Notice

NEWS

2026.11.24

News

【SAKURA Law Office | Legal Update by Managing Partner Kenshiro Michishita】Publication of “Coffee Export Contracts Under the EU Deforestation Regulation (EUDR)”

SAKURA Law Office | Legal Update No. 58 by Managing Partner Kenshiro Michishita

From coffee plots in Brazil to customs clearance in Germany

2026 edition | Analysis as of November 8, 2026 | Rechecked and revised November 14, 2026

SAKURA Law Office | Managing Partner Kenshiro Michishita

A Japanese roaster is considering an order for 600 bags of coffee to be shipped to Germany in December. The blend contains beans harvested on two plots in Brazil. The supplier has sent two sets of coordinates. One marks the collection point where trucks pick up the green coffee. It gives no location for the trees that produced those beans. The blend meets the buyer’s specifications for flavor and quality. Can the roaster commit to a delivery date with that gap in its records?

On November 8, 2026, the Japanese seller, A, is reviewing the order from B, a large German company. A has no establishment in the EU. The order covers roasted coffee beans that have not been decaffeinated (R) and pure, unsweetened soluble coffee made by drying a coffee extract (S). Both are to be shipped from Japan in late December 2026. B will import them in its own name and have them released for free circulation in Germany in January 2027. The green coffee was harvested in 2026. The companies, plots and transactions in this example are hypothetical.

Executive Summary

The EU Deforestation Regulation (EUDR) treats the two products differently. Before B first places roasted coffee R on the EU market in January 2027, it must identify the plots of production, check that the coffee was produced in accordance with the relevant legislation of the country of production and that the plots were not converted from forest to agricultural use after December 31, 2020, and conclude that there is no or only a negligible risk of non-compliance. It must then submit a due diligence statement (DDS). If beans traceable only to a collection point have already gone into the blend, the proportion of traceable beans in the recipe cannot establish that the same proportion of the finished bags is eligible for shipment. [1,2,3]

A delegated regulation published in September 2026 added the tariff line covering soluble coffee S to Annex I. That entry applies from December 30, 2027. A may agree to provide sourcing information for the January 2027 sale of S, even though the new entry does not yet require B to obtain it. A can address the two products separately in its order confirmation. For the roasted coffee, the parties need to agree what must happen before B can submit its statement and what they will do if the evidence is late. The order confirmation is therefore the first document A’s counsel should revise. [4,1,5]

Chapter 1 Why the application dates differ

The cargo leaves Japan before the end of the year and reaches Germany in January. To determine whether the EUDR applies, B needs to know both when the goods were shipped from Japan and when they will be released for free circulation in Germany. Release for free circulation is the customs procedure through which goods arriving from outside the EU acquire the status that allows them to circulate within the EU. Acceptance of the order by A and issuance of the bill of lading by the carrier do not establish that this procedure is complete. Even after the goods arrive in the EU, they have not been placed on the market while they remain under a transit or customs warehousing procedure. [1,6]

The EUDR, Regulation (EU) 2023/1115, entered into force on June 29, 2023. That date is distinct from the date on which its main obligations begin to apply to individual transactions. Following amendments in 2024 and 2025, Article 38(2) now sets December 30, 2026 as the application date for those obligations. Under Article 38(3), the main obligations apply from June 30, 2027 to operators who are natural persons or micro or small undertakings within the meaning of that provision and were established as such by December 31, 2024. This later date does not apply to products listed in the Annex to the former EU Timber Regulation. B is a large company and does not qualify for the deferral. Its application date remains the same even if A in Japan or the growers are small. A separate exclusion under Article 1(2) must be considered if the coffee used as the raw material was produced before the EUDR entered into force. The beans in this case were harvested in 2026, so the exclusion does not apply. [1,7,6,2]

Roasted coffee R consists of beans that have not been decaffeinated, with no added sugar or other ingredients. The EU’s Combined Nomenclature (CN) distinguishes between unroasted and roasted coffee and between coffee that has and has not been decaffeinated. R falls under CN 0901 21 00. Annex I to the EUDR has covered coffee under heading 0901 since the Regulation was adopted. That heading includes beans roasted in Japan and sold as a finished product. For R, which is to be released for free circulation in January 2027, B must exercise due diligence and submit a due diligence statement (DDS) before placing it on the EU market. The 2027 edition of the CN, published in the Official Journal of the European Union on October 30, 2026, applies from January 1, 2027. It determines the code B will use on its import declaration in the new year. The EUDR has its own application date. [1,8,6]

Soluble coffee S is pure coffee made by drying the liquid extract. It falls under CN 2101 11 00, which covers extracts, essences and concentrates of coffee. On July 13, 2026, the European Commission adopted Delegated Regulation (EU) 2026/2102, adding this subheading to Annex I to the EUDR. The Delegated Regulation was published in the Official Journal on September 17 and entered into force the following day. The new entry itself, however, expressly applies from December 30, 2027. B therefore has no obligation under that entry to submit a DDS for S when it is imported alongside R in January 2027. The word “instant” on a product label cannot establish that conclusion. A different formulation containing sugar or creamer, for instance, would require a fresh classification based on its composition and the way it was made. [4,8,1]

At the November meeting to consider the order, A should first give B the ingredients and processing details for each product, the code to be used on the import declaration and the expected date of release for free circulation. For R, the parties can then agree on when B needs the records of where the coffee was grown to decide whether it can place R on the EU market. For S, they can establish whether B’s request for records in anticipation of a future legal obligation is also a condition of this sale. An earlier version of Annex I will omit the new entry for S. The current version includes the code, but reading it without the date printed alongside would wrongly give B the same deadline for both products. [1,4]

Chapter 2 The Japanese seller and the German importer

When beans roasted in Japan are sold in Germany, who must file in the EU Information System? The bags bear A’s trademark, but the buyer, B, is named as the importer on the EU customs declaration. B declares the goods for release for free circulation in its own name and supplies them for sale in the EU. It is therefore B that acts as the operator first placing this roasted coffee on the EU market. For goods produced outside the EU, the European Commission’s guidance generally looks to the person identified as the importer on the customs declaration for release for free circulation. The sales contract may specify when title passes in Japan, but that provision alone does not determine in whose name the declaration must be made or who bears the regulatory obligations. [1,6]

The information B needs from A includes the plots where the coffee was grown, the harvest period and records linking the lots A purchased to those it roasted. B’s ability to substantiate its own assessment depends in large part on what A can trace. On the terms of this transaction, shipping the goods from Japan does not itself make A the party placing them on the EU market. The result would change if A acted as the importer and placed the goods on the EU market itself, and B then became the first EU-established business to make those goods available on that market. Article 7 deems B to be an operator as well. The Commission’s FAQs explain that both A outside the EU and B within it must exercise due diligence and each submit its own statement. If the parties negotiate a change in who handles the import, they need to settle who will obtain which records and make which filing when they agree on freight costs and delivery terms. [1,6,2]

Return to the transaction as originally structured. C, a large wholesaler, buys the roasted coffee from B and supplies it in the original bags to D, a large retailer. If D also sells the bags unchanged to consumers, both C and D are traders. Following the 2025 amendment, a downstream operator is a person who places on the market or exports a relevant product made using other relevant products, all of which are covered by an existing due diligence statement or simplified declaration. That category can also cover a person exporting a product already covered by such a statement or declaration, without further processing, as the Commission’s guidance explains. C is immediately downstream of B, but its resale of the bags within the EU does not make it a downstream operator within this definition. Both C and D are subject to Article 5 as amended. Even a wholesaler of C’s size need not resubmit B’s statement in its own name in order to resell the goods. [1,7,2,6]

The difference is apparent in the information that accompanies the incoming goods. Under Article 4(7), B gives the reference number of its DDS to C, its direct customer. C knows that B placed the coffee on the EU market. If B has not provided the number, C cannot supply D until it receives it. C must keep the number in a way that identifies the delivery to which it relates. There is no general obligation for C to pass that number on to D or for D to retain it. The Commission’s FAQs explain that the first recipient does not have to link the number it received to each individual outgoing shipment. If B also sells the same coffee directly to D, D becomes the first recipient for that delivery and must obtain the number directly from B. [1,2]

Under Article 5, both C and D must collect and retain identifying details for their direct suppliers and for the downstream operators or traders to whom they supply the relevant products. Those details include the name, registered trade name or registered trademark, postal address, email address and, if available, website address. Each must retain the information for at least five years from the date it makes the goods available on the market and provide it to the competent authorities on request. D need not collect the name of a consumer who buys a bag for personal use in its store. C and D are both large enterprises, so both must also register in the Information System before supplying the goods. Receiving B’s reference number, registering C in the system and viewing B’s statement in the system serve different purposes. There is no general obligation to give a customer the separate verification number used to access the statement. The parties can agree at the outset on what they will disclose and how if concerns later arise. [1,2]

Chapter 3 Tracing the roasted coffee to plots in Brazil

For the roasted coffee R due to be released for free circulation in Germany in January 2027, A’s production records give the numbers of the two lots bought from Brazil and the roasting date. B must trace those lots back to plot P and plot Q, where the green coffee beans were grown. Article 2 of the EUDR distinguishes between the “country of origin” in point (23), determined under the Union Customs Code, and the “country of production” in point (24), where the relevant commodity was produced. The green beans used in R were grown and harvested on two plots in Brazil. Brazil is therefore the country of production B must identify under Article 9. Roasting in Japan changed the coffee’s flavor and aroma, and the beans were shipped from a Japanese port. Neither fact changes where the beans were grown. B bought finished roasted coffee, but the purchase record and the address of A’s plant alone cannot establish which land supplied the raw material. [1,2]

A farm’s name or the identity of its owner or operator does not necessarily define a production plot. Under point (27) of Article 2, a plot is land within a single real estate property recognized by the laws of the country of production, with conditions sufficiently uniform for the risks associated with the commodities produced there, including deforestation, to be assessed across the plot as a whole. In this case, plot P covers three hectares and plot Q covers six. Under point (28), P may be identified by a single point inside the plot, giving its latitude and longitude to at least six decimal places. A polygon tracing the boundary is also permissible. Q exceeds four hectares, so its boundary must be shown as a polygon using enough latitude and longitude points to describe its perimeter. The single point in Q’s records identifies the collection depot where the beans were delivered. It says nothing about the perimeter of the land on which they grew. Moving the point to the center of the farm and drawing a circle with an area of six hectares would leave the same gap. [1,2]

A therefore asks the business that collects the beans from the growers for evidence of the boundaries of the land that Q’s grower actually cultivated and records showing that coffee harvested there went into the lot delivered. It checks the grower’s name, plot number, date of delivery and quantity on the collection slip against the harvest ledger and the warehouse records of receipts and dispatches. Article 9(1)(d) requires the date or time range of production. For coffee, that means linking the date or period when the green beans were harvested to the plot on which they grew. Where the nature of production makes greater precision unavailable, the Commission’s FAQs allow the harvest year or harvest season to be used. A delivery note may give the roasting date without establishing when the beans from Q were harvested. The geolocation of the plots must also appear in the DDS. B must be able to provide the supporting evidence, including the harvest period, if the competent authorities request it. [1,2]

Once it has identified the plots, B can examine the history of land use within their boundaries. For coffee, the question is whether the beans were produced on land converted from forest to agricultural use after December 31, 2020. Under the EUDR, forest means land covering more than 0.5 hectares with trees taller than five meters and a canopy cover of more than 10%, or trees capable of reaching those thresholds on the site. Land used predominantly for agricultural or urban purposes is excluded. If forest was converted to a coffee farm after the cutoff date, the beans grown there do not qualify, even if the conversion was locally permitted. Conversely, where coffee has long been grown under a canopy of shade trees, dense tree cover in a satellite image does not by itself establish that the predominant use of the land at the time was forest. The definition excludes agricultural plantations. B should compare dated historical imagery with farm maps, cultivation records and photographs from the site to establish how the land was used and from when. The separate forest degradation test governing timber harvesting cannot simply be applied to coffee. [1,6]

Even after B can explain the land-use history, Article 3(b) still requires the beans to have been produced lawfully on that land. Suppose the grower on plot Q produces a record from Brazil’s Rural Environmental Registry (Cadastro Ambiental Rural, or CAR). Article 29 of Brazilian Law No. 12,651 establishes the registry to bring together environmental information on rural properties. Paragraph 2 of that article expressly provides that registration does not constitute a title recognizing rights of ownership or possession. If the plot is leased, B checks whether the lease permitted cultivation on plot Q and was in force when the beans were harvested. It must also take account of environmental rules applicable in the area, third-party land-use rights and the rights of Indigenous peoples as they relate to the plot. Where local law does not require a title deed for the transaction, B need not insist on one. Its records should show which rights and rules it examined and what the evidence established in each case. [1,6,9]

Chapter 4 Which bags can A ship after blending?

As of November 8, 2026, the European Commission classifies Brazil as a standard-risk country and Japan as a low-risk country. The classification measures, at the level of a country or region, the risk that relevant commodities fail to meet the deforestation-free condition. It makes no finding about compliance on any individual farm. Brazil’s standard-risk status does not in itself bar trade in beans from P or Q, but B must collect the information required by Article 9 and carry out a risk assessment for the particular lot under Article 10. Unless B finds no or only a negligible risk, it must take mitigation measures under Article 11 until the risk falls to that level. Even if B has dealt with the Japanese roasting plant for years, it cannot simplify the procedure by naming Japan, where the beans were roasted, as the country of production while the location of Q remains unknown. [1,10,11]

The distinction also matters if B switches to sourcing from a low-risk country. To use simplified due diligence under Article 13(1), B must assess the complexity of the supply chain and the risks of circumvention or of mixing with products of unknown origin or from standard-risk or high-risk countries. Once it has ascertained that all the relevant commodities were produced in countries or parts of countries classified as low risk, it may dispense with the procedures under Articles 10 and 11. The Article 9 information requirements still apply, and an importer such as B must still submit a due diligence statement. If the competent authority asks, B must provide documentation showing that the risk of circumvention or mixing is negligible. If B learns of information suggesting a risk of non-compliance or circumvention, including through its own assessment, Article 13(2) requires it to comply with both Articles 10 and 11 in full and immediately notify the competent authority of the relevant information. If beans purchased in a low-risk country have been mixed with Brazilian beans, the premise that the entire lot was produced in a low-risk area fails at the outset. [1,6,10]

If P and Q are both known sources, may A use their beans in a single roasted product? If B verifies the location and harvest period of both plots and can substantiate that all the beans were legally produced and deforestation-free, with no material of unknown origin mixed in, it need not separate the roasted beans and identify the plot where each bean grew. B’s statement must identify both plots. The numbers on the incoming sacks should be linked to the roasting and blending records, which should identify the bags of finished coffee to be shipped to B. Roasting itself changes the weight of the beans. Production records that reconcile quantities received, quantities put into the roaster, roasted output and remaining stock help distinguish ordinary processing losses from discrepancies that warrant investigating whether other beans entered the blend. [1,2]

For Q, only the collection point has been identified. This does not establish that deforestation occurred on Q. It does, however, prevent B from filing a statement for R made with beans from Q until it has the information required by Article 9. Even if A deducts the verified quantity from P in its accounts and ships an equivalent quantity of the blend as coffee made exclusively with beans from P, any of the bags selected could still contain beans from Q. This is the problem with the form of mass balance that the Commission rejects in its FAQ. Once products of unknown origin or non-compliant products have been physically mixed in, a quantity allocated on paper cannot establish how much may be sold as compliant. If evidence of the right to use Q and records of its boundaries arrive later, B can reassess the existing blend after verifying what the documents show and whether they relate to that lot. If Q is found to be non-compliant and its beans can no longer be identified and separated, the entire lot is barred from the EU market. [1,2]

A’s warehouse still holds green beans from P that were kept apart before the beans from Q arrived. A could roast those beans in a separate production run using only stock from P. Relabeling bags from the existing blend would achieve nothing. A should identify the sacks kept apart, document their stock movements and check that no beans left in the equipment from an earlier run have entered the new lot. If B can match P’s documentation to this run, reach the conclusion required by the Regulation and submit its statement, the new lot can be treated separately under the EUDR. Whether it may be delivered in place of the original two-source blend depends on the product specifications, the labeling and B’s agreement. The decision on what to hold pending receipt of Q’s records need not apply to the whole company or even to every bag with the same product code. The quantity A can offer B depends on how much of the documented stock from P it actually kept separate. [1,2]

Chapter 5 The evidence required before shipment

Suppose B’s procurement officer proposes a clause under which the seller warrants full compliance with the EUDR. B files the statement and remains answerable to the authorities even if A accepts the clause. For A, however, an unconditional warranty could support a claim that it had assumed liability for losses arising from non-compliance, extending its undertaking beyond obtaining information from the farms. The regulatory duties owed by B and the promises made by A to its buyer have different legal foundations. Before signing, the parties should read the clause closely enough to identify what A warrants and what each party has agreed to do by a specified date. [1,5]

Japan and Germany are both Contracting States to the United Nations Convention on Contracts for the International Sale of Goods (CISG), also known as the Vienna Sales Convention. The Convention generally governs a commercial sale such as this one, where the parties have their places of business in different Contracting States, unless they exclude its application. Where the seller must hand over documents relating to the goods, Article 34 leaves the time, place and manner of delivery to the contract. Article 35(1) requires the seller to deliver goods that meet the contract requirements as to quantity, quality, description and packaging. A specification that identifies the beans’ origin and degree of roast still leaves both parties without an answer as to when the records needed for customs clearance are due. [5,12]

The extent to which public-law standards in the buyer’s country enter into the seller’s contractual obligations has long been disputed in international sales. On March 8, 1995, the German Federal Court of Justice considered a German importer’s purchase of New Zealand mussels from a Swiss seller. The importer relied, among other things, on German guideline levels for cadmium. The court rejected the buyer’s argument that the seller was necessarily bound to meet the standards in the buyer’s country. Knowledge that Germany was the market for the goods was insufficient on its own. The court left open whether the result might differ if, for example, the seller had a branch there or the parties had a long-standing business relationship. The cadmium guidance differed in legal force from the deforestation requirements at issue here, and the circumstances of the sales differ as well. B can expressly identify Germany as the country of import and specify both the evidence it needs and the deadlines for providing it as terms of the sale. A record of those negotiations can later help establish what the parties agreed. [13,14,5]

The purchase order for R could, for example, have a schedule identifying the lot and the plots. A would agree to send the harvest periods, plot locations, delivery records and roasting records to B’s designated contact at least ten business days before the scheduled shipment date. B would identify any missing records within three business days of receipt. The lot would remain on hold until the boundary of Q could be verified, and a substitute would ship only once the parties had agreed in writing on the replacement coffee, its price and the delivery date. These periods are examples of contractual deadlines set to fit the ocean freight booking. Treating the buyer’s silence as confirmation that due diligence is complete or as consent to shipment invites a dispute if the cargo has to be reloaded at additional cost.

A’s supplier may treat its list of farms as confidential business information. The parties can agree on safeguards extending back to A’s own supply contract. Access could be limited to B’s reviewers, the supplier could transmit the records directly to B in encrypted form, and B could be given access to the underlying records and the right to submit them to the authorities when necessary. Lodging a map with a third party leaves the issue unresolved if B still cannot verify it. Equally, there is no reason to allow a retailer to repurpose that information for marketing. Terms specifying the purpose of access, the retention period, disclosure to the competent authorities and whom to contact if an error is found will tell the supplier who may see its records and allow B to carry out the checks for which it is responsible. [1,2]

Chapter 6 When concerns arise after customs clearance

Suppose the records of Q’s boundaries arrive before loading, B completes its additional checks and concludes that it can import the original blend. What must B provide to customs to obtain release for free circulation in January 2027? Once B has completed due diligence on the lot and concluded that there is no or only a negligible risk of non-compliance, it submits its DDS through the Information System. It checks that the product description, net weight, country of production and plots in the statement correspond to the coffee actually being imported. Article 26(4) requires the reference number of the relevant DDS to be provided to customs before release for free circulation. If B uses a customs broker, it should specify which number to use for each declaration. Even if an earlier statement names the same product, it cannot be used to clear a consignment outside the plots or quantities it covers. [1,6,2]

Release for free circulation does not settle questions beyond the import procedure. Article 26(2) assigns responsibility for assessing substantive compliance with the EUDR to the Member States’ competent authorities. Article 26(3) assigns checks on customs declarations to customs authorities. The procedures by which the authorities exchange information and suspend release of a consignment change when the electronic interface linking national customs systems to the EU Information System becomes operational. As Article 26(10) expressly provides, release for free circulation is no proof of compliance with EU law, including the EUDR. Alongside the record of release, B must retain the evidence for its conclusion that it could deal in beans from those farms. DDS records must be kept for five years from the date of submission to the Information System. The period for which a wholesaler must keep information on its trading partners runs from a different date. [1]

Suppose that after B supplies the roasted coffee to C in Germany, B receives dated satellite images and coordinates suggesting that forest on plot Q in Brazil may have been converted to agricultural use after December 31, 2020. It may take a comparison of plot boundaries, image dates and the origin of the beans to establish whether there was a breach. Once B has relevant new information indicating a risk that the lot is non-compliant, however, its duty to notify under Article 4(5) arises. B must immediately inform the competent authority in Germany, where it placed the product on the market, and C, to which it supplied the coffee. The duty applies whether or not a third party has submitted a substantiated concern to the authority under Article 31. B can ask A to check the original images against the farm records, but it cannot defer notification until A’s answers are in. If C has already delivered the coffee to D, receipt of B’s notice triggers C’s own duty under Article 5(5) to immediately inform both the competent authority in the Member State where it made the coffee available and D. [1,2]

For bags from the same lot still in C’s warehouse, the question concerns a future supply. If C, a non-SME trader, learns before sale of relevant information indicating that the product is non-compliant, Article 5(6) requires it to inform the competent authority in the intended Member State of sale immediately. If there is a substantiated concern based on objective and verifiable information that could warrant intervention by the authorities, C must also verify that B exercised due diligence and found no or only a negligible risk. It cannot make the coffee available on the market until its verification demonstrates no or only a negligible risk of non-compliance. Substituting the coordinates of P for those of Q would do nothing to resolve the concern. C should establish which stock contains the blend from the two plots and reconcile its intake records with the destinations of previous deliveries and the bags it still holds. The results determine which stock it can release for sale. [1,2]

Where there is reason to suspect non-compliance, the authorities may take interim measures, including seizing the goods or suspending supply. If they establish non-compliance, they must require proportionate corrective action suited to the case and set a reasonable deadline for it. This can include rectifying defects in the documentation, preventing distribution, withdrawing the goods from the market or recalling them from purchasers (Articles 23 and 24). Penalties are a separate matter. Under Article 25, Member States must set the statutory maximum fine for a legal person at no less than 4% of its total EU-wide turnover in the financial year preceding the decision to impose the fine. They must raise that maximum if necessary to exceed the potential economic benefit of the infringement. The provision does not impose a flat fine of 4% of turnover for each infringement. In Germany, the government bill defining the competent authorities’ powers and domestic penalties received its first reading in the Bundestag on October 8, 2026, and was referred to the responsible committee. As of November 8, 2026, the penalties in that bill cannot be treated as enacted German law when calculating potential liability in this case. After the analysis date, the Bundestag passed the bill in its committee-amended form on November 12, 2026. The applicable penalty depends on the final text, promulgation and commencement of the German legislation, as well as the facts of the infringement. [1,15,16]

Chapter 7 How much of the 600-bag order can A fill?

Consider the November meeting at which A reviews B’s order. A’s production records show that this batch of roasted coffee R used 120 kilograms of green beans from plot P and 80 kilograms from plot Q. Roasting yielded a net weight of 164 kilograms, which A packed in 656 bags of 250 grams each. B wants 600 of those bags, with a net weight of 150 kilograms. The production records explain the difference between the weight of the beans that went into the roaster and the weight of the finished coffee. But the fact that P accounted for 60% of the beans does not allow A to select 360 bags, or 60% of the order, and describe them as coffee from P alone. Once A blended the beans before packing, any bag could contain beans from Q. Reconciling the quantities is one task. Establishing that the bags contain no beans of unknown origin requires different records. [1,2]

The delivery date A can promise B depends on what it can establish next. A may still be able to fill the order with the original blend if it obtains boundary data from the farmer at Q, matches the collection slip to the plot and verifies the harvest period and the history of land use, and gives B enough information to complete its assessment, including the legality of production. If the evidence is still unavailable by the deadline, A should take the original batch out of the stock allocated for the EU. Before proposing a replacement made with green beans from P that were kept separate, A should ask its production team how many bags the remaining beans will actually yield and when they can be ready. Even if A can produce all 600 bags, replacing a two-plot blend with beans from a single plot changes the flavor B chose and the description under which it will sell the coffee. The substitution requires B’s agreement, a record of that agreement, and a new production lot number. [1,5]

Once the parties have a binding sales contract, an expected delay does not put A back in the position it occupied before accepting the order. Suppose B has committed to a launch date and A knew the schedule. As soon as A learns of the delay, it should tell B what quantity it cannot deliver on time, how much it can send in a separate shipment, and whether it can deliver soluble coffee S first. If damages are disputed, Article 74 of the CISG limits recovery for loss caused by the breach to what the party in breach foresaw or ought to have foreseen as a possible consequence when the contract was concluded. Article 77 calls for reasonable measures to mitigate the loss. A party claiming expedited freight or storage costs should be able to show what alternatives were available, when they became available, and why the expense was necessary. A lack of response from the farmer at Q does not, on its own, establish the conditions for exemption from liability for damages under Article 79. [5]

For its internal review, B could select a single bag that has cleared customs and see whether its lot number leads back to the statement and the underlying records for the plots. As a large enterprise, B must appoint a compliance officer at management level and maintain an independent audit function to check its internal policies, controls, and procedures under Article 11(2) of the EUDR. Article 12 requires B to review its due diligence system at least annually, update it when it learns of new developments that could affect it, and keep a record of updates for five years. Operators such as B must also report publicly each year, including online, on their due diligence systems and the measures they have taken. The public report need not give the coordinates of every farm. A public account of the assessment serves a different purpose from the underlying evidence B must be able to produce for the authorities on a particular shipment. [1]

A’s November response to B should address roasted coffee R and soluble coffee S separately. A will hold the original batch of R until it can identify plot Q and B has completed its checks. A new batch made only from P is conditional on B agreeing to change the specification. A will supply S according to its tariff classification in January 2027 and with the documents separately agreed for that sale. On those terms, B can tell its German wholesale customer which product it can deliver, how many bags, and when. Whether A can fill the order ultimately depends on whether it can connect the facts established on the ground in Brazil with both the bags packed in Japan and the commitments made in Germany.

Frequently Asked Questions

Q1 Does arrival in an EU port on December 29, 2026 bring the shipment under the earlier rules?

Arrival in port is not decisive. While roasted coffee R is in customs warehousing, B has not yet placed it on the EU market for sale. If release for free circulation is scheduled for January 2027, B should prepare for an import after the rules begin to apply. If B takes the position that a lot had already been released for free circulation and first supplied on the EU market on December 29, it should be able to match the customs records to the goods in that lot. [1,6,2]

Q2 What if A roasts green beans that it bought several years ago and has kept in Japan?

Establish when the beans were harvested. Coffee produced before the EUDR entered into force on June 29, 2023, may fall within the exclusion in Article 1(2). For a processed product, the relevant date is the production date of the commodity used to make it. An old purchase slip alone cannot establish whether beans from a later harvest have since been mixed into the same bag. Link the lot for which the exclusion is claimed to the evidence of its harvest date or period. [1,6,2]

Q3 Is a due diligence statement required for coffee beans sent to B free of charge for a tasting?

Under the 2026 amendment to Annex I, samples of negligible value and quantity are excluded if their presentation and quantity rule out any use other than seeking orders for goods of the kind they represent. Giving the coffee away does not, by itself, meet that test. Sending numerous standard retail bags for a shop to distribute to the public is quite different from presenting a buyer with enough coffee for one tasting. Record the form, quantity, and intended use of the samples and assess them against the conditions in the amended Annex. [4,1]

Q4 Does a coffee drink sold in single-serve sticks have the same application date as soluble coffee?

Packaging alone does not determine the answer. In this example, S is made by extracting and drying coffee alone and is classified under CN code 2101 11 00. For a different product containing sugar or milk ingredients, check its formulation and production process, then determine whether its tariff classification matches an entry in Annex I. Where the classification is open to question, an EU customs authority can issue a binding tariff information (BTI) decision. That decision settles the tariff classification of the goods. If the product falls within the EUDR, the compliance of the plots of production is a separate matter. [4,8,17]

Q5 If the actual source is unknown, is it enough to list all the grower’s land?

Listing all the land a grower owns cannot establish origin where there is no link from the coffee to any plot. The European Commission’s FAQ allows a limited declaration of additional plots where bulk commodities verified as compliant have been mixed, only part of the mixture is placed on the market, and the plots from which it could have come can be identified. The operator must assess every plot it declares and establish that no material of unknown origin or non-compliant material has been mixed in. The additional plots are subject to the same assessment. A finding of non-compliance on even one of them affects the declaration as a whole. In this case, even the boundary of Q is unknown, so the conditions for using this approach are absent. [1,2]

Q6 If the coffee is certified, can the buyer dispense with checking the farm records?

Certification materials can provide evidence for the risk assessment if B checks what the certification covers, what the audit examined, and whether the plots and period covered correspond to those in this shipment. The certifier and B may have different questions to answer. A certification that examines a farm’s growing practices, for example, cannot by itself establish that A kept the farm’s beans separate from other beans in its warehouse. B must be able to explain which evidence it ultimately relied on when it submitted the statement. [1,6,2]

Q7 Does a green area on the Commission’s forest map automatically disqualify a plot?

The Commission’s forest observation data can help establish how the land was used in 2020. The color on the map does not settle the legal status of a particular plot. If farmers were already growing coffee under a tree canopy, compare harvest records, dated imagery, and local land use records for the plot with the map to explain the discrepancy. Conversely, if specific information points to a later conversion to agricultural use, it calls for investigation even where the map gives no warning. [1,2,18]

Q8 Can a German customs broker perform due diligence on B’s behalf?

Authority to file an import declaration is distinct from authority to submit a due diligence statement under Article 6 of the EUDR. Even if B appoints the same firm for both tasks, it must define each mandate. The representative submitting the statement must be a natural person resident in the EU or a legal person with its registered office, central headquarters or a permanent business establishment in the EU, and must hold the required written mandate. B remains responsible for placing products that comply with Article 3 on the EU market even when a duly authorized representative submits the statement on B’s behalf. B must separately decide who will examine the evidence supplied by A and who will approve the risk assessment. [1,2]

Q9 A retailer wants to publish all the farm coordinates on its product page. Does the EUDR require this?

Being able to identify each plot to the authorities is a separate matter from disclosing its location to the public. Article 5 does not require retailer D to publish all the coordinates for P and Q on its product page. B’s annual public report need not list all the coordinates of every farm either. If D wishes to describe the origin of the coffee voluntarily, it should first check that the proposed disclosure is within the terms agreed with the farmers and accurately describes the source of the lot being sold. [1,2]

Q10 What if B discovers a numerical error after receiving the reference number for its statement?

Under Article 5 of the Implementing Regulation governing the Information System, a statement can generally be amended or withdrawn within 72 hours after its reference number becomes available in the Information System. Amendment and withdrawal are barred once the number has been provided or made available to customs, once the product has been placed on the EU market or exported from the EU, or once the same user has used the statement in the prescribed grouping procedure. They are also barred from the time the user is notified of an intended check until that check is complete. After the 72 hours have elapsed, the competent authority may grant an extension of up to eight calendar days on an individual request identifying circumstances beyond the user’s control and stating that none of the restrictions in Article 5(3) applies. The restrictions continue to apply during any extension. If a risk of non-compliance comes to light after the goods have been supplied, any duty to notify must be assessed separately from whether the system allows the entry to be corrected. [19,1]

Q11 If B’s own terminal fails, can it proceed with the import using a provisional number of its own?

A number assigned by B itself is not a reference number under the Regulation. Article 15a of the Implementing Regulation governing the Information System requires the Commission to publish contingency arrangements by December 30, 2026 for unplanned unavailability of the relevant EU system functions lasting more than 60 minutes. After the analysis date, the Commission announced the arrangements on November 9; the guidance applies from December 30, 2026. Official contingency numbers cover products for which the outage prevents submission of a statement or simplified declaration and assignment of the normal number. Their use requires confirmation of the qualifying outage and its duration on the designated Public Status Page. B should distinguish this from a failure of its own terminal and check the official instructions in effect that day. If due diligence on the beans is incomplete, a functioning system does not provide the missing basis for a statement. [19,20,1]

Q12 Can A secure a contractual right to postpone shipment by adding a clause to its order confirmation?

If no contract has yet been formed, the answer depends on how the reply changes the original order. Under Article 19 of the CISG, a reply that purports to accept an offer but changes the time of delivery or the extent of either party’s liability materially alters the offer. Where that reply is a counteroffer, sending it does not secure agreement to the revised terms. Under Article 18, silence or inactivity alone does not constitute acceptance. If a binding contract already exists, any amendment falls to be considered under Article 29; a unilateral addition to an order confirmation does not, on its own, change the agreed delivery date. If A identifies the lots whose shipment may be postponed, who can approve a substitute, and how the costs will be shared, and obtains an express answer from B, the parties are less likely to face a dispute over whether a contract was formed and on what terms just as delivery falls due. [5]

About the Legal Update by Kenshiro Michishita

In the SAKURA Law Office Legal Update, Managing Partner Kenshiro Michishita examines changes in the law and court decisions that affect business transactions and management decisions. This issue follows a shipment of coffee roasted in Japan and sold in Germany to show how EU environmental rules affect a Japanese company’s sourcing, production records and sales terms. Issue 43 discusses the protection of trade secrets, a question that arises here when farm locations or sourcing arrangements are disclosed to a trading partner.

Related reading | Legal Update No. 43 on protecting trade secrets and responding to technology leakage in Japan

SAKURA Law Office website | Kenshiro Michishita’s professional profile

Advice from SAKURA Law Office

The firm advises on the drafting and negotiation of international sales contracts, arrangements with suppliers for the disclosure and protection of information, and disputes over changes to raw materials or delivery dates. Read together, the product specification, purchase order, order confirmation and production records show which terms the parties need to settle and at what stage of the transaction.

Contact SAKURA Law Office

Principal Sources

The numbered citations in the text and FAQs, and the source titles below, link to the underlying materials. The EU legislation was checked against the original and amending acts in the Official Journal and the consolidated texts. The European Commission’s guidance and FAQs are cited as interpretative materials. Citations to PDFs link to the relevant pages where appropriate. The analysis date remains November 8, 2026. The relevant legislation and published materials were rechecked on November 14, 2026. Subsequent developments in the German legislative process and EUDR Information System guidance are expressly dated in the text.

01 Regulation (EU) 2023/1115 on deforestation-free products. Consolidated text of September 18, 2026. Articles 1–13, 23–26 and 38 and Annexes I and II cover scope, the roles of operators and traders, due diligence, statements, customs, corrective action and penalties.

02 European Commission, Frequently Asked Questions on the Implementation of the EU Deforestation Regulation. Fifth English edition, dated April 2026 and posted by the Directorate-General for Environment on August 21, 2026. See in particular Chapters 1, 3, 5 and 7–9 for the Commission services’ explanations of individual cases.

03 Japan’s Ministry of Agriculture, Forestry and Fisheries, Guidance on the EU Deforestation Regulation. Updated October 23, 2026. Guidance and related materials for Japanese exporters, in Japanese. The dates applicable to individual tariff lines have been checked against the Official Journal of the European Union.

04 Commission Delegated Regulation (EU) 2026/2102 amending the list of relevant commodities and relevant products. Adopted July 13, 2026, published on September 17 and in force from September 18. See recital 6 and point (6)(e) of the Annex on coffee extracts and the date the new entry applies. The Annex also addresses samples of negligible value and quantity.

05 United Nations Convention on Contracts for the International Sale of Goods (CISG). English text published by Japan’s Ministry of Foreign Affairs. Articles 1, 6, 18, 19, 29, 34, 35, 74, 77 and 79 address application, offer and acceptance, contract modification, delivery of documents, conformity, damages and exemption from liability for damages. Japanese text

06 European Commission, Guidance Document on the EU Deforestation Regulation (C/2026/3896). Published in the Official Journal on July 20, 2026. Sections 1–4, 6, 10 and 11 address placing on the market, dates of production, the laws of the country of production, third-party certification, forests and agricultural use.

07 Regulation (EU) 2025/2650 amending the EUDR as regards certain obligations of operators and traders. Adopted December 19, 2025, published on December 23 and in force from December 26. It revises the categories of economic actors and downstream obligations. Article 1(25) amends Article 38 of the EUDR.

08 Commission Implementing Regulation (EU) 2026/2163 on the Combined Nomenclature for 2027. Adopted September 17, 2026 and published on October 30. It applies from January 1, 2027 under Article 2. See Chapter 9 of the Annex for CN 0901 21 00 (PDF page 111) and Chapter 21 for CN 2101 11 00 (PDF page 185).

09 Brazil, Federal Law No. 12,651 of May 25, 2012, on the protection of native vegetation. Article 29, including paragraphs 1 and 2, sets out the purpose of the Rural Environmental Registry (CAR) and the effect of registration on claims of ownership or possession. Portuguese text published by the Brazilian Chamber of Deputies.

10 Commission Implementing Regulation (EU) 2025/1093 on country risk classifications. Adopted May 22, 2025 and published on May 23. Article 1 and the Annex list low-risk and high-risk countries. Other countries retain standard-risk status under Article 29 of the EUDR.

11 European Commission, Country Classification List. The Commission lists all risk categories by country. Brazil is classified as standard risk and Japan as low risk.

12 United Nations Treaty Collection, Status of the CISG. Chapter X, No. 10. Status of contracting states, including Germany and Japan, and details of ratifications and accessions.

13 German Federal Court of Justice, judgment of March 8, 1995 (VIII ZR 159/94). Full German judgment hosted by UNCITRAL. See PDF pages 5–7, reasons II.1.b.bb and subparagraph ccc, on public-law requirements in the destination market and the seller’s contractual obligations.

14 UNCITRAL, Case Law on UNCITRAL Texts (CLOUT), Case No. 123. Official case record identifying the court, docket number, date of judgment and provisions of the CISG considered.

15 German Bundestag, government bill on deforestation-free products. Bundestag printed paper 21/8278 of September 30, 2026. See the statement of purpose on page 1 and section 3 of the proposed implementing act on page 8. The text remained a bill on November 8, 2026. In German.

16 German Bundestag, legislative proceedings on the bill on deforestation-free products. First reading and committee referral on October 8, 2026, followed by passage of the committee-amended bill on November 12. The development after the analysis date is expressly identified in the text. Parliamentary passage is distinct from promulgation and entry into force. In German.

17 European Commission, Directorate-General for Taxation and Customs Union, European Binding Tariff Information (EBTI). Advance tariff classification decisions issued by EU customs authorities and their binding effect.

18 European Commission Joint Research Centre, EU Observatory on Deforestation and Forest Degradation. Forest cover maps for the 2020 baseline. These geospatial data can be used when assessing individual plots.

19 Commission Implementing Regulation (EU) 2024/3084 on the functioning of the EUDR Information System. Consolidated text of October 15, 2026. See Article 5 on amending and withdrawing statements, Article 8a on grouping and Article 15a on contingency arrangements.

20 European Commission, IT developments (November 9, 2026). Official announcement of the contingency guidance, which applies from December 30, 2026. See Contingency Arrangement v1.0.

Scope of This Update

This article provides general legal information with an analysis date of November 8, 2026. The relevant legislation and published materials were rechecked, and the text revised, on November 14, 2026. Material developments after the analysis date are expressly dated. The example assumes that coffee harvested in Brazil in 2026 is processed in Japan and imported by a large German company in its own name. An assessment of an actual transaction requires examination of the product’s composition and classification, the circumstances of the production plots, the relevant laws of the country of production, the identity of the importer, the customs procedure and the terms of the contract.

NextPrev