SAKURA Law Office | Legal Update by Managing Partner Kenshiro Michishita | No. 51
2026 Reporting Obligations, Secure Design, Support Responsibilities and Supply Contracts (2026 Edition)
Original analytical cut-off: 2 November 2026
Original English edition: 3 November 2026 | Verified and revised: 13 November 2026
SAKURA Law Office | Managing Partner Kenshiro Michishita
Responsibility for a product sold into Europe does not necessarily end upon delivery or acceptance. Where industrial machinery designed in Japan incorporates control software commissioned from an overseas developer and open-source components, and receives updates through a remote service, its security depends on several businesses over a lengthy support period. Manufacturing may authorise shipment and sales may promise years of service, yet the legal foundations of the transaction remain incomplete unless someone has the authority, resources and rights to investigate vulnerabilities, remedy them and deliver the necessary measures to users throughout that period.
Regulation (EU) 2024/2847, the Cyber Resilience Act (CRA), connects the design of products with digital elements to their placement on the market, vulnerability handling and information for users. The Regulation entered into force on 10 December 2024. Although its principal requirements apply from 11 December 2027, Article 14, which establishes manufacturers’ reporting obligations, has applied since 11 September 2026. Businesses therefore face more than a future exercise in preparing for CE marking. Their ability to report specified exploitation and severe incidents, including those affecting products already placed on the EU market, is an immediate compliance issue. [1][5]
It is nevertheless unsafe to reduce the CRA to isolated requirements: reports within 24 and 72 hours, a support period generally lasting at least five years, and preparation of a software bill of materials. Not every defect is reportable; five years is not a universal entitlement to discontinue support; and a bill of materials is not a requirement to publish all source code worldwide. Those requirements acquire their practical meaning only when product classification, actual use, the timing of supply, contractual arrangements and decision-making authority are considered together. [1][3]
This Legal Update examines the CRA and its corrigendum, the Commission’s draft guidance whose content was approved and published on 27 July 2026 as the annex to C(2026) 5252 final (the published draft guidance), ENISA’s operational reporting materials and related primary sources, with an original analytical cut-off of 2 November 2026. Post-cut-off information added on verification on 13 November is expressly identified. Rather than revisiting general data-breach response, it focuses on Japanese businesses acting as manufacturers, commissioning software development, supplying components or acquiring product businesses serving the EU market. Binding legislation, the non-binding published draft guidance, technical standards and this publication’s contractual recommendations are distinguished throughout. [1][2][3][4]
Executive Summary
CRA compliance requires pre-market review and the capacity to discharge post-market responsibilities to be designed together. A Japanese company does not necessarily transfer its obligations as manufacturer to an EU importer merely because it has no EU establishment and sells through that importer. The starting point is to identify the relevant hardware, software and qualifying remote data processing solutions forming part of the product, and then align the parties’ contractual roles with their legal status. A business marketing a product under its own name or trademark must assess its position as manufacturer independently of the arrangements it has made for distribution. [1][3]
The reporting obligations applicable since September 2026 distinguish actively exploited vulnerabilities contained in a product from severe incidents affecting its security. An early warning is due within 24 hours of awareness and the subsequent notification within 72 hours of that same point of awareness; the periods are not cumulative. The trigger for the final report also differs between the two categories. Expiry of support does not, by itself, remove a product from the reporting regime, making it necessary to retain information about legacy products, appropriate contact channels and authority to report. [1][3][7]
In preparation for the principal requirements applying in 2027, development and procurement contracts being negotiated now should address support reflecting expected product use, security updates generally provided free of charge, conformity assessment, technical documentation and component information. The end of a supplier’s standard maintenance offering may not coincide with the end of the finished-product manufacturer’s responsibilities to users. For long-lived products, securing the rights and personnel needed to issue updates over time may matter more than the initial development price. [1][10][13]
Management should distinguish regulatory reporting, technical remediation, user communications, contractual loss allocation and withdrawal from the market. Nor should the principal application date in 2027 be taken to mean that reporting failures cannot attract penalties in 2026: national legislation providing for sanctions for reporting infringements already applies in at least one Member State. Boards and acquisition teams must assess not only product revenues but the continuing support, reporting and remediation responsibilities associated with those revenues. [17][18][19]
1. Responsibility for Supply to the EU Market: Defining Scope and Timing
The first question is not simply whether the customer is in the EU. A CRA assessment must establish whether the subject matter is a product with digital elements, whether its intended purpose or reasonably foreseeable use includes a direct or indirect connection to another device or network, and whether it is made available on the EU market in the course of a commercial activity. The inquiry extends beyond consumer appliances to business software, industrial equipment and components placed separately on the market. An assurance that a product does not connect directly to the internet does not dispense with examining its connection through other equipment. [1; Articles 2 and 3]
Identifying the manufacturer is likewise different from identifying the owner of the factory. The CRA includes not only a person that develops or manufactures a product itself, but also one that has a product designed, developed or manufactured and markets it under its own name or trademark. A Japanese business commissioning development overseas and supplying a European sales company may be the manufacturer, while the local company acts as importer or distributor. Manufacturers, importers, distributors and authorised representatives have distinct obligations. A contractual sentence assigning EU compliance to the local party does not, by itself, change the person upon whom the law imposes responsibility. [1; Article 3 and Articles 18–22]
Conversely, a Japanese developer engaged solely to build part of another company’s branded product is not necessarily the manufacturer of the finished product. A different position may arise, however, if it supplies its own software component independently on the market, or makes changes affecting a product’s intended purpose or security and then makes the modified product available. The review should therefore follow development and distribution through the separately supplied components, displayed trademarks, control over final specifications and the identity of the supplier of the modified product, rather than stopping at the finished product’s name. The objective is to avoid gaps between the parties’ work and make the allocation of responsibility identifiable. [1][3]
