier contract can be especially valuable when a familiar contact has left or a group is centralising its billing. [11] [31]
If a suspect transfer has already been instructed, A needs to establish both where the money is and what it still owes. It should contact its bank immediately, ask whether the instruction can be stopped before processing or the transfer recalled afterwards, and alert the police and B through a known channel. An ordinary recall after funds have been credited generally requires the recipient’s consent. The bank’s acceptance of a recall request is therefore no basis for recording a recovery. A should preserve the payment confirmation, the history of amendments to the account details, the original emails and the time-stamped authorisations. It should also stop any later transfers scheduled under the same instructions. In parallel, it must decide whether it still owes B and, if so, how it will fund payment by the agreed date. [9] [10] [31] [32]
The accounts team that checked the original note for the earlier batch, maturing on 27 November, must pay for the next batch’s components on 15 December, before the related densai falls due on 25 December. A can choose how to fund the interval. A ‘settled’ entry in its books cannot release a guarantee on a discounted densai or extinguish a debt still owed to B after a misdirected transfer. When management considers a change in payment terms, it needs to see when each customer will pay, when each supplier must be paid, how A will finance the difference and which obligations A will retain after settlement.
Frequently asked questions
Q1 Can we still take a promissory note we received by September 2026 to our bank?
Check the date of issue and maturity on the instrument, the last date for issuing instruments set by the bank designated as the place of payment, and the service and cut-off offered by your own bank. The date you received the note settles none of those questions. A bank may have stopped accepting other-bank paper for deposit but still accept qualifying instruments for collection. Even a note maturing at the end of March 2027 may have to reach the collecting bank well before then. [1] [2] [12]
Q2 On 1 April 2027, what happens to an unpaid note and the trade debt for which it was given?
Clearing of bills of exchange, promissory notes and cheques generally ends on 31 March 2027, subject to a limited exception for instruments that a participating bank accepted for collection through clearing by 30 April 2026. That exception permits clearing only until 29 June 2029. The change does not discharge the obligations, and the holder must establish what collection route remains available. A claim on the instrument has different conditions and limitation periods depending on whether it is brought against the maker or an endorser. Whether the trade debt survives also depends on whether the note was taken as a means of payment or accepted in satisfaction of that debt. The clearing deadline neither extinguishes claims nor extends the time for taking steps to preserve them. [1] [8] [9] [13] [15]
Q3 We missed collection on the maturity date. What should we check immediately?
A promissory note payable on a fixed date may be presented on the day it is payable or on either of the next two business days. Ask the bank at the place of payment and your own bank whether and where presentment has already occurred and whether valid presentment is still possible. If recourse against an endorser matters, establish whether a protest is necessary and when notice must be given. The requirements for suing the maker differ from those for recourse against an endorser. A telephone demand does not take the place of the formal steps the latter may require. [13]
Q4 We have discounted a note with our bank. Can we accept a bank transfer from its maker instead?
Before agreeing to a transfer, identify the current holder and check the discount agreement. If the bank acquired the note on discounting it, the original payee cannot return the instrument on its own. Involve the bank in settling which debt the payment will discharge, who is to pay whom and when the original instrument is to be returned. Even if the bank is merely collecting as agent, confirm that there is still time to stop collection before the parties arrange a separate transfer. [8] [12] [13] [15]
Q5 Can a purchaser continue paying by bill of exchange or promissory note if the supplier prefers it?
For an order placed on or after 1 January 2026 that meets the Toriteki Act’s tests for the type of work entrusted and the size of the parties, delivering a bill or note in payment is prohibited even with the supplier’s consent. An earlier framework agreement does not preserve the former terms for new orders. Conversely, a purchase of standard goods off the shelf does not come within these rules merely because the seller is a small or medium-sized business. [4] [16] [17] [18]
Q6 If we cover the discount charge, can we pay a supplier under the Toriteki Act with a densai maturing after the agreed date?
Where the supplier must apply for discounting to receive the full price in money on the agreed date, reimbursing the charge still leaves the purchaser in breach of the rule against late payment. If the price is due 30 days after receipt of the goods, that is the date that matters. A purchaser holding a later-maturing densai can seek to discount it for its own account and pay the supplier in full by bank transfer on time. In that case the purchaser itself obtains the finance and the supplier receives the agreed price. [4] [5] [16]
Q7 Is passing on a densai receipt fee treated in the same way as deducting a bank transfer fee?
The JFTC treats a fee imposed on the supplier for receiving settlement of an electronically recorded monetary claim in a covered transaction as late payment, because the supplier is not assured of receiving the full price. Deducting the transfer fee from an ordinary payment of the agreed price can instead constitute a prohibited reduction of that price. For a consolidated settlement arrangement in which the supplier initially bears the fee, the JFTC requires advance agreement in writing or electronically, receipt of the full amount by the due date, and preparation and retention of the requisite records. The supplier’s consent alone is insufficient. [4] [16] [18]
Q8 From April 2027, will the same cash payment test apply to transactions outside the Toriteki Act?
The Payment Notification under the Antimonopoly Act can reach orders for manufacturing and other specified work placed on or after 1 April 2027 outside the statutory size thresholds, depending in particular on the parties’ relative bargaining position. Where the Notification alone applies and an electronically recorded monetary claim is used, the supplier must be able to obtain payment from a financial institution within 60 days of receipt of the goods or services, unless a justifiable ground for later payment applies. The JFTC does not require the supplier to have received the full amount in cash within that period. A separate question of abuse of a superior bargaining position can arise if a purchaser uses a claim that is difficult to discount with an ordinary financial institution and thereby imposes unusually high discount charges on the supplier. Check both which rule applies and how the supplier can actually obtain payment from a financial institution. [6] [7] [20]
Q9 If we divide a densai and transfer part of it to a supplier, who bears the risk that our customer will fail to pay?
The supplier becomes creditor for the amount transferred. Under the rules of Densai-Net, however, recording a transfer generally entails recording a guarantee by the transferor. Removing that amount from your own expected receipts does not eliminate the risk of a call on the guarantee. A bank discount agreement may also give the bank a right to require repurchase. Credit records should distinguish the portion transferred, the portion retained, and the amount for which a guarantee or repurchase obligation may still be called. [21] [23] [25] [26]
Q10 Two densai were created in error. Is it enough to remove one from our ledger?
Reversing an accounting entry leaves the register untouched. Both parties should establish which record is correct by checking the record numbers, creation times, debtor, amounts and due dates. Ask the financial institution through which you use the system about cancellation or amendment. Where the debtor requested creation, the time allowed for the creditor to request cancellation is shorter if maturity is close. If the claim has already been transferred, a written acknowledgement of error by the two original parties may be insufficient because a third party now has an interest. If the instruction submitted to the bank was correct but the register differs, preserve the evidence and ask about correction of the register. [21] [23] [28] [29]
Q11 Delivery is in dispute. Can we move the money out of the densai settlement account?
Withdrawing the money risks a payment failure for insufficient funds while leaving the contractual dispute outside the prescribed procedure. Establish whether you have a defence enforceable against the present creditor and contact your financial institution immediately. Stopping settlement by inter-account transfer and objecting on a Category 2 ground for non-payment involve distinct procedures. Check the grounds, cut-offs and documents for each, and the security deposit required for an objection. Filing an objection does not determine liability for the purchase price or under a guarantee. [21] [23] [27] [28]
Q12 We acted on a fraudulent email changing the supplier’s account. Do we still owe the supplier?
Determine whether the recipient had authority, what objectively gave the appearance of authority, whether the payer acted in good faith and without negligence, and whether the real supplier obtained any benefit. The fact that the money left your account does not by itself discharge the debt. Ask the bank to stop or recall the transfer, call the supplier using trusted details and stop further payments to the same account while those questions are being investigated. If the contractual due date is approaching, establish what remains payable and how to fund it, independently of how much of the misdirected money has been recovered. [9] [10] [11] [31] [32]
About the Legal Update series
In the SAKURA Law Office Legal Update series, Managing Partner Kenshiro Michishita examines how legislation and court decisions affect contracts and business decisions, drawing on the original sources. Following the entry into force of the Toriteki Act, Issue 36 followed a commissioned transaction from price negotiations through the purchase order to payment. This issue examines settlement from the perspective of a manufacturer that must pay its supplier before it collects from its customer.
Related reading | Legal Update No. 36 on the Toriteki Act and supply-chain reform
SAKURA Law Office | Profile of Managing Partner Kenshiro Michishita
How SAKURA Law Office can assist
The firm advises on collection of outstanding instruments, revision of contracts when payment methods change, payment terms under the Toriteki Act and disputes over the assignment or non-payment of densai. Purchase orders and invoices, copies of both sides of a paper instrument or details disclosed from the densai register, and notices from the banks involved can help establish which steps remain open before the next payment date.
Principal sources
The numbered links in the text and FAQs lead to the same primary materials cited in the Japanese edition. The titles below are given in English. Most links open the Japanese original. English-language material is identified separately where provided. Translations of legislation are for reference; the Japanese statutory text governs.
01 Japanese Bankers Association, Decision on the End of Clearing at the Electronic Clearing House and Confirmation of the Final Clearing Date for Bills, Notes and Cheques (18 June 2026). Electronic Clearing House Rules, Article 13(2) (PDF p. 5). Comparison showing the March 2026 amendments (PDF pp. 1 and 6). General clearing deadlines, the limited exception for instruments already accepted for collection, its implementation date and bilateral settlement after clearing ends.
02 Japanese Bankers Association, Electronic Clearing House. How clearing works. Includes the issue deadlines announced by individual financial institutions as at 30 October 2026 and a list of institutions participating in the Electronic Clearing House as at 2 November 2026. List of final issue deadlines (PDF).
03 Bank of Japan, Payment and Settlement Systems Department, Payment and Settlement Statistics (September 2026). Published on 30 October 2026. Page 6 (PDF p. 8), ‘The Electronic Clearing House’s Bill and Check Clearing System’, gives the average daily clearing volume per business day and the year-on-year percentage change.
04 Japan Fair Trade Commission, Frequently Asked Questions on the Toriteki Act. Setting payment dates and the effect of inspection or receipt of an invoice. Questions 80 to 83 cover discounting, fees charged to recipients, reimbursement of fees initially borne by the supplier and interest for late payment when a note is issued.
05 Japan Fair Trade Commission, Recommendation to Fuji Manufacturing Co., Ltd. 29 September 2026. The recommendation and accompanying summary set out the findings of late payment, the employee threshold applicable to suppliers paid by electronically recorded monetary claims and the measures recommended in respect of outstanding amounts and interest for late payment.
06 Japan Fair Trade Commission, Summary of Public Comments and the Commission’s Responses. Published on 17 June 2026. Responses 23 to 25 and 47 on the draft Payment Notification and operational guidelines address the cost of converting claims into cash, transfer fees, the rules on abuse of a superior bargaining position under the Antimonopoly Act and orders placed before and after the effective date.
07 Japan Fair Trade Commission and Small and Medium Enterprise Agency, Appropriate Payment throughout the Supply Chain as the Use of Promissory Notes Is Phased Out. 2 September 2026. The request addresses the respective scope of the Toriteki Act and the Payment Notification, a review of payment terms and support for businesses’ cash-flow needs.
08 Supreme Court of Japan, Third Petty Bench, judgment of 24 August 1965, 1964 (O) No. 371, Claim for Repayment of a Loan. The Court’s reasons on the third ground of appeal. The purpose of ordering payment against surrender of the notes and the debtor’s liability for delay in performing the underlying obligation.
09 e-Gov Law Search, Civil Code (Act No. 89 of 1896). Articles 166, 467, 477 to 479, 482 and 533. Limitation periods, assignment of claims, payment by bank transfer, payment to a person other than the person entitled to receive it, and substitute performance.
10 Supreme Court of Japan, Second Petty Bench, judgment of 26 April 1996, 1992 (O) No. 413. Minshu, vol. 50, no. 5, p. 1267. The recipient’s ordinary deposit claim following a mistaken transfer and the payer’s third-party objection to compulsory execution. Full text of the judgment published by the Court.
11 Information-technology Promotion Agency, Japan (now Innovation Platform Agency, Japan), Detailed Case Study of Business Email Compromise (BEC), Case 3. Published on 29 November 2022. An overseas affiliate was asked to switch from cheques to bank transfers and made payments to fraudulent accounts over a three-month period.
12 MUFG Bank, Points to Note When Using Bills, Notes and Cheques. As at 1 October 2026. The distinction between accepting instruments payable at another bank for deposit and accepting them for collection, the final issue date and treatment of post-dated cheques. See the checklist for acceptance for collection.
13 e-Gov Law Search, Bills and Notes Act (Act No. 20 of 1932). Articles 17, 38, 39, 44 to 46, 53, 70, 72, 77 and 78. Presentment for payment, recourse, limitation periods and the liability of the maker of a promissory note.
14 e-Gov Law Search, Checks Act (Act No. 57 of 1933). Articles 28, 29, 32, 39 to 42, 51, 60 and 61. Payment at sight, the period for presentment for payment, recourse and limitation periods.
15 National Tax Agency, Basic Circular on the National Tax Collection Act, guidance on Article 62, item 15, Claims in Respect of Which a Bill, Note or Cheque Has Been Issued. The distinction between issue as a means of payment and acceptance in satisfaction of a debt, and surrender of the instrument. Cites judgments of Japan’s pre-war Court of Cassation of 15 February 1928 and 19 November 1938.
16 e-Gov Law Search, Act on Preventing Delay in Payment to Small and Medium-Sized Entrusted Business Operators in Relation to Manufacturing Consignment (the Toriteki Act). Act No. 120 of 1956. Article 2 defines manufacturing consignment and the applicable size thresholds. Articles 3 to 7 govern payment dates, disclosure, prohibited conduct, interest for late payment and the creation and retention of records. JFTC English reference translation reflecting Act No. 41 of 2025, effective 1 January 2026.
17 Japan Fair Trade Commission, Operational Guidelines for the Toriteki Act. Revised on 1 October 2026. Transactions and parties within scope, information to be disclosed when an order is placed and the interpretation of late payment. See illustrative cases 2–14 to 2–16.
18 Japan Fair Trade Commission, Recommendation to PURPOSE CO., LTD. 9 October 2026. Distinguishes transactions governed by the former and amended legislation and makes separate findings on the issue of notes and deductions for transfer fees. Full text of the recommendation.
19 Japan Fair Trade Commission, Obligations of Entrusting Business Operators. Information to be disclosed when placing an order and the contents of transaction records. Article 3 of the record-keeping rules under Article 7 of the Act (JFTC Rules No. 10 of 2025) requires retention for two years from the date all required particulars have been entered. Rules on the Preparation and Preservation of Records, Articles 2 and 3.
20 Japan Fair Trade Commission, Specific Unfair Trade Practices concerning Payment for Manufacturing Consignment, etc. (the Payment Notification). Japan Fair Trade Commission Notification No. 3 of 18 June 2026. Identifies the parties to manufacturing and related consignments, addresses payment following receipt and the exception for justifiable grounds, and takes effect on 1 April 2027. JFTC explanation in English.
21 e-Gov Law Search, Electronically Recorded Monetary Claims Act. Act No. 102 of 2007. Articles 2 and 3, 15 to 18 and 20, and the provisions beginning at Articles 31, 43 and 62. Creation, transfer, guarantee and division of claims and settlement by inter-account transfer.
22 Financial Services Agency and Ministry of Justice, Electronically Recorded Monetary Claims. An introduction to the statutory framework, with questions and answers at the end. The legal effect of recording, the distinction from an assignment of trade receivables and the relationship with the underlying claim.
23 densai.net Co., Ltd. (Densai-Net), Operational Rules. Version revised on 18 November 2024. See Articles 23 to 33 and 39 to 51 on requests for and consent to recording, guarantees on transfer, inter-account settlement, sanctions for non-payment and the objection procedure.
24 Densai-Net, Guide to Using Densai. A guide for users to the creation and partial transfer of claims, discounting, recording amendments and the settlement process.
25 MUFG Bank, What Is Densai? A participating financial institution’s account of its practice, including the need for bank approval for discounting, the provision of claims as collateral and the use of claims in receivables financing.
26 The Gunma Bank, Ltd., Terms for Discounting Electronically Recorded Monetary Claims. Articles 1 to 4. Approval of a discount, the effect of recording the transfer, the payment date for discount proceeds and repurchase under a separate agreement.
27 Densai-Net, Questions and Answers on Non-payment of Densai. See questions 1, 2, 6, 7, 18, 21 and 24 on claims following non-payment, settlement outside the inter-account transfer system, payment records and recourse after a guarantor pays. Some passages describe earlier rules; the applicable requirements and time limits should be checked against current legislation and the current rules in sources 23 and 28.
28 Densai-Net, Detailed Operational Rules. Version revised on 18 November 2024. See Articles 23, 33, 36 and 42 to 48 on amendments, advance requests for recording, correction of records, stopping settlement and the objection procedure.
29 Densai-Net, What Can I Do If I Created a Densai Claim for the Wrong Amount? Frequently asked questions, ID 26. The cancellation period after creation, the consent necessary to change the amount and the written procedure required after transfer and in certain other cases.
30 Densai-Net, Non-payment of Several Densai Claims on the Same Day. Frequently asked questions, ID 69. How multiple instances of non-payment on one day are counted under Article 48 of the Operational Rules.
31 Innovation Platform Agency, Japan (IPA), Frequently Asked Questions on Business Email Compromise. Verifying requests to change the recipient account or payment method, and the immediate response on discovering a fraudulent payment.
32 SBI Shinsei Bank, Requesting Cancellation or Recall of a Bank Transfer. Distinguishes an uncredited transfer, for example because of incorrect account details, from a recall requiring the recipient’s consent after the funds have been credited.
Scope of this update
This article provides a general account of Japanese law and banking practice as at 4 November 2026 and was revised on 14 November 2026. A, B and C and their transactions are fictional. Interest rates and discount charges are assumed for the calculations. Advice on a particular matter requires a review of the terms of the instrument, the location of the original or the relevant register entry, the parties’ agreement, the applicable law and the procedures of the financial institutions concerned.