For cloud-enabled products, the physical location of software on a device or server is not decisive. Remote data processing within Article 3(2) concerns processing designed and developed by the manufacturer, or under its responsibility, without which the product would be unable to perform one of its functions. Dedicated software that remotely analyses images from industrial equipment and returns operating instructions may therefore form part of the regulated product, depending on its actual design. By contrast, a general web service or software-as-a-service offering does not become a CRA product merely because it operates remotely. Dependence on an off-the-shelf third-party service should be assessed separately from remote processing for which the manufacturer is responsible. [1][3; Section 8]
The scope also contains exclusions. Specified medical devices and in vitro diagnostic medical devices, for example, are excluded in light of their treatment under sector-specific EU legislation. The fact that a customer is a factory, hospital or financial institution does not, however, exempt ordinary networking equipment or software used by that customer. Where several divisions of a Japanese group use the same component in different products, the company should record its reasoning for each combination of product and applicable legislation, rather than classify the entire business as either within or outside the CRA. [1; Article 2]
Three application dates must be kept separate: Chapter IV on conformity assessment bodies from 11 June 2026, Article 14 from 11 September 2026, and the principal requirements from 11 December 2027. Products placed on the market before 11 December 2027 are generally subject to the principal requirements only if they undergo a substantial modification from that date, but Article 14 reporting is an exception to that transitional treatment. Both the proposition that all legacy products are exempt and the converse proposition that reporting brings every design requirement into immediate retrospective application misunderstand the regime. [1; Articles 69 and 71]
Placement on the market is not synonymous with completing development of a product series or launching it in Japan. The published draft guidance addresses hardware at the level of each individual unit. For completed standalone software, it treats the first supply for distribution or use on the EU market in a commercial activity as placement: copies of the same version are treated as placed at that same time, irrespective of when each copy is subsequently acquired or used. Variants differing in components, configurations or enabled functionality must instead be assessed as distinct products. A machine model sold since 2026 does not bring a unit first placed on the EU market on or after 11 December 2027 within transitional treatment merely because the model is old. Subsequent iterations of standalone software must likewise be assessed for substantial modification; retaining the name does not establish that a supply is merely redistribution of an existing version. [3; paragraphs 13–16]
The resulting product record should connect the relevant entity, brand, configuration, date of EU supply, operating environment, remote services and contemplated modifications. It is not merely a temporary document for obtaining legal advice. It provides the basis for determining which products and users are affected when vulnerability information arrives. Where sales records, engineering configuration management and support agreements use different names for the same product, establishing a common method of identification is as important as the legal scope analysis itself.
2. Making the 24- and 72-Hour Reporting Periods Work:
Awareness, Recipients and Users
Reporting is not triggered by the discovery of every weakness in a product. Article 14(1) concerns an actively exploited vulnerability contained in a product, whereas Article 14(3) concerns a severe incident having an impact on the product’s security. The latter category includes incidents negatively affecting, or capable of negatively affecting, the product’s ability to protect the availability, authenticity, integrity or confidentiality of important or sensitive data or functions, and incidents leading or capable of leading to the introduction or execution of malicious code in the product or a user’s systems. Rather than treating every internal IT outage as a CRA report, a business must establish the connection with the relevant product and the statutory severity criteria. [1; Article 3(42) and Article 14(1), (3) and (5)]
Vulnerability information concerning external components makes that determination more difficult. A published vulnerability identifier may match an entry in the company’s bill of materials, yet the affected code may be unreachable in its implementation or exploitation in its own product may not have been established. Those circumstances do not necessarily trigger mandatory reporting under Article 14(1), as the Commission expressly explains in paragraph 218 of the published draft guidance. A decision that reporting criteria are not met is not, however, a decision to ignore the vulnerability. The company should separately assess whether a severe incident has occurred, any applicable vulnerability-handling requirements, customer commitments and the actual risk, retaining the reasons for its conclusion. [3][7]
Awareness cannot be substituted with the date on which the board approves a submission or investigators complete their report. The published draft guidance calls for an immediate initial assessment of suspicious events or third-party information and addresses the point at which there is a reasonable degree of certainty regarding exploitation within the product or a severe incident. The framework contemplates an initial report followed by supplementation even where not all users have been identified or parts of the cause remain unclear. Delaying internal approval cannot defer the statutory starting point; equally, the company need not present unverified information as established fact. [3; paragraphs 213–215]
For an actively exploited vulnerability, the early warning must be given without undue delay and in any event within 24 hours of awareness, followed by the prescribed notification without undue delay and within 72 hours of that same awareness. The final report is due no later than 14 days after a corrective or mitigating measure becomes available. For a severe incident, the 24- and 72-hour periods also run from awareness, but the final report is due within one month after submission of the 72-hour notification. The provisions address information already supplied, but the company should not restart the 72-hour period at the early warning, equate one month automatically with 30 days, or measure every final-report deadline from completion of the investigation. Availability of a mitigating measure can start the final-report period for a vulnerability even before a permanent fix is complete. [1; Article 14(2) and (4)]
ENISA launched the Single Reporting Platform (SRP) on 11 September 2026. Manufacturers use that common channel to notify ENISA and the CSIRT designated as coordinator selected under the statutory criteria. A manufacturer without a main establishment in the EU is not left without a reporting destination. Article 14(7) identifies the relevant Member State, in sequence, by reference to the authorised representative acting for the highest number of that manufacturer’s products, failing that the importer placing the highest number on the market, then the distributor making the highest number available, and, in the absence of those routes, the largest number of users. The choice is not made for convenience by reference to sales revenue or the location of legal advisers. [1][5][7]
Operational preparation should address the reporting person’s EU Login, authentication, association with the manufacturer and backup arrangements. An Assigned Representative within the SRP is an operational role, not an authorised representative as legally defined by the CRA. ENISA’s FAQ marked updated 15 October 2026 discusses organisational verification, alternate personnel and displayed deadlines. Internal deadline control should use the time of awareness rather than treat the on-screen counter as the legal rule. As a post-cut-off update, verification on 13 November confirmed ENISA’s announcement that the SRP was upgraded to version 1.3 on 4 November and that its operating documentation was being updated. Earlier descriptions of screens and functions should not be assumed unchanged; the edition applicable when submitting must be checked. [6][7]
Within the organisation, engineering should establish affected versions and attack paths while legal teams distinguish report categories and the explanations required for authorities and users, with an authorised person able to submit on time. The process should anticipate weekends and time-zone differences, separating authority for the initial report from approval of later supplementary information. If the SRP is unavailable, the company should record the interruption, consider direct contact with the relevant CSIRT where immediate communication is necessary, and complete the required SRP submission once service is restored. This is an operational response following ENISA’s guidance, not an exemption from the obligation because a platform outage occurred. [7]
Concern that reporting could disseminate an attack method is not a right not to report. Commission Delegated Regulation (EU) 2026/881 specifies conditions under which the receiving CSIRT may delay further dissemination for exceptional cybersecurity-related reasons. Delay to other relevant CSIRTs must be distinguished from exceptional restriction of ENISA’s access: the latter concerns the 72-hour actively exploited vulnerability notification in the particularly exceptional circumstances specified in the third subparagraph of Article 16(2), not an unrestricted power to withhold all notifications. Neither mechanism lets a manufacturer postpone its initial report at its discretion to avoid reputational harm. Reporting materials should distinguish unremediated issues, information enabling reproduction of an attack and measures already provided to users, explaining why particular information requires protection. [1; Article 16(2)][8]
Communicating with users is likewise not the same as publishing the entire regulatory submission. Article 14(8) requires affected users and, where appropriate, all users to be informed of the event and the necessary measures. Customers operating sensitive equipment may need targeted, secure communications and mitigation instructions they can actually implement. The company should determine the scope and timing needed to reduce risk, avoiding both indiscriminate disclosure that facilitates attacks and suppression of necessary user communications to protect its reputation. [1][3; paragraphs 219–221]
Legacy products remain relevant. The Commission explains that Article 14 reporting continues after the support period has expired. That does not, merely because reporting remains required, create indefinite new vulnerability-handling obligations under Part II of Annex I for products benefiting from transitional treatment or products whose support has lawfully ended. Nor must manufacturers retrospectively report every actively exploited vulnerability of which they were already aware before 11 September 2026. The position differs where the underlying weakness was previously known but the manufacturer first becomes aware of active exploitation after reporting begins to apply. End of sale, end of support and reportability should therefore be managed separately. [3; paragraphs 210 and 217][7]
3. Secure Design as a Condition of Market Access:
Conformity Assessment and Evidence
Preparation for the principal requirements applying from 11 December 2027 should centre on records showing how product risks inform design and support, rather than merely a test certificate obtained before shipment. Article 13 and Annex I require a cybersecurity risk assessment reflecting intended purpose, reasonably foreseeable use and the operating environment, with corresponding measures. The same communications feature may have materially different consequences and require different safeguards in a domestic device and equipment controlling a production line. A low price or small sales volume alone does not justify omitting the assessment. [1][13]
The CRA is not a guarantee that a product contains no weakness that may ever be discovered. Part I of Annex I sets out requirements applicable on the basis of the risk assessment, including making products available without known exploitable vulnerabilities, secure default configurations, appropriate access control, data protection and reduction of attack surfaces. A vulnerability’s appearance in a list is not identical to its exploitability under the product’s actual operating conditions. A conclusion that it is not relevant must nevertheless be supported by evidence of the configuration, reachability, settings or mitigation. Describing security solely by the number of findings in a diagnostic report leaves a gap between the technical assessment and the legal requirements. [1; Annex I]
Secure updating is not complete merely because an update mechanism has been engineered. The manufacturer should consider authenticity verification, recovery after a failed installation, compatibility with user-configured operating conditions, and appropriate notice and choices for users. Although the CRA addresses automatic updates where appropriate, invoking it to impose unconditional immediate installation on equipment that cannot tolerate extended interruption may create separate safety and contractual problems. Design should distinguish distribution, validation, application by users and emergency mitigation, with the respective responsibilities reflected in user terms and support agreements. [1][13]
The conformity assessment route depends on legal product classification. Internal production control is available as a self-assessment route for products in the default category, whereas Annex III divides important products into Class I and Class II and Annex IV identifies critical products. Classification turns on whether the product itself has the core functionality of a listed category. Incorporating an important component does not automatically place the entire finished product in the same category. The technical descriptions in Commission Implementing Regulation (EU) 2025/2392 should be compared with the product’s actual specifications. [1; Articles 7, 8 and 32][9]
For Class I products, the availability of self-assessment depends on the use of relevant harmonised standards, common specifications or qualifying certification. Class II and other higher-risk categories generally require a notified conformity assessment body or a certification route permitted by the legislation. Article 32(5) also provides a special route for free and open-source software within Annex III, conditional on making the Article 31 technical documentation publicly available at the time of placement on the market. Later publication does not automatically satisfy that condition. Neither a budget assuming universal third-party certification nor a plan assuming that all software permits self-declaration is accurate. The available route should be settled before selecting an assessment body or scheduling tests. [1][10]
Sector-specific interfaces also matter. For electronic health record (EHR) systems, Article 104 of Regulation (EU) 2025/327 on the European Health Data Space amends the CRA’s risk-assessment, technical-documentation and conformity-assessment provisions. Article 105 gives 26 March 2027 as the general application date, but EHR-related requirements are further phased. This article’s general product classification must not be treated as settling the assessment route or application date for an individual EHR system. [20; Articles 104 and 105]
Progress in standardisation must also be distinguished from evidence of legal conformity. Publication of a draft and commencement of its approval process by a European standardisation body do not mean that using it alone creates a presumption of CRA conformity. The Article 27 presumption requires consideration of the relevant harmonised standards or other qualifying instruments, publication of references in the Official Journal where required, and the requirements they cover. ETSI’s announcement of 13 August 2026 described 17 product-specific draft standards in the approval process. Planned delivery, adoption as a standard, publication of an Official Journal reference and the scope of a resulting presumption are separate facts that should be tracked separately. [1][11][12]
Testing undertaken in Japan and participation in a domestic scheme such as JC-STAR can provide a useful foundation for product governance. They do not, by themselves, discharge every CRA obligation concerning conformity assessment, an EU declaration of conformity, reporting or support. Businesses should distinguish evidence that can be reused from matters requiring additional EU-specific review. A list of certification marks or labels is less persuasive than an explanation of which product, version and requirement each item of evidence actually supports. [10][16]
Article 13(13) requires technical documentation and the EU declaration of conformity to be retained for the authorities for at least ten years after placement on the market or for the support period, whichever is longer. The assessed configuration, test conditions, reasoning and change history must remain reproducible after designers leave or development environments change. CE marking is not a government assurance of the security of every individual function: it is part of the framework through which the manufacturer demonstrates conformity with applicable legislation. Signing the declaration should therefore be a decision supported by technical records and proper authority, not routine processing of a shipping document. [1][10]
4. Determining the End of Support: Duration and Post-Sale Costs
The CRA’s effect on a product business cannot be measured solely by increased development costs. Under the principal requirements applying from 2027, manufacturers determine a period during which vulnerabilities will be handled effectively, taking account of how long the product is expected to be used and other relevant factors. Article 13(8) generally requires at least five years, with a shorter period corresponding to expected use where that is less than five years. The five-year minimum must not be recast as a maximum that can always be chosen for long-lived equipment. The determination needs to reflect the product’s nature, users’ reasonable expectations, its intended purpose and relevant component considerations. [1][3; Section 5]
For example, supplying equipment intended for long-term operation in the EU while planning to discontinue support for its control platform much earlier may produce a mismatch between expected use and the support arrangements. A component vendor’s end-of-support date does not automatically become a permissible date for the finished-product manufacturer. Migration to replacement components, rights to update software, continuing maintenance, redesign and revised sales conditions should be considered before contracting. Avoiding a configuration that cannot be supported for the necessary period may prevent greater losses than attempting later to transfer the supplier’s limitations to users.
Article 13(19) requires the end of the support period, including at least the month and year, to be stated clearly and understandably at the time of purchase. Combining regulatory support, a repair warranty, paid maintenance and additional functionality under one description can leave both users and sales personnel unclear about what will end. Distributor inventory periods, delivery lead times and actual placement on the market should be considered when checking that the disclosed end date reflects the position. Under long-term supply agreements, additional units and different versions should not simply inherit a single date from the original catalogue without verification. [1][13]
The duty to keep updates available operates on a different timeline from the support period itself. Article 13(9) requires each security update issued during that period to remain available for at least ten years after issue or for the remainder of the support period, whichever is longer. That is not a uniform obligation to develop new fixes for every product for ten years. Equally, ending support does not justify immediately deleting previously issued update files, the distribution functionality necessary to obtain them or the associated instructions. Companies that approve product discontinuation and decommissioning of the distribution infrastructure in one decision should separate those questions. [1]
Cost allocation must take account of the general requirement in point (8) of Part II of Annex I to provide security updates free of charge. The exception expressly stated in that point concerns a different agreement between the manufacturer and a business user in relation to a tailor-made product. Neither a business-to-business relationship nor a general paid-maintenance clause establishes that every update cost may be charged to the user. Conversely, fees for new functionality, individual implementation assistance or on-site work need not automatically be equated with the security update itself. Deliverables and services should be distinguished without relabelling a statutory obligation as an optional paid service. [1]
Consolidating users onto a new release does not invariably permit support for earlier versions to end. Article 13(10) applies where a manufacturer has placed subsequent substantially modified versions of a software product on the market. It permits compliance only for the version last placed on the market with the particular requirement to address and remediate vulnerabilities in point (2) of Part II of Annex I. Users of earlier versions must have access to that latest version free of charge and incur no additional costs in adjusting the hardware and software environment used for the original version. This does not waive vulnerability-handling requirements as a whole: other handling requirements and Article 14 reporting remain separately relevant. Making the new licence free while requiring users to buy replacement equipment calls for careful scrutiny of those conditions. Contractual compatibility, preservation of functionality and migration work remain separate matters for negotiation. [1; Article 13(10) and Annex I, Part II, point (2)][3; paragraph 131]
Product changes require a distinction between an update correcting a vulnerability and a substantial modification affecting intended purpose or compliance with essential cybersecurity requirements. It is as inappropriate to treat every modification automatically as a new product as to assume that retaining the name always makes the previous conformity assessment sufficient. Technical records should establish which changes alter the assessment’s premises and which preserve the product’s existing security. The support period after modification likewise requires analysis of the legislation and the published draft guidance in light of the nature of the change and reassessed expected use, rather than mechanically adding five years in every case. [1; Article 3(30)][3]
These responsibilities become deliverable only when reflected in pricing and staffing. A discontinued product generating no new revenue may still require the company to receive information, identify affected units and make necessary reports. Management reporting should therefore address the remaining supported installed base, variation in configurations, upstream end-of-support dates and migration costs, not sales volumes alone. CRA-aligned post-market management cannot be completed merely by legal counsel adding a clause to the maintenance agreement. It requires a commercial decision to secure the resources and authority needed for future performance.
5. Open Source and Outsourcing:
Turning Component Information into Contractual Rights
Open-source software (OSS) cannot be classified by assuming either that no charge means no regulation or that corporate involvement invariably creates an ordinary manufacturer. The CRA generally excludes free and open-source software supplied outside commercial activity, while distinguishing a manufacturer commercially making a product available from an open-source software steward, a legal person providing specified sustained development support. An individual contributor, an entity sustaining a community, a business selling a commercial edition and a finished-product manufacturer incorporating OSS occupy different roles requiring separate assessment. [1; Articles 2, 3 and 24][14]
Commercial character is not determined solely by price. Supply monetised in another way differs from optional paid training or consultancy accompanying freely obtainable software. The Commission’s explanation assesses roles in light of development decision-making, sustained support and the actual manner of supply. Article 24 does not simply impose the ordinary manufacturer’s regime unchanged on open-source software stewards, and its reporting requirements apply from 11 December 2027. That date must not be confused with the September 2026 application of Article 14 in order to impose identical current duties on everyone involved in OSS. [3][7][14]
For a finished-product manufacturer, exclusion of upstream OSS from the regime does not necessarily reduce its own obligations. Article 13(5) and (6), applying from 2027, address due diligence when integrating third-party components and upstream notification, remediation and necessary information-sharing concerning vulnerabilities in incorporated components. A company cannot assume that a component licensed without charge and subject to disclaimers will necessarily receive future fixes free of charge. It should compare its own remediation capacity, paid support arrangements and component substitutability, rather than make performance of its legal obligations depend entirely on external goodwill. [1][3; Section 9.2]
A software bill of materials (SBOM) supports that assessment. Point (1) of Part II of Annex I requires identification and documentation of vulnerabilities and components within the product, including an SBOM in a commonly used, machine-readable format covering at least top-level dependencies. Receiving a file once does not establish that it corresponds to the products actually being sold. Product versions, component versions, modifications and update histories should be linked so that a vulnerability disclosure can be traced to the products in which the relevant component is actually deployed. [1]
The Canadian Centre for Cyber Security’s announcement of the international joint 2026 SBOM minimum-elements guidance describes baseline data fields, practices and processes intended to help organisations understand software supply chains and vulnerabilities. Those recommendations should not be recast as the CRA’s statutory minimum. As a matter of implementation, an unknown component should not be presented as an absent component. Businesses should distinguish the legally required foundation from additional information justified by product risk, documenting gaps and alternative verification methods. [15]
Preparing an SBOM does not create a general requirement to disclose all source code to every user. Disclosure to authorities under the CRA, information customers require by contract and disclosure under an OSS licence have different legal bases and subject matter. Development agreements should secure both access to necessary component and vulnerability-handling information and the ability to disclose it, to the necessary extent, to EU authorities, assessment bodies or customers with legitimate requirements. The drafting should avoid both confidentiality provisions so broad that required regulatory explanations become impossible and unrestricted leakage of technical information beyond what is necessary. [1][15]
Notification provisions need internal and upstream channels that operate within a shorter period than the finished-product manufacturer has available. If a supplier need notify only after establishing the complete root cause, information may arrive too late for the manufacturer to assess and report within 24 hours. The parties should allocate initial communications containing appropriately identified uncertainties, identification of affected products and versions, preservation of evidence, interim mitigation, provision of fixes and cooperation with further investigation. The supplier may not itself be directly subject to the same CRA obligation, however, so its negotiated upstream deadline must not be misdescribed as identical in legal character to the manufacturer’s statutory deadline.
Continuing support requires rights to make and distribute fixes, not merely to receive information. Source-code escrow may be ineffective on a supplier’s insolvency if the build environment, necessary keys, third-party licences or modification and redistribution rights are missing. Release triggers, covered versions, permitted third-party users, confidentiality and costs should be specified, with verification that the deposited material can actually be used. This is a contractual mechanism to consider for meeting long-term obligations, not a statement that the CRA directly requires source-code escrow in every contract.
Finally, the finished-product sales agreement should be reconciled with upstream development and supply contracts. Mismatches emerge when a manufacturer promises lengthy updates while its claims against the supplier expire much sooner, or grants broad customer indemnities while upstream recovery is limited to the purchase price. The objective is not to transfer every burden upstream. Negotiations should establish who performs each task and who arranges an alternative if performance fails, taking account of control, remuneration, remediation capability and insurance. That allocation is part of sustaining the supply chain itself.
6. Response and Liability:
Separating Reporting, Remediation, Penalties and Damages
When a product vulnerability is exploited, reporting, providing users with protective measures, correcting the product and compensating loss are distinct obligations. A CRA submission does not remove the need for customer communications or contractual performance. Nor does the act of reporting alone establish the manufacturer’s liability for every resulting loss. The company should distinguish authority for statutory reporting, technical findings, admissions of liability and settlement, preserving its legal position without obstructing the initial response. [1][3]
Suppose a factory controller requires a fix whose installation will interrupt production. Distributing corrected code alone will not resolve the problem. The parties need to discuss whether interim settings can prevent attack, when the shutdown can take place, who will create backups and how performance will be verified after restoration. The update itself, on-site work, lost production and third-party harm may fall into different contractual allocations. Describing work as necessary for regulatory compliance does not transfer its entire economic burden to the counterparty.
Relevant evidence extends beyond logs identifying the cause. The shipped configuration and assessment, operating conditions disclosed to the customer, availability of updates, user notifications, reasons an update could not be applied and alternatives considered should be assembled into one chronology. Necessary records should be preserved lawfully while urgent protective measures proceed, rather than reconstructing a more convenient explanation later. An investigation does not itself authorise unlimited collection or cross-border sharing of a customer’s personal information, trade secrets or operational data.
For administrative fines, Article 64(2) establishes a ceiling of EUR 15 million or, for an undertaking, 2.5% of its total worldwide annual turnover in the preceding financial year, whichever is higher, for specified infringements of Annex I and Articles 13 and 14. The application date of the CRA’s principal provisions must nevertheless be distinguished from national sanctions that Member States introduce earlier for reporting infringements. Article 14 already applies; that does not support a conclusion that penalties are unavailable throughout the EU until 2027. [1; Articles 64 and 71][17]
Finland’s Act 439/2026 provides a specific example. It makes specified intentional or negligent reporting failures and related infringements subject to an administrative financial penalty, with the relevant provisions applying from 11 September 2026 under section 45. Section 38 establishes the EUR 15 million or 2.5% framework for the relevant manufacturer infringements, while requiring consideration of matters including the nature of the infringement; section 40 provides grounds for non-imposition, including minor infringements. This is an account of the enacted Finnish framework, not an example of an actual penalty at that level or a claim that every Member State uses the same domestic procedure. The national law and application date in each relevant market require separate examination. [17][18][19]
Relief for smaller businesses is not an exemption from the entire compliance regime. Article 64(10), read with the corrigendum of 2 July 2025, provides a derogation from administrative fines for qualifying microenterprises and small enterprises regarding the 24-hour early-warning deadlines under Article 14. Section 40 of the Finnish Act contains a corresponding provision. The derogation does not extend indiscriminately to all medium-sized businesses and does not make the 72-hour notification or final report generally unnecessary. Nor can an ordinary manufacturer obtain the separate treatment of open-source software stewards merely by adopting that label. Size and role must be assessed before describing a provision as an exemption for SMEs generally. [1][2][17]
The principal requirements applying from 2027 also address necessary corrective action, withdrawal and recall, each subject to its own conditions. It is equally inaccurate to state that every newly discovered vulnerability requires an immediate recall of all products or that CE marking prevents authorities from requiring corrective action. The response should be selected by reference to the degree of risk, actual use and the feasibility of remediation. Even before the CRA’s principal application date, other product-safety legislation, contractual liability and non-contractual claims may apply. Continued sale cannot therefore be justified solely by reference to the CRA timetable. [1; Article 13(21) and Chapter V]
The allocation of losses is not determined solely by a contractual liability cap. Regulatory powers, claims by users or third parties, recourse against suppliers and insurance cover must be considered separately, including liabilities that cannot be limited under statute or the governing law. Indemnification or insurance for administrative fines, remediation costs, recalls and a user’s business interruption should not be grouped into one undifferentiated category. Contracts negotiated before an incident should coordinate notification assistance, prompt undisputed remedial work, provisional expense payments and final reconciliation, access to evidence and settlement of third-party claims. Necessary protective measures should not be held up until every issue of ultimate liability is resolved.
7. Board Oversight and M&A:
Bringing Outstanding Support Responsibilities into Valuation
Delegating the CRA entirely to IT or an EU sales office can obscure the full allocation of responsibility. Engineering selects components, sales describes the expected service life and management determines discontinuation dates and budgets. Reporting staff may lack information, support teams may lack rights to implement fixes and post-discontinuation costs may go unfunded, even where each department considers its own decision rational. The board’s task is not simply to recognise the name of the regulation, but to oversee whether the authority, information and funding required for performance are included in the same business plan.
At this stage, it is sensible to track current reporting readiness separately from preparation of products for the 2027 requirements. Reporting arrangements should be tested in operation: product identification, information intake, initial assessment, submission authority and backup coverage. Product work should be scheduled backwards from expected shipments, addressing redesign, conformity assessment routes, continuity of component supply, support periods and sales terms. Distinguishing matters that depend on final standards from work that can already proceed under the legislation helps prevent implementation from being deferred unnecessarily. [1][6][10][11]
In an acquisition of a manufacturer or software business, revenue growth and recurring licence income alone cannot establish value. Diligence should determine the extent of legacy versions, the support periods represented to customers and the remaining duration of supply arrangements underpinning those commitments. Post-acquisition expenditure can increase not only because of known vulnerabilities, but because affected products cannot be identified, customer contacts have been lost or the development environment needed to reproduce a fix no longer exists. Legal due diligence should move beyond the existence of compliance representations to the records needed to demonstrate and deliver performance.
That review does not require unrestricted disclosure of every line of code to the purchaser. A proportionate sample may be selected by product category, sales scale, remaining support and operating environment, with configuration records, response histories, notices and agreements compared against actual builds. The answer that an SBOM exists should prompt further questions: which marketed version does it cover, who updates it and what verifies it? Customer confidentiality and third-party rights may require limits on the scope and method of disclosure, while preserving a lawful basis for the necessary assessment.
A share acquisition leaves the target as the same legal entity; its obligations concerning previously supplied products do not disappear at completion. In a business transfer, the parties need to identify the products, intellectual property and support agreements transferred, the manufacturer identification and the persons responsible for reports and user communications. Their allocation of historic liabilities between themselves does not freely determine their statutory position towards regulators or users. Upstream licences, remote services, distribution infrastructure and customer consents should be addressed together so that compliance and support do not lapse after closing.
Beyond general compliance warranties, acquisition documentation should deal specifically with identified unremediated matters, mismatched support and supplier end dates, historic authority and customer communications, rights to implement fixes and missing records. The appropriate response may involve a price adjustment, retention, specific indemnity, pre-closing remediation or transition support, depending on the facts. An abstract clause making the seller responsible for all future vulnerabilities may protect safety and value less effectively than an agreement identifying who must cure known deficiencies, by when, and what happens if they cannot be cured.
Product responsibilities also matter when a business closes. Article 13(23) requires a manufacturer whose cessation of operations will prevent CRA compliance to notify the relevant market surveillance authorities and, to the extent possible, users before cessation takes effect. Support, continued availability of issued updates, reporting and customer commitments cannot all be disposed of through an internal resolution to discontinue the business. In preparation for the principal requirements, exit planning should address continued supply, transfer of the business, assistance with user migration and retention of data and evidence. [1]
The CRA requires more than attaching legal documents to a product. The business must be able to explain, before and after sale, who decides the design, what is supplied to the market, how long security will be maintained and what authority and funding make that possible. For Japanese businesses seeking durable credibility in the EU, technical quality and contractual quality should operate together as arrangements through which users can actually obtain support. Those arrangements are a compliance cost, but they are also an asset supporting continuing trade and enterprise value.
Frequently Asked Questions: The CRA and Japanese Businesses
Q1. Can a business wait until 2027 before addressing the CRA?
No. The principal requirements apply from 11 December 2027, but manufacturers’ reporting obligations under Article 14 have applied since 11 September 2026. Reporting readiness is a current requirement, including for relevant products already placed on the EU market. [1][5]
Q2. Can a Japanese company be subject to the CRA if it has no EU subsidiary
and exports through a distributor?
Yes. A manufacturer’s responsibilities for relevant products marketed under its own name or trademark are not determined solely by whether it has an EU establishment. The manufacturer, importer and distributor must be identified separately, and a manufacturer without a main establishment in the EU must determine its reporting destination under Article 14(7). [1]
Q3. Are all cloud services and SaaS offerings outside the CRA?
No categorical exclusion should be assumed. General remote services must be distinguished from remote data processing designed and developed under a manufacturer’s responsibility, without which a product could not perform one of its functions. The functional relationship with the product and the party bearing responsibility matter more than the service’s commercial label. [1][3]
Q4. Does discontinuing sales or support eliminate reporting obligations?
Not by itself. The Commission explains that reporting continues after support ends. Continuing reportability does not, however, extend every CRA vulnerability-handling obligation indefinitely. [3][7]
Q5. Must the authorities be notified whenever a vulnerability
in an incorporated OSS component is published?
Publication alone is insufficient to determine reportability. The manufacturer should assess exploitability and actual exploitation in its product and whether a severe incident has occurred. Component information must be matched to the effect on the finished product; even if mandatory reporting is not triggered, remediation and customer obligations require separate consideration. [3][7]
Q6. Does an early warning within 24 hours provide a further 72 hours for the next notification?
No. Both the 24-hour early-warning period and the 72-hour notification period run from awareness, and reporting must occur without undue delay. Rather than waiting for a completed investigation or a management meeting, the company should report in stages, distinguishing established facts from matters still under investigation. [1]
Q7. Is the final-report deadline the same for vulnerabilities and incidents?
No. For an actively exploited vulnerability, the final report is due no later than 14 days after a corrective or mitigating measure becomes available. For a severe incident, it is due within one month after submission of the 72-hour notification. The respective periods and triggers must be controlled separately. [1][7]
Q8. Is stating a five-year support period sufficient?
Not necessarily. Five years is generally the minimum, and the determination must take account of the period for which the product is expected to be used and other relevant factors. Although the legislation addresses products with an expected use period below five years, it does not justify automatically ending support for long-lived products after five years. [1][13]
Q9. May security updates be restricted to users with paid maintenance agreements?
A general paid-maintenance clause does not establish that position. Point (8) of Part II of Annex I generally requires free security updates and expressly excepts a different agreement between the manufacturer and a business user for a tailor-made product. Ending remediation for earlier software versions by moving users to the latest version separately requires Article 13(10)’s scope and conditions to be met; it does not extinguish other vulnerability-handling duties wholesale. Updates must also be distinguished from added functionality and implementation work. [1; Article 13(10) and Annex I, Part II, point (8)][3; paragraph 131]
Q10. Does preparing an SBOM require all source code to be made public?
The CRA’s SBOM requirement is not equivalent to a general source-code publication duty. Disclosure to authorities, contractual disclosure, OSS licence conditions and public technical documentation associated with particular conformity assessment routes must be examined separately. [1][10][15]
Q11. Does every product require third-party certification before EU sale?
No. Self-assessment is available for products in the default category, while the route for important and other specified products depends on classification, applicable standards or certification and relevant exceptions. The Article 32(5) OSS route requires public technical documentation at the time of placement on the market. Classification must reflect the product’s own core functionality, not merely a component’s functions. EHR systems also require separate attention to the EHDS amendment and phased application. [1][9][10][20]
Q12. Are financial penalties for reporting failures unavailable until 2027?
That should not be assumed. Finland’s Act 439/2026 applies sanctions for specified reporting failures and related infringements from 11 September 2026. The conditions, exceptions and procedures require review under the relevant Member State’s law. The early-warning deadline derogation for qualifying smaller enterprises is not an exemption from all reporting. [17][18][19]
About the Legal Update Series by Managing Partner Kenshiro Michishita
Through the Legal Update series by Managing Partner Kenshiro Michishita, SAKURA Law Office publishes legal analysis on corporate matters, international transactions, M&A, technology and data, and corporate crisis response. This edition connects overseas regulation with Japanese-side development, sales and procurement agreements, board decisions and post-acquisition operations. It distinguishes statutory obligations from administrative interpretation, technical materials and practical recommendations, enabling readers to trace the analysis to the underlying primary sources.
Information about the firm and the author is available on the SAKURA Law Office official website and the Managing Partner’s profile.
How SAKURA Law Office Can Assist
Product and software businesses supplying the EU market should examine the allocation of manufacturer and other roles, alignment of development, OEM, component supply, support and distribution agreements, vulnerability communications and preservation of rights, intellectual property and confidential information, product-business acquisitions and internal crisis decisions as connected aspects of the transaction. SAKURA Law Office accepts instructions concerning the related Japanese-law and international contractual, governance and dispute-response issues.
The application of EU and individual Member State law, regulatory reporting, conformity assessment and technical security conclusions may require verification with appropriately qualified and authorised professionals in the relevant jurisdiction, assessment bodies and technical specialists. Legal counsel cannot guarantee certification, regulatory authorisation or product security. The necessary review and allocation of responsibility should be defined by reference to the actual business and transaction.
Contact
SAKURA Law Office
Ark Hills South Tower 4F, 1-4-5 Roppongi, Minato-ku, Tokyo 106-0032, Japan
Managing Partner Kenshiro Michishita
Principal References
Numbered citations and source titles link to the underlying materials. Article references are to the CRA unless stated otherwise. The English text of EU legislation supplies the legal terminology; Japanese terminology is explanatory. Reference 3 is published draft guidance approved as to content, not legislation. The original analytical cut-off is 2 November 2026; verification and revision took place on 13 November. The later SRP update is expressly identified. References 15 and 17 also identify the co-publisher or reproduced legislative text used on reverification.
Adopted 23 October 2024; published in the Official Journal on 20 November 2024; entered into force 10 December 2024. Relevant provisions include Articles 2, 3, 7, 8, 13, 14, 24, 27–32, 64, 69 and 71, and Annex I. Article 64(10) is read with reference 2. EUR-Lex’s text incorporating corrigenda was also used for comparison. Text incorporating corrigenda (EUR-Lex)
2. Official Journal of the European Union | Corrigendum to Regulation (EU) 2024/2847 (2025/90555)
2 July 2025. Corrects the introductory cross-reference in Article 64(10) from paragraphs 3–9 to paragraphs 2–9. This is the formal corrigendum concerning derogations from administrative fines, not commentary.
Published 27 July 2026; English annex hosted on an official EU platform. Its cover identifies it as draft guidance approved as to content by the Commission. It does not amend the Regulation; final in the document identifier does not confer binding legal force. References include paragraphs 13–16, 131 and 210–221, Sections 2–5 and 8, and Section 9.2.
27 July 2026. Official announcement and access to the annex at reference 3. The description on the publication page should be read alongside the annex cover identifying a draft approved as to content.
5. ENISA | The CRA Single Reporting Platform is launched
11 September 2026. Official announcement of the application of Article 14 and commencement of SRP operations.
6. ENISA | Single Reporting Platform (SRP)
Rechecked 13 November 2026. ENISA announced an upgrade to version 1.3 on 4 November, after the original cut-off, with operating documentation being updated. Official portal for registration, manuals and CSIRT information. Descriptions of earlier screens and functions are not a guarantee of their unchanged operation.
7. ENISA | Single Reporting Platform: Frequently Asked Questions
FAQ marked updated 15 October 2026, rechecked on 13 November. Covers awareness, legacy products, reporting destinations, operational representatives, outages, counters and the application date for OSS stewards, including FAQs 25–30. This document version must be distinguished from the 4 November system update. Statutory deadlines derive from the legislation.
8. European Commission | Commission Delegated Regulation (EU) 2026/881
Adopted 11 December 2025; published in the Official Journal on 20 April 2026. Specifies conditions for applying cybersecurity-related grounds for delaying dissemination of notifications. The receiving CSIRT’s treatment of information is distinct from the manufacturer’s initial reporting deadline.
9. European Commission | Commission Implementing Regulation (EU) 2025/2392
Adopted 28 November 2025; published in the Official Journal on 1 December 2025. Establishes technical descriptions of the categories of important and critical products listed in CRA Annexes III and IV. Classification also requires the CRA provisions and the product’s actual specifications to be examined.
10. European Commission | Cyber Resilience Act — Conformity assessment
Marked updated 31 July 2026; reviewed for the Japanese edition on 2 November 2026. Official explanation of self-assessment, assessment routes for important and other specified products, qualifying certification schemes and special treatment of OSS.
11. European Commission | Cyber Resilience Act — Standardisation
Marked updated 31 July 2026; reviewed for the Japanese edition on 2 November 2026. Official material on the standardisation request and the relationship between harmonised standards and the CRA. A development timetable does not establish that an individual standard’s reference has been published in the Official Journal.
13 August 2026. The standardisation body’s own announcement of approval procedures for product-specific draft standards. Describes their procedural status when published, rather than establishing adoption of every standard or publication of Official Journal references.
13. European Commission | Cyber Resilience Act — Manufacturers
Marked updated 14 August 2026; reviewed for the Japanese edition on 2 November 2026. Official explanation of manufacturers’ risk assessments, support, updates and user information. Application dates must be read with CRA Article 71.
14. European Commission | Cyber Resilience Act — Open source
Marked updated 15 October 2026; reviewed for the Japanese edition on 2 November 2026. Official explanation distinguishing commercial activity, OSS, manufacturers and open-source software stewards.
Official announcement, Joint guidance on minimum elements for a software bill of materials, marked modified 29 July 2026. Confirms the update to the 2021 material and the role of baseline data fields, practices and processes in understanding supply-chain risk. This is distinct from CRA Annex I’s statutory minimum. Links to the full joint publication and its Australian hosting page are also provided. Full joint publication (CISA) Australian Government hosting page
Reviewed for the Japanese edition on 2 November 2026. Official Japanese-language explanation of Japan’s security-requirements conformity assessment and labelling scheme. Cited to distinguish domestic arrangements from CRA assessment procedures.
Dated 29 May 2026; published 1 June. Sections 7, 31(1)(23)–(26), 38, 40 and 45 were compared for reporting penalties, exceptions and application from 11 September. Finlex’s legislative listing and Edilex’s reproduction of the same Finnish Statute Book text were used. Edilex is not a government host; the legislative text is distinguished from its hosting provider. Statute Book PDF reproduction (Edilex)
Official guidance consulted on 13 November 2026; the page is marked updated 30 July. Covers the regime, application dates and reporting arrangements. The specific conditions for penalties derive from reference 17.
2 June 2026. Authority announcement concerning the national supplementary legislation and reporting from the autumn. The conditions, amounts and application dates of sanctions are governed by the legislative text at reference 17.
20. European Parliament and Council | Regulation (EU) 2025/327 (European Health Data Space)
Adopted 11 February 2025; published 5 March. Article 104 amends the CRA; Article 105 governs application. Relevant to the new Article 32(5a) and associated provisions, not a statement that all EHR duties apply together in 2027. The Official Journal PDF hosted by Spain’s Ministry of Health was also consulted. Official Journal PDF (Spanish Ministry of Health)
Disclaimer
This publication retains its original analytical cut-off of 2 November 2026 and was verified and revised on 13 November. The post-cut-off SRP update is expressly identified. It provides general legal information, not a legal opinion on a particular product, business, incident, contract or investment, a conformity certification or an assurance of security. Entry into force, application of individual provisions, Member State legislation, published draft guidance, ENISA interpretation and private contracts have different legal significance. The principal requirements applying from 2027 are not presented as already generally applicable in 2026.
Product scope, remote data processing, the roles of manufacturers and other parties, placement on the market, substantial modification, support periods, reporting criteria, penalties and liability depend on actual configuration, supply arrangements, distribution channels, the time of awareness, contracts and applicable law. The discussion of Finland illustrates that country’s framework; it is not a comprehensive review of national legislation or enforcement practice in every EU Member State. Medical-device, EHR-system and other sector-specific rules, personal-data protection, network and information-system security requirements and product liability require separate consideration.
This publication does not involve technical testing, a source-code audit or consultation with authorities concerning an individual product. Legislative amendments, Official Journal publication of harmonised-standard references, regulatory interpretation and SRP functionality and procedures may change. Before developing or supplying a product, making a report, completing an acquisition or closing a business, the parties should review current authoritative legislation, official materials and relevant contracts with appropriately qualified legal and technical professionals